Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China. Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodyn...Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China. Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodynamic assessment, this paper primarily reviews five meaningful progresses on the aerodynamics of the train-bridge system done by Wind Tunnel Laboratory of Central South University in the past several years. Firstly, the flow around the train and the uncertainty origin of the aerodynamic assessment are described from the fluid mechanism point of view. After a brief introduction of the current aerodynamic assessment methods with their strengths and weaknesses, a new-developed TRAIN-INFRASTRUCTURE rig with the maximum launch speed of 35 m/s is introduced. Then, several benchmark studies are presented, including the statistic results of the characterized geometry parameters of the currently utilized bridge-decks, the aerodynamics of the train, and the aerodynamics of the flat box/truss bridge-decks. Upon compared with the foregoing mentioned benchmarks, this paper highlights the aerodynamic interference of the train-bridge system associated with its physical natures. Finally, a porosity-and orientation-adjustable novel wind barrier with its effects on the aerodynamics of the train-bridge system is discussed.展开更多
With the development of artificial intelligence, communication, computer and other related technologies, it becomes feasible to rebuild traditional railway with such advanced technologies in order to establish a new g...With the development of artificial intelligence, communication, computer and other related technologies, it becomes feasible to rebuild traditional railway with such advanced technologies in order to establish a new generation railway transport system. The railway intelligent transportation system is the trend of railway transportation system in China, and it is also the research focus of international railway transport industry. This paper presents the definition, characters, architecture, key technologies and developing pattern of the RITS(railway intelligent transportation system). Then three typical applications are introduced. Finally, the prospect of the RITS is summarized.展开更多
Large-scale array aided beamforming improves the spectral efficiency(SE) as a benefit of high angular resolution.When dual-beam downlink beamforming is applied to the train moving towards cell edge,the inter-beam ambi...Large-scale array aided beamforming improves the spectral efficiency(SE) as a benefit of high angular resolution.When dual-beam downlink beamforming is applied to the train moving towards cell edge,the inter-beam ambiguity(IBA) increases as the directional difference between beams becomes smaller.An adaptive antenna activation based beamforming scheme was proposed to mitigate IBA.In the district near the base station(BS),all antenna elements(AEs) were activated to generate two beams.As the distance from the train to the BS increased,only the minimum number of AEs satisfying the resolution criterion would be activated.At the cell edge,one beam was switched off due to intolerable IBA.The proposed scheme can achieve SE gain to the non-adaptive scheme and show more robustness against the direction-of-arrival(DOA) estimation error.展开更多
The fifth generation (5G) wireless communication is currently a hot research topic and wireless communication systems on high speed railways (HSR) are important applications of 5G technologies. Existing stud- ies ...The fifth generation (5G) wireless communication is currently a hot research topic and wireless communication systems on high speed railways (HSR) are important applications of 5G technologies. Existing stud- ies about 5G wireless systems on high speed railways (HSR) often utilize ideal channel parameters and are usually based on simple scenarios. In this paper, we evaluate the down- link throughput of 5G HSR communication systems on three typical scenarios including urban, cutting and viaduct with three different channel estimators. The channel parameters of each scenario are generated with tapped delay line (TDL) models through ray-tracing sim- ulations, which can be considered as a good match to practical situations. The channel estimators including least square (LS), linear minimum mean square error (LMMSE), and our proposed historical information based ba- sis expansion model (HiBEM). We analyze the performance of the HiBEM estimator in terms of mean square error (MSE) and evaluate the system throughputs with different channel estimates over each scenario. Simulation results are then provided to corroborate our proposed studies. It is shown that our HiBEM estimator outperforms other estimators and that the sys-tem throughput can reach the highest point in the viaduct scenario.展开更多
Wind barriers are commonly adopted to prevent the effects of wind on high-speed railway trains,but their wind-proofing effects are greatly affected by substructures.To investigate the effects of wind barriers on the a...Wind barriers are commonly adopted to prevent the effects of wind on high-speed railway trains,but their wind-proofing effects are greatly affected by substructures.To investigate the effects of wind barriers on the aerodynamic characteristic of road-rail same-story truss bridge-train systems,wind tunnel experiments were carried out using a 1:50 scale model.Taking a wind barrier with a porosity of 30%as an example,the aerodynamic characteristics of the bridge train system under different wind barrier layouts(single-sided and double-sided),positions(inside and outside)and heights(2.5 m,3.0 m,3.5 m and 4.0 m)were tested.The results indicate that the downstream inside wind barrier has almost no