期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
国家体育场混凝土斜(扭)柱泵送顶升施工工艺 被引量:2
1
作者 张从思 杨俊峰 +1 位作者 胡伟兵 朱同然 《施工技术》 CAS 北大核心 2006年第10期5-7,共3页
国家体育场跨层斜(扭)柱斜长最长达22.8m,模板采用矩形钢箱模永久性模板,混凝土浇筑采用泵送顶升施工工艺。本文总结了钢筋混凝土柱泵送顶升混凝土的过程,为今后类似工程提供可借鉴的施工方法。
关键词 国家体育场 斜(扭)柱 矩形钢箱模 泵送顶升混凝土
下载PDF
高水位砂土地质条件下坑中坑施工技术 被引量:3
2
作者 黄坛邦 衡武浩 +2 位作者 陈建锋 罗蛟均 任锦冠 《建筑技术开发》 2021年第8期28-29,共2页
金山橘园工业园区项目A位于福州市仓山区金山工业园橘园片区。项目先进行基坑整体支护与降排水施工,再采用预制钢箱模、沉井等施工方法进行坑中坑施工,克服了流砂、大量涌水等不利因素,保证了项目施工周期和质量。
关键词 坑中坑 砂土地质:高水位 钢箱模 沉井
下载PDF
Estimating extreme temperature differences in steel box girder using long-term measurement data 被引量:5
3
作者 丁幼亮 王高新 《Journal of Central South University》 SCIE EI CAS 2013年第9期2537-2545,共9页
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ... The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate. 展开更多
关键词 structural health monitoring cable-stayed bridge steel box girder temperature difference extreme value analysis
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部