期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
苏州跨东方大道钢混凝土结合梁施工技术
1
作者 韦玉林 《公路》 北大核心 2016年第1期134-137,共4页
苏州市斜港大桥引桥部分跨东方大道采用钢混凝土结合梁构造,跨中28m部分为钢结构。着重介绍跨中28m钢箱梁吊装、横移到位、钢混凝土结合段施工工艺,细化了跨既有路线交通流疏导及组织,为市政工程中类似钢混凝土结合梁桥施工提供一定的... 苏州市斜港大桥引桥部分跨东方大道采用钢混凝土结合梁构造,跨中28m部分为钢结构。着重介绍跨中28m钢箱梁吊装、横移到位、钢混凝土结合段施工工艺,细化了跨既有路线交通流疏导及组织,为市政工程中类似钢混凝土结合梁桥施工提供一定的借鉴。 展开更多
关键词 钢混凝土结合梁 钢梁节段吊装 横向顶推 交通组织 疏导
原文传递
Geometric state transfer method for construction control of a large-segment steel box girder with hoisting installation 被引量:6
2
作者 Jin-feng WANG Hua-wei XIANG +2 位作者 Jiang-tao ZHANG Tian-mei WU Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第5期382-391,共10页
This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a ... This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a large-segment steel box girder are determined, such as the manufacturing parameters of the top and bottom slabs, the width of the annular joint, and the support position. Second, the geometric state equations and state transfer matrixes of large-segment steel box girders under different conditions are deduced by taking the mileage and elevation of control points as basic state variables. In application of the geometric state transfer method in the construction control of the Hong Kong-Zhuhai-Macao Bridge, the width of the annular joint and the position parameters for the support of the large-segment steel box girder are predicted precisely. Moreover, the manufacturing parameters of the top and bottom slabs of the steel box girders are calculated reliably. The measured values show that the width of the annular joint is basically the same with the difference of less than 2 mm, the eccentricity of bridge support is less than 20 mm, and the elevation error of the bridge deck is within-10 mm to +15 mm, which meets the construction accuracy. Using the geometric state transfer method, the rapid and accurate installation of the Hong Kong-Zhuhai-Macao Bridge has been realized, demonstrating that the precise control of the geometric state of a steel box girder with ectopic installation and multi-state transition can be realized by using the geometric state transfer method. 展开更多
关键词 Large-segment steel box girder Offshore hoisting Construction control Geometric state Transfer matrix
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部