effect on the aerodynamic characteristics of the train-bridge system,but the downstream outside wind barrier increases the drag coefficient of the bridge and reduces both the lift coefficient and drag coefficient of the train due to its effect on the trains wind pressure distribution,especially on the trains leeward surface.When the wind barriers are arranged on the outside,their effects on the drag coefficient of the bridge and shielding effect on the train are greater than when they are arranged on the inside.As the height of the wind barrier increases,the drag coefficient of the bridge also gradually increases,and the lift coefficient and drag coefficient of the train gradually decrease,but the degree of variation of the aerodynamic coefficient with the height is slightly different due to the different wind barrier layouts.When 3.0 m high double-sided wind barriers are arranged on the outside of the truss bridge,the drag coefficient of the bridge only increases by 12%,while the drag coefficient of the train decreases by 55%.展开更多
This paper investigates the cross-correlation characteristics of large-scale parameters(LSPs) and small-scale fading(SSF) for high-speed railway(HSR) multilink propagation scenarios, based on realistic measurements co...This paper investigates the cross-correlation characteristics of large-scale parameters(LSPs) and small-scale fading(SSF) for high-speed railway(HSR) multilink propagation scenarios, based on realistic measurements conducted on Beijing to Tianjin HSR line in China. A long-term evolution-based channel sounding system is utilized in the measurements to obtain the channel data. By applying a proposed time-delay based dynamic partition method, multi-link channel impulse responses are extracted from the raw channel data. Then, the statistical results of LSPs, including shadow fading, K-factor, and root-mean-square delay spread are derived and the cross-correlation coefficients of these LPSs are calculated. Moreover, the SSF spatial correlation and cross-correlation of SSF are analyzed. These results can be used to exploit multi-link channel model and to optimize the next-generation HSR communication system.展开更多
Railway accident prevention and protection are a key part of a wider picture of transport safety. The rail sector thus needs to improve its knowledge of trespassing and suicide, including at level crossing, in order t...Railway accident prevention and protection are a key part of a wider picture of transport safety. The rail sector thus needs to improve its knowledge of trespassing and suicide, including at level crossing, in order to work out suitable responses by analyzing measures already taken in various countries, Governments, the rail industry and road organizations have been implementing a variety of countermeasures for many years to improve railway safety. These actions are substantial and have resulted in a continuing decrease in the number and the severity of accidents. This paper presents existing suitable techniques that are used in the preventative measures targeted to reduce railway suicides, trespassing and level crossing user accidents. It describes them in terms of their capability to effectively reduce accidents, their cost-effectiveness and their integration within the railway transport system as a whole.展开更多
In this paper, we propose a new cellular automata model to simulate the railway traffic at station. Based on NaSch model, the proposed station model is composed of the main track and the siding track. Two different sc...In this paper, we propose a new cellular automata model to simulate the railway traffic at station. Based on NaSch model, the proposed station model is composed of the main track and the siding track. Two different schemes for trains passing through station are considered. One is the scheme of "pass by the main track, start and stop by the siding track". The other is the scheme of "two tracks play the same role". We simulate the train movement using the proposed model and analyze the traffic flow at station. The simulation results demonstrate that the proposed cellular automata model can be successfully used for the simulations of railway traffic. Some characteristic behaviors of railway traffic flow can be reproduced. Moreover, the simulation values of the minimum headway are close to the theoretical values. This result demonstrates the dependability and availability of the proposed model.展开更多
Wheel/rail relationship is a fundamental problem of railway system. Wear of wheel profiles has great effect on vehicle performance. Thus, it is important not just for the analysis of wear characteristics but for its p...Wheel/rail relationship is a fundamental problem of railway system. Wear of wheel profiles has great effect on vehicle performance. Thus, it is important not just for the analysis of wear characteristics but for its prediction. Actual wheel profiles of the high-speed trains on service were measured in the high-speed line and the wear characteristics were analyzed which came to the following results. The wear location was centralized from-15 mm to 25 mm. The maximum wear value appeared at the area of 5 mm from tread center far from wheel flange and it was less than 1.5 mm. Then, wheel wear was fitted to get the polynomial functions on different locations and operation mileages. A binary numerical prediction model was raised to predict wheel wear. The prediction model was proved by vehicle system dynamics and wheel/rail contact geometry. The results show that the prediction model can reflect wear characteristics of measured profiles and vehicle performances.展开更多
