期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
一季度铁路基建投资回暖
1
《铁道建筑》 北大核心 2013年第5期37-37,共1页
2013年1至3月,全国铁路完成基本建设投资545.1亿元,同比增加119.2亿元,增长28.0%。铁路建设保持了加快推进的态势。
关键词 铁路基建设 投资 项目施工进度 中国铁路总公司
下载PDF
Accessibility for High Asia:Comparative Perspective on Northern Pakistan's Traffic Infrastructure and Linkages with Its Neighbours in the Hindukush- Karakoram-Himalaya 被引量:3
2
作者 Hermann Kreutzmann 《Journal of Mountain Science》 SCIE CSCD 2004年第3期193-210,共18页
Starting with a discussion of development concepts which were applied in practice and which followed the developmentalist paradigm the expansion of traffic infrastructure in colonial and post-colonial periods is prese... Starting with a discussion of development concepts which were applied in practice and which followed the developmentalist paradigm the expansion of traffic infrastructure in colonial and post-colonial periods is presented for the High Asian mountain rim. Selective railways and roads are the major feature of this development, which aimed first on serving the convenience of hill station visitors and followed strategic considerations later on. This bias between regional planning and implementation remains a characteristic feature. At the same time traffic infrastructure without asphalt roads is important for the mountain areas, thus breaking up the strong correlation between development and asphalt roads. 展开更多
关键词 KARAKORAM HIMALAYA Pakistan Karakoram Highway ACCESSIBILITY trade networks road systems development
下载PDF
Engineering Geological Assessment for Route Selection of Railway Line in Geologically Active Area:A Case Study in China 被引量:1
3
作者 HUANG Run-qiu LI Yan-rong +1 位作者 QU Ke WANG Ke 《Journal of Mountain Science》 SCIE CSCD 2013年第4期495-508,共14页
The Cheng-Lan railway links Chengdu, a central city in Southwestern China, and Lanzhou, a central city in Northwestern China. The railway passes through the Longmenshan fault zone (Wenchuan earthquake happened there o... The Cheng-Lan railway links Chengdu, a central city in Southwestern China, and Lanzhou, a central city in Northwestern China. The railway passes through the Longmenshan fault zone (Wenchuan earthquake happened there on May 12, 2008), Minjiang fault zone, and Dongkunlun fault zone, which are all active. It runs over the Yangtze River and the Yellow River, and crosses high mountains and deep valleys. There exists, along the railway's alignment, different kinds of strata of hard granite and soft, weak metamorphic rocks such as carbonaceous slate, schist, and phyllite. It is, therefore, a key issue for such an infrastructure construction to assess the engineering geological conditions and risks, so as to mitigate or avoid possible georisks and to offer optional designs. Geological survey and georisk assessment along the railway corridor are carried out. Special attention is given to active faults, earthquakes and seismic zones. Based on these, discussions about geological aspects for route selection of the railway are conducted and countermeasures for georisk control are proposed accordingly. Main conclusions are achieved as follows: (1) Geohazards such as landslides, rockfalls and debries flows dominate both the route selection of the railway and the engineering structures (e.g., tunnels or bridges) adopted; (2) Tunnel has been proved to be an excellent structure for linear engineering in geologically active area; and (3) In the case where avoiding is impractical, necessary protection measures should be taken to engineering slopes in high earthquake intensity areas, especially the area with earthquake of Ms. 8 or greater. 展开更多
关键词 Railway route selection Geologicallyactive area EARTHQUAKE Active fault
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部