New and high transparent structural element, steel-glass composite beam was developed in respect to fabrication, static-structural and architectural criteria and consists of steel flanges and glass web assembled toget...New and high transparent structural element, steel-glass composite beam was developed in respect to fabrication, static-structural and architectural criteria and consists of steel flanges and glass web assembled together by semi-rigid polymer adhesive, which is the key element of whole composite system. These beams can be used mainly as members of high transparent roof or floor structure as well as stiffening fins for large area glass facades. This paper deals with experimental research performed at CTU (Czech Technical University) Prague, which started by adhesive selection and initial material tests by ISO527, continued via small-scale steel-glass connection tests and graduated by full-scale tests of hybrid beams with the span of 4 m. Generalized results of these experiments, analytical and numerical studies serve as device, how to accurately predict the behavior of the beam, describe the stress distribution along the cross section and safely and economically design such a kind of structure with semi-rigid shear connection, made by polymer adhesive.展开更多
Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure...Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure,mechanical characteristics and transmission routes of deck loads.The simplified calculation models were brought out for the stud design of the longitudinal girders and transverse girders in the composite floor system of Nanjing Dashengguan Yangtze River Bridge (NDB).Studs were designed and arranged by taking the middle panel of 336 m main span for example.The results show that under deck loads,the longitudinal girders in the composite floor system of through steel bridges are in tension-bending state,longitudinal shear force on the interface is caused by both longitudinal force of "The first mechanical system" and vertical bending of "The second mechanical system",and studs can be arranged with equal space in terms of the shear force in range of 0.2d (where d is the panel length) on the top ends.Transverse girders in steel longitudinal and transverse girders-concrete slab composite deck are in compound-bending state,and out-of-plane bending has to be taken into account in the stud design.In orthotropic integral steel deck-concrete slab composite deck,out-of-plane bending of transverse girders is very small so that it can be neglected,and studs on the orthotropic integral steel deck can be arranged according to the structural requirements.The above design methods and simplified calculation models have been applied in the stud design of NDB.展开更多
The architecture of footbridge design takes the form of a number of submissions from leading architects and engineers, each setting out their views on bridge design--present and future. It looks at the functions of a ...The architecture of footbridge design takes the form of a number of submissions from leading architects and engineers, each setting out their views on bridge design--present and future. It looks at the functions of a bridge, defining purpose of place and context, the spirit of creativity and the reasoned progression of an idea. It also explores the exploitation of materials technology and construction innovation and the tension between lightness and mass and between sculpture and scale. Present parameters of tempered and laminated glass create possibility of modern architecture of footbridges which are being full of transparency and light reflex effects. Four projects, using glass panels designed by Santiago Calatrava, have been presented in this paper. GFRP (glass fiber retrofit polymer) makes new horizon in material technology, helps to enrich new conception of structure with longer durability, low weight of deck and new creation of architecture line. The paper has described a few results of FEM (finite element method) analysis of footbridge with modular bridge GFRP deck system. The footbridge was excited by impact and human-induced vibrations. Composite material consists of glass fibers and polymer matrix is a promising alternative against traditional materials. New architecture and modern material engineering are looking for fresh possibilities of form and shape of structure, long durability and extraordinary technical parameters of building elements.展开更多
Smoothed particle hydrodynamics (SPH) is a useful meshless method.The first and second orders are the most popular derivatives of the field function in the mechanical governing equations.New methods were proposed to i...Smoothed particle hydrodynamics (SPH) is a useful meshless method.The first and second orders are the most popular derivatives of the field function in the mechanical governing equations.New methods were proposed to improve accuracy of SPH approximation by the lemma proved.The lemma describes the relationship of functions and their SPH approximation.Finally,the error comparison of SPH method with or without our improvement was carried out.展开更多
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c...Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.展开更多
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica...Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.展开更多
PLANNED in 2003,construction of the 1,092-meter-long ShanghaiNantong Railway Yangtze River Bridge–the world’s longest rail-cumroad cable-stayed steel bridge–started in 2014.On completion in 2019,it will span the 13...PLANNED in 2003,construction of the 1,092-meter-long ShanghaiNantong Railway Yangtze River Bridge–the world’s longest rail-cumroad cable-stayed steel bridge–started in 2014.On completion in 2019,it will span the 130 km.between the two cities,shortening to one hour the drive from Shanghai to Nantong.展开更多
In this paper the analysis of tensile stress distribution in flexural continuous T- beam has been presented. The observed damages in carrying deck of RC bridge over the Wieprz River in Baranow indicate that over pilla...In this paper the analysis of tensile stress distribution in flexural continuous T- beam has been presented. The observed damages in carrying deck of RC bridge over the Wieprz River in Baranow indicate that over pillar zones are not protected enough. The results of numerical analysis have shown that tensile stress in T- section beam appears not only in a web but in flanges as well. Thus reinforcing bars should be distributed within the whole effective width. This fact is mentioned in building codes, for example, in Eurocode 2: "Design of concrete structures", both in part 1.1 "General rules and rules for building" and in part 2 "Reinforced and prestressed concrete bridges", but there are not detailed rules how to place the bars in flanges of T-section.展开更多
文摘New and high transparent structural element, steel-glass composite beam was developed in respect to fabrication, static-structural and architectural criteria and consists of steel flanges and glass web assembled together by semi-rigid polymer adhesive, which is the key element of whole composite system. These beams can be used mainly as members of high transparent roof or floor structure as well as stiffening fins for large area glass facades. This paper deals with experimental research performed at CTU (Czech Technical University) Prague, which started by adhesive selection and initial material tests by ISO527, continued via small-scale steel-glass connection tests and graduated by full-scale tests of hybrid beams with the span of 4 m. Generalized results of these experiments, analytical and numerical studies serve as device, how to accurately predict the behavior of the beam, describe the stress distribution along the cross section and safely and economically design such a kind of structure with semi-rigid shear connection, made by polymer adhesive.