China’s high-speed railways are always facing the potential damage risk induced by strong earthquakes.And the route design concept of“using bridge instead of embankment”has also greatly increased the probability of...China’s high-speed railways are always facing the potential damage risk induced by strong earthquakes.And the route design concept of“using bridge instead of embankment”has also greatly increased the probability of high speed trains moving on bridges when a strong earthquake happens.In the past decades,a bunch of theoretical and numerical studies have been conducted in the seismic dynamic field of high-speed railway.However,the effective dynamic test system for verifying the given method and theoretical results is still lacking.Therefore,a novel dynamic test system(DTS)consisting of a shaking table array and a train-pass-bridge reduced-scale model is proposed in this paper.Through some crucial technical problems discussion,the effectiveness of similar design scheme and the feasibility of reduced-scale DTS are elaborated,and then the detailed DTS structures are given and displayed as part-by-part.On this basis,the demonstration tests are conducted and compared with the numerical simulation.The results show that the proposed DTS is accurate and effective.Therefore,the DTS can provide a new physical simulation approach to study the high-speed train’s running safety on bridges under earthquakes and can also provide a reference for the construction of related systems.展开更多
This paper introduces the methods and technicalities of applicating information technology in a mining area railway transport system. The pattern Client /Server is adopted in this system. There are two types of client...This paper introduces the methods and technicalities of applicating information technology in a mining area railway transport system. The pattern Client /Server is adopted in this system. There are two types of clients, i.e. PC and terminal. This article focuses on the system demand analysis, the data flow, the system architecture and some technical details.展开更多
Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure...Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure,mechanical characteristics and transmission routes of deck loads.The simplified calculation models were brought out for the stud design of the longitudinal girders and transverse girders in the composite floor system of Nanjing Dashengguan Yangtze River Bridge (NDB).Studs were designed and arranged by taking the middle panel of 336 m main span for example.The results show that under deck loads,the longitudinal girders in the composite floor system of through steel bridges are in tension-bending state,longitudinal shear force on the interface is caused by both longitudinal force of "The first mechanical system" and vertical bending of "The second mechanical system",and studs can be arranged with equal space in terms of the shear force in range of 0.2d (where d is the panel length) on the top ends.Transverse girders in steel longitudinal and transverse girders-concrete slab composite deck are in compound-bending state,and out-of-plane bending has to be taken into account in the stud design.In orthotropic integral steel deck-concrete slab composite deck,out-of-plane bending of transverse girders is very small so that it can be neglected,and studs on the orthotropic integral steel deck can be arranged according to the structural requirements.The above design methods and simplified calculation models have been applied in the stud design of NDB.展开更多
The graph overlay method is used to evaluate the noise impact of route alignment and the results can serve as a reference for the route alignment optimal selection. The geographic information system(GIS), with its pow...The graph overlay method is used to evaluate the noise impact of route alignment and the results can serve as a reference for the route alignment optimal selection. The geographic information system(GIS), with its powerful function of handling attribute data and spatial analysis, is adopted to calculate the noise comprehensive impact area of each alignment. With the graph overlay method, the noise vulnerability and noise impact distribution are both taken into account in the noise impact assessment of route alignment. With GIS, the efficiency of work and the reliability of result are greatly improved. By a combination of them, the noise impact on environment is fully presented in a visual way and the assessment result has vital value in route alignment optimal selection. A detailed case study is illustrated and the efficiency of the method is verified.展开更多
By system analysis and imitating modeling authors show the most effective modern techniques for railway electric systems control. Modem measure technologies PMU-WAMS and smart grid allow to solve real time tasks of ce...By system analysis and imitating modeling authors show the most effective modern techniques for railway electric systems control. Modem measure technologies PMU-WAMS and smart grid allow to solve real time tasks of centralizing control of railway electric systems. Quantity characteristics of control effectiveness are determined. According to computer modeling the situation approach is available for practical tasks of railway electric system control.展开更多
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi...Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.展开更多
