作者 元秋英 《中文科技期刊数据库(引文版)工程技术》 2016年第12期282-282,共1页
随着中国钢材产量的提高,钢结构加工与制造技术的发展,钢桥的建造数量在不断地增加。特别在市政道路的高架桥中,钢箱梁因其抗扭性能好、施工速度快、施工可减少对交通的影响等优点受到越来越多的桥梁工程师的青睐和关注。该文对连续钢... 随着中国钢材产量的提高,钢结构加工与制造技术的发展,钢桥的建造数量在不断地增加。特别在市政道路的高架桥中,钢箱梁因其抗扭性能好、施工速度快、施工可减少对交通的影响等优点受到越来越多的桥梁工程师的青睐和关注。该文对连续钢箱梁桥的发展进行简要的回顾,通过收集大量的实桥资料,从数量、跨径、箱梁构造形式等方面,对其进行统计分析,为进一步研究和应用连续钢箱梁桥提供参考。 展开更多
关键词 钢箱梁安装过程 线型控制总结
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
2
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 Taizhou Bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
Control measures for thermal effects during placement of span-scale girder segments on continuous steel box girder bridges 被引量:3
3
作者 Jin-feng WANG Jiang-tao ZHANG +1 位作者 Zhong-xuan YANG Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第4期255-267,共13页
In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a ... In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a span-scale girder segment is temporarily stored in the open air, temperature gradients will significantly increase the maximum reaction force on temporary supports and cause local buckling at the bottom of the girder segment. Secondly, due to the temperature difference of the girder segments before and after girth-welding, some residual thermal deflections will appear on the girder segments because the boundary conditions of the structure are changed by the girth-welding. Thirdly, the thermal expansion and thermal bending of girder segments will cause movement and rotation of bearings, which must be considered in setting bearings. We propose control measures for these problems based on finite element method simulation with field-measured temperatures. The local buckling during open-air storage can be avoided by reasonably determining the appropriate positions of temporary supports using analysis of overall and local stresses. The residual thermal deflections can be overcome by performing girth-welding during a period when the vertical temperature difference of the girder is within 1 °C, such as after 22:00. Some formulas are proposed to determine the pre-set distances for bearings, in which the movement and rotation of the bearings due to dead loads and thermal loads are considered. Finally, the feasibility of these control measures in the placement of span-scale girder segments on a real continuous girder was verified: no local buckling was observed during open-air storage;the residual thermal deflections after girth-welding were controlled within 5 mm and the residual pre-set distances of bearings when the whole continuous girder reached its design state were controlled within 20 mm. 展开更多
关键词 Steel box girder Span-scale girder segments Construction process Thermal effects Control measures