In 2006, SOMAIR decided to increase the uranium production by 50% using heap leaching for the treatment of low grade ores. These ores, which come from different lodes with various properties, have been studied in four...In 2006, SOMAIR decided to increase the uranium production by 50% using heap leaching for the treatment of low grade ores. These ores, which come from different lodes with various properties, have been studied in four steps: ( 1 ) Lab tests: to compare the ores (characterization, acid consumptions, recovery...); (2) Column tests on an average sample: to define significant parameters for a feasibility study; (3) Column tests on specific samples: to optimize recovery for each ore and identify problems of percolation due to the clays; (4) Pilot tests in large boxes (stalls): to validate process parameters. Uranium production by heap leaching started in July 2009.展开更多
文摘In 2006, SOMAIR decided to increase the uranium production by 50% using heap leaching for the treatment of low grade ores. These ores, which come from different lodes with various properties, have been studied in four steps: ( 1 ) Lab tests: to compare the ores (characterization, acid consumptions, recovery...); (2) Column tests on an average sample: to define significant parameters for a feasibility study; (3) Column tests on specific samples: to optimize recovery for each ore and identify problems of percolation due to the clays; (4) Pilot tests in large boxes (stalls): to validate process parameters. Uranium production by heap leaching started in July 2009.