During the start-up and shut-down phase of reciprocating compressors, the loads on all components of driven train system are very high. In this paper a method for calculating the forces on coupling, e-motor, crank sha...During the start-up and shut-down phase of reciprocating compressors, the loads on all components of driven train system are very high. In this paper a method for calculating the forces on coupling, e-motor, crank shaft as well other components of the system will be described. The modelling of the electrical induction motor, coupling, crank shaft, damper as well as the compressor resistance torque are extremely important in simulating start-up and shut-down of reciprocating compressor. Furthermore the switching torque of the electrical motor and the instantaneous moment of inertia of the reciprocating compressor crank gear are important as well. The transient start-up and shut-down process under loaded and unloaded conditions is described using a non-linear differential equation for driven train system: E-motor--coupling--flywheel--reciprocating compressor--damper. Shaft torsional moments on the drive train and especially on the coupling, whether elastic or stiff, can then only be calculated using numerical simulation. This paper will describe some of the key elements in modelling, simulating and measurements of drive train start-up and shut-down carried out on already operational piston compressor units.展开更多
This paper investigates the performance of SAPFs (shunt active power filters) which are introduced in order to address the quality issues in electrified railway supply systems. These filters can be installed at eith...This paper investigates the performance of SAPFs (shunt active power filters) which are introduced in order to address the quality issues in electrified railway supply systems. These filters can be installed at either the S/S (substation) end or at the SP (sectioning post) of the railway feeding power system. In this investigation novel control algorithms, based on the synchronously rotating frame of reference, are proposed for the case when the SAPF is installed at the substation end and its performance is assessed. The effectiveness of the proposed control algorithms are illustrated via Matlab/SimPower computer simulations and validated via comparisons with other publications. This investigation demonstrated that when the SAPF is installed at the substation side, it can effectively compensate for the higher harmonic supply current. In addition, the reactive power demand is fully compensated for, leading to close to unity power factor. However, the voltage drop/sag at the locomotive power supply feed point is only partially compensated for.展开更多
With rapid development of the railway traffic, the moving block signaling system (MBS) method has become more and more important for increasing the track capacity by allowing trains to run in a shorter time-headway ...With rapid development of the railway traffic, the moving block signaling system (MBS) method has become more and more important for increasing the track capacity by allowing trains to run in a shorter time-headway while maintaining the required safety margins. In this framework, the tracking target point of the following train is moving forward with its leading train. This paper focuses on the energy saving tracking control of two successive trains in MBS. Nonlinear programming method is used to optimize the energy-saving speed trajectory of the following train. The real-time location of the leading train could be integrated into the optimization process. Due to simplicity, it can be used for online implementation. The feasibility and effectiveness are verified through simulation. The results show that the new method is efficient on energy saving even when disturbances present.展开更多
Good equipment management is essential for the day to day management of an enterprise. Targeted at production opera-tion of the railway transportation department of a mining group and aimed at mine railway equipment m...Good equipment management is essential for the day to day management of an enterprise. Targeted at production opera-tion of the railway transportation department of a mining group and aimed at mine railway equipment management, we have estab-lished a management information system for the equipment in the entire process of the life cycle of equipment. The project deals with basic data about equipment, initial management, maintenance, operation and even disposal, based on a C/S and B/S structure. We adopted an object-oriented approach, dealing with software engineering, information engineering, economic and organizational measures. Thus, effective monitoring and control of the operation of railway equipment and its status in the entire process has been achieved.展开更多
基金Project(2017YFB1201204)supported by National Key R&D Program of ChinaProjects(51925808,U1934209)supported by the National Natural Science Foundation of China。
文摘Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China. Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodynamic assessment, this paper primarily reviews five meaningful progresses on the aerodynamics of the train-bridge system done by Wind Tunnel Laboratory of Central South University in the past several years. Firstly, the flow around the train and the uncertainty origin of the aerodynamic assessment are described from the fluid mechanism point of view. After a brief introduction of the current aerodynamic assessment methods with their strengths and weaknesses, a new-developed TRAIN-INFRASTRUCTURE rig with the maximum launch speed of 35 m/s is introduced. Then, several benchmark studies are presented, including the statistic results of the characterized geometry parameters of the currently utilized bridge-decks, the aerodynamics of the train, and the aerodynamics of the flat box/truss bridge-decks. Upon compared with the foregoing mentioned benchmarks, this paper highlights the aerodynamic interference of the train-bridge system associated with its physical natures. Finally, a porosity-and orientation-adjustable novel wind barrier with its effects on the aerodynamics of the train-bridge system is discussed.
