In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel ...In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel drive shaft, achieved the perfect assemble with transmission structure of the original power unit. It could interconvert according to need by using two sets of drive shafts with direct and reverse circulation. The repacked G-3 engineering driller carried on experiment in the field test in Luanchuan molybdenum mine of Henan, whose effect was very good.展开更多
In this paper,the performance analysis of recharging the borehole by means of exhaust-air energy is carried out.The results show that a vertical borehole used as heat source for a Ground Source Heat Pump(GSHP)can be r...In this paper,the performance analysis of recharging the borehole by means of exhaust-air energy is carried out.The results show that a vertical borehole used as heat source for a Ground Source Heat Pump(GSHP)can be recharged in high efficiency.With equal heat transfer capabilities of exhaust-air coil and borehole collector,the system provides a maximum overall efficiency.However,due to ground infinite capacity,the optimum brine flow rate is different from conventional two-exchanger system.The recharging system provides two peak overall efficiencies when the capacity ratio Cr=5 for laminar flow and Cr=15 for turbulent flow respectively.The overall efficiency is independent of exhaust-air temperature and undisturbed ground temperature,although the fluid properties depend on temperature.In practical system lower ethyl percentage brine should be chosen if the freezing point meets the system request,which can provide a higher overall efficiency.展开更多
基金Project of Science & Technology Development Guidance of Jilin Province (No.200405033)
文摘In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel drive shaft, achieved the perfect assemble with transmission structure of the original power unit. It could interconvert according to need by using two sets of drive shafts with direct and reverse circulation. The repacked G-3 engineering driller carried on experiment in the field test in Luanchuan molybdenum mine of Henan, whose effect was very good.
文摘In this paper,the performance analysis of recharging the borehole by means of exhaust-air energy is carried out.The results show that a vertical borehole used as heat source for a Ground Source Heat Pump(GSHP)can be recharged in high efficiency.With equal heat transfer capabilities of exhaust-air coil and borehole collector,the system provides a maximum overall efficiency.However,due to ground infinite capacity,the optimum brine flow rate is different from conventional two-exchanger system.The recharging system provides two peak overall efficiencies when the capacity ratio Cr=5 for laminar flow and Cr=15 for turbulent flow respectively.The overall efficiency is independent of exhaust-air temperature and undisturbed ground temperature,although the fluid properties depend on temperature.In practical system lower ethyl percentage brine should be chosen if the freezing point meets the system request,which can provide a higher overall efficiency.