钢箱梁大节段安装临时支架空间状态分析 被引量:7
1
作者 王行耐 彭霞 《公路》 北大核心 2009年第9期67-73,共7页
针对青岛海湾大桥沧口航道斜拉桥钢箱梁大节段施工,其海上安装高度高、节段自重大及施工工期长等特点,对钢箱梁安装临时支架进行专项设计计算,对临时支架的构造细节和安装顺序进行了介绍;并采用MIDAS建立了其空间有限元模型,参照现行的... 针对青岛海湾大桥沧口航道斜拉桥钢箱梁大节段施工,其海上安装高度高、节段自重大及施工工期长等特点,对钢箱梁安装临时支架进行专项设计计算,对临时支架的构造细节和安装顺序进行了介绍;并采用MIDAS建立了其空间有限元模型,参照现行的桥梁设计规范,确定相关计算参数、工况和计算荷载,对支架整体结构的变形、应力和振动特性进行分析,并对十字梁的变形和局部应力等关键性问题进行了详细的阐述。计算结果表明,钢箱梁安装临时支架在各种工况下强度及变形满足要求,且具有较大的安全储备,可为今后同类型钢箱梁大节段安装临时支架的设计计算提供参考。 展开更多
关键词 钢箱梁大节段施工 临时支架 设计计算 空间有限元 海上安装
原文传递
Geometric state transfer method for construction control of a large-segment steel box girder with hoisting installation 被引量:6
2
作者 Jin-feng WANG Hua-wei XIANG +2 位作者 Jiang-tao ZHANG Tian-mei WU Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第5期382-391,共10页
This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a ... This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a large-segment steel box girder are determined, such as the manufacturing parameters of the top and bottom slabs, the width of the annular joint, and the support position. Second, the geometric state equations and state transfer matrixes of large-segment steel box girders under different conditions are deduced by taking the mileage and elevation of control points as basic state variables. In application of the geometric state transfer method in the construction control of the Hong Kong-Zhuhai-Macao Bridge, the width of the annular joint and the position parameters for the support of the large-segment steel box girder are predicted precisely. Moreover, the manufacturing parameters of the top and bottom slabs of the steel box girders are calculated reliably. The measured values show that the width of the annular joint is basically the same with the difference of less than 2 mm, the eccentricity of bridge support is less than 20 mm, and the elevation error of the bridge deck is within-10 mm to +15 mm, which meets the construction accuracy. Using the geometric state transfer method, the rapid and accurate installation of the Hong Kong-Zhuhai-Macao Bridge has been realized, demonstrating that the precise control of the geometric state of a steel box girder with ectopic installation and multi-state transition can be realized by using the geometric state transfer method. 展开更多
关键词 Large-segment steel box girder Offshore hoisting Construction control Geometric state Transfer matrix
原文传递