基金funded by the National Natural Science Foundation of China ( No. 61074151) Nation Science and Technology Support Program ( No. T1DB300020 and No. T1DB200010)Ministry of Railways Science and Technology Research Program ( No. 2006X023 and No. 2010X008)
文摘With the development of artificial intelligence, communication, computer and other related technologies, it becomes feasible to rebuild traditional railway with such advanced technologies in order to establish a new generation railway transport system. The railway intelligent transportation system is the trend of railway transportation system in China, and it is also the research focus of international railway transport industry. This paper presents the definition, characters, architecture, key technologies and developing pattern of the RITS(railway intelligent transportation system). Then three typical applications are introduced. Finally, the prospect of the RITS is summarized.
基金supported partially by the 973 Program under the Grant 2012CB316100
文摘Large-scale array aided beamforming improves the spectral efficiency(SE) as a benefit of high angular resolution.When dual-beam downlink beamforming is applied to the train moving towards cell edge,the inter-beam ambiguity(IBA) increases as the directional difference between beams becomes smaller.An adaptive antenna activation based beamforming scheme was proposed to mitigate IBA.In the district near the base station(BS),all antenna elements(AEs) were activated to generate two beams.As the distance from the train to the BS increased,only the minimum number of AEs satisfying the resolution criterion would be activated.At the cell edge,one beam was switched off due to intolerable IBA.The proposed scheme can achieve SE gain to the non-adaptive scheme and show more robustness against the direction-of-arrival(DOA) estimation error.
基金supported by the National Natural Science Foundation of China(Grant Nos.61522109,61671253,61571037and 91738201)the Fundamental Research Funds for the Central Universities(No.2016JBZ006)+1 种基金the Natural Science Foundation of Jiangsu Province(Grant Nos.BK20150040and BK20171446)the Key Project of Natural Science Research of Higher Education Institutions of Jiangsu Province(No.15KJA510003)
文摘The fifth generation (5G) wireless communication is currently a hot research topic and wireless communication systems on high speed railways (HSR) are important applications of 5G technologies. Existing stud- ies about 5G wireless systems on high speed railways (HSR) often utilize ideal channel parameters and are usually based on simple scenarios. In this paper, we evaluate the down- link throughput of 5G HSR communication systems on three typical scenarios including urban, cutting and viaduct with three different channel estimators. The channel parameters of each scenario are generated with tapped delay line (TDL) models through ray-tracing sim- ulations, which can be considered as a good match to practical situations. The channel estimators including least square (LS), linear minimum mean square error (LMMSE), and our proposed historical information based ba- sis expansion model (HiBEM). We analyze the performance of the HiBEM estimator in terms of mean square error (MSE) and evaluate the system throughputs with different channel estimates over each scenario. Simulation results are then provided to corroborate our proposed studies. It is shown that our HiBEM estimator outperforms other estimators and that the sys-tem throughput can reach the highest point in the viaduct scenario.
基金Projects(52078504,51822803,51925808) supported by the National Natural Science Foundation of ChinaProject(2021RC3016) supported by the Science and Technology Innovation Program of Hunan Province,China。
文摘Wind barriers are commonly adopted to prevent the effects of wind on high-speed railway trains,but their wind-proofing effects are greatly affected by substructures.To investigate the effects of wind barriers on the aerodynamic characteristic of road-rail same-story truss bridge-train systems,wind tunnel experiments were carried out using a 1:50 scale model.Taking a wind barrier with a porosity of 30%as an example,the aerodynamic characteristics of the bridge train system under different wind barrier layouts(single-sided and double-sided),positions(inside and outside)and heights(2.5 m,3.0 m,3.5 m and 4.0 m)were tested.The results indicate that the downstream inside wind barrier has almost no effect on the aerodynamic characteristics of the train-bridge system,but the downstream outside wind barrier increases the drag coefficient of the bridge and reduces both the lift coefficient and drag coefficient of the train due to its effect on the trains wind pressure distribution,especially on the trains leeward surface.When the wind barriers are arranged on the outside,their effects on the drag coefficient of the bridge and shielding effect on the train are greater than when they are arranged on the inside.As the height of the wind barrier increases,the drag coefficient of the bridge also gradually increases,and the lift coefficient and drag coefficient of the train gradually decrease,but the degree of variation of the aerodynamic coefficient with the height is slightly different due to the different wind barrier layouts.When 3.0 m high double-sided wind barriers are arranged on the outside of the truss bridge,the drag coefficient of the bridge only increases by 12%,while the drag coefficient of the train decreases by 55%.
基金supported by the Beijing Municipal Natural Science Foundation under Grant 4174102the National Natural Science Foundation of China under Grant 61701017+1 种基金the Open Research Fund through the National Mobile Communications Research Laboratory, Southeast University, under Grant 2018D11the Fundamental Research Funds for the Central Universities under Grant 2018JBM003
文摘This paper investigates the cross-correlation characteristics of large-scale parameters(LSPs) and small-scale fading(SSF) for high-speed railway(HSR) multilink propagation scenarios, based on realistic measurements conducted on Beijing to Tianjin HSR line in China. A long-term evolution-based channel sounding system is utilized in the measurements to obtain the channel data. By applying a proposed time-delay based dynamic partition method, multi-link channel impulse responses are extracted from the raw channel data. Then, the statistical results of LSPs, including shadow fading, K-factor, and root-mean-square delay spread are derived and the cross-correlation coefficients of these LPSs are calculated. Moreover, the SSF spatial correlation and cross-correlation of SSF are analyzed. These results can be used to exploit multi-link channel model and to optimize the next-generation HSR communication system.
文摘Railway accident prevention and protection are a key part of a wider picture of transport safety. The rail sector thus needs to improve its knowledge of trespassing and suicide, including at level crossing, in order to work out suitable responses by analyzing measures already taken in various countries, Governments, the rail industry and road organizations have been implementing a variety of countermeasures for many years to improve railway safety. These actions are substantial and have resulted in a continuing decrease in the number and the severity of accidents. This paper presents existing suitable techniques that are used in the preventative measures targeted to reduce railway suicides, trespassing and level crossing user accidents. It describes them in terms of their capability to effectively reduce accidents, their cost-effectiveness and their integration within the railway transport system as a whole.
基金supported by National Natural Science Foundation of China under Grant Nos. 60634010 and 60776829Key Technology Research of Train Control System,and Urban Rail Transit Automation and Control Beijing Municipal Government Key Laboratory
文摘In this paper, we propose a new cellular automata model to simulate the railway traffic at station. Based on NaSch model, the proposed station model is composed of the main track and the siding track. Two different schemes for trains passing through station are considered. One is the scheme of "pass by the main track, start and stop by the siding track". The other is the scheme of "two tracks play the same role". We simulate the train movement using the proposed model and analyze the traffic flow at station. The simulation results demonstrate that the proposed cellular automata model can be successfully used for the simulations of railway traffic. Some characteristic behaviors of railway traffic flow can be reproduced. Moreover, the simulation values of the minimum headway are close to the theoretical values. This result demonstrates the dependability and availability of the proposed model.
基金Project(U1234208)supported by the Major Program of the National Natural Science Foundation of ChinaProject(2013J008-A)supported by the Research and Development Plan of Major Tasks in Science and Technology China Railways Co.Ltd.,China
文摘Wheel/rail relationship is a fundamental problem of railway system. Wear of wheel profiles has great effect on vehicle performance. Thus, it is important not just for the analysis of wear characteristics but for its prediction. Actual wheel profiles of the high-speed trains on service were measured in the high-speed line and the wear characteristics were analyzed which came to the following results. The wear location was centralized from-15 mm to 25 mm. The maximum wear value appeared at the area of 5 mm from tread center far from wheel flange and it was less than 1.5 mm. Then, wheel wear was fitted to get the polynomial functions on different locations and operation mileages. A binary numerical prediction model was raised to predict wheel wear. The prediction model was proved by vehicle system dynamics and wheel/rail contact geometry. The results show that the prediction model can reflect wear characteristics of measured profiles and vehicle performances.