基金Project(2004G016-B) supported by the Science and Technology Development Program of Railways Department,China
文摘Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure,mechanical characteristics and transmission routes of deck loads.The simplified calculation models were brought out for the stud design of the longitudinal girders and transverse girders in the composite floor system of Nanjing Dashengguan Yangtze River Bridge (NDB).Studs were designed and arranged by taking the middle panel of 336 m main span for example.The results show that under deck loads,the longitudinal girders in the composite floor system of through steel bridges are in tension-bending state,longitudinal shear force on the interface is caused by both longitudinal force of "The first mechanical system" and vertical bending of "The second mechanical system",and studs can be arranged with equal space in terms of the shear force in range of 0.2d (where d is the panel length) on the top ends.Transverse girders in steel longitudinal and transverse girders-concrete slab composite deck are in compound-bending state,and out-of-plane bending has to be taken into account in the stud design.In orthotropic integral steel deck-concrete slab composite deck,out-of-plane bending of transverse girders is very small so that it can be neglected,and studs on the orthotropic integral steel deck can be arranged according to the structural requirements.The above design methods and simplified calculation models have been applied in the stud design of NDB.
文摘The architecture of footbridge design takes the form of a number of submissions from leading architects and engineers, each setting out their views on bridge design--present and future. It looks at the functions of a bridge, defining purpose of place and context, the spirit of creativity and the reasoned progression of an idea. It also explores the exploitation of materials technology and construction innovation and the tension between lightness and mass and between sculpture and scale. Present parameters of tempered and laminated glass create possibility of modern architecture of footbridges which are being full of transparency and light reflex effects. Four projects, using glass panels designed by Santiago Calatrava, have been presented in this paper. GFRP (glass fiber retrofit polymer) makes new horizon in material technology, helps to enrich new conception of structure with longer durability, low weight of deck and new creation of architecture line. The paper has described a few results of FEM (finite element method) analysis of footbridge with modular bridge GFRP deck system. The footbridge was excited by impact and human-induced vibrations. Composite material consists of glass fibers and polymer matrix is a promising alternative against traditional materials. New architecture and modern material engineering are looking for fresh possibilities of form and shape of structure, long durability and extraordinary technical parameters of building elements.
基金The National Natural Science Foundation of China(No.50778111)The Key Project of Fund of Science and Technology Development of Shanghai(No.07JC14023)
文摘Smoothed particle hydrodynamics (SPH) is a useful meshless method.The first and second orders are the most popular derivatives of the field function in the mechanical governing equations.New methods were proposed to improve accuracy of SPH approximation by the lemma proved.The lemma describes the relationship of functions and their SPH approximation.Finally,the error comparison of SPH method with or without our improvement was carried out.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)
文摘Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.
基金National Science and Technology Support Program of China ( No. 2009BAG15B01) Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-170)
文摘Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.
文摘PLANNED in 2003,construction of the 1,092-meter-long ShanghaiNantong Railway Yangtze River Bridge–the world’s longest rail-cumroad cable-stayed steel bridge–started in 2014.On completion in 2019,it will span the 130 km.between the two cities,shortening to one hour the drive from Shanghai to Nantong.
文摘In this paper the analysis of tensile stress distribution in flexural continuous T- beam has been presented. The observed damages in carrying deck of RC bridge over the Wieprz River in Baranow indicate that over pillar zones are not protected enough. The results of numerical analysis have shown that tensile stress in T- section beam appears not only in a web but in flanges as well. Thus reinforcing bars should be distributed within the whole effective width. This fact is mentioned in building codes, for example, in Eurocode 2: "Design of concrete structures", both in part 1.1 "General rules and rules for building" and in part 2 "Reinforced and prestressed concrete bridges", but there are not detailed rules how to place the bars in flanges of T-section.