基金Projects(51878674,52108433,52022113) supported by the National Natural Science Foundation of ChinaProject(2019RS3009) supported by the Hunan Innovative Provincial Construction,China+2 种基金Project(2021JJ40587) supported by the Hunan Provincial Natural Science Foundation of ChinaProject(21B0309) supported by the Research Foundation of Education Bureau of Hunan Province,ChinaProject(HSR202004) supported by the Open Foundation of National Engineering Research Center of High-Speed Railway Construction Technology,China。
文摘China’s high-speed railways are always facing the potential damage risk induced by strong earthquakes.And the route design concept of“using bridge instead of embankment”has also greatly increased the probability of high speed trains moving on bridges when a strong earthquake happens.In the past decades,a bunch of theoretical and numerical studies have been conducted in the seismic dynamic field of high-speed railway.However,the effective dynamic test system for verifying the given method and theoretical results is still lacking.Therefore,a novel dynamic test system(DTS)consisting of a shaking table array and a train-pass-bridge reduced-scale model is proposed in this paper.Through some crucial technical problems discussion,the effectiveness of similar design scheme and the feasibility of reduced-scale DTS are elaborated,and then the detailed DTS structures are given and displayed as part-by-part.On this basis,the demonstration tests are conducted and compared with the numerical simulation.The results show that the proposed DTS is accurate and effective.Therefore,the DTS can provide a new physical simulation approach to study the high-speed train’s running safety on bridges under earthquakes and can also provide a reference for the construction of related systems.
文摘This paper introduces the methods and technicalities of applicating information technology in a mining area railway transport system. The pattern Client /Server is adopted in this system. There are two types of clients, i.e. PC and terminal. This article focuses on the system demand analysis, the data flow, the system architecture and some technical details.
基金Project(2004G016-B) supported by the Science and Technology Development Program of Railways Department,China
文摘Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure,mechanical characteristics and transmission routes of deck loads.The simplified calculation models were brought out for the stud design of the longitudinal girders and transverse girders in the composite floor system of Nanjing Dashengguan Yangtze River Bridge (NDB).Studs were designed and arranged by taking the middle panel of 336 m main span for example.The results show that under deck loads,the longitudinal girders in the composite floor system of through steel bridges are in tension-bending state,longitudinal shear force on the interface is caused by both longitudinal force of "The first mechanical system" and vertical bending of "The second mechanical system",and studs can be arranged with equal space in terms of the shear force in range of 0.2d (where d is the panel length) on the top ends.Transverse girders in steel longitudinal and transverse girders-concrete slab composite deck are in compound-bending state,and out-of-plane bending has to be taken into account in the stud design.In orthotropic integral steel deck-concrete slab composite deck,out-of-plane bending of transverse girders is very small so that it can be neglected,and studs on the orthotropic integral steel deck can be arranged according to the structural requirements.The above design methods and simplified calculation models have been applied in the stud design of NDB.
基金Project (2004036125) supported by Postdoctoral Science Foundation of China project(2002F008 2003F012) supportedby the Science and Technology Research and Development Planning Projects of the Ministry of Railway of China
文摘The graph overlay method is used to evaluate the noise impact of route alignment and the results can serve as a reference for the route alignment optimal selection. The geographic information system(GIS), with its powerful function of handling attribute data and spatial analysis, is adopted to calculate the noise comprehensive impact area of each alignment. With the graph overlay method, the noise vulnerability and noise impact distribution are both taken into account in the noise impact assessment of route alignment. With GIS, the efficiency of work and the reliability of result are greatly improved. By a combination of them, the noise impact on environment is fully presented in a visual way and the assessment result has vital value in route alignment optimal selection. A detailed case study is illustrated and the efficiency of the method is verified.
文摘By system analysis and imitating modeling authors show the most effective modern techniques for railway electric systems control. Modem measure technologies PMU-WAMS and smart grid allow to solve real time tasks of centralizing control of railway electric systems. Quantity characteristics of control effectiveness are determined. According to computer modeling the situation approach is available for practical tasks of railway electric system control.
文摘Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.
文摘During the start-up and shut-down phase of reciprocating compressors, the loads on all components of driven train system are very high. In this paper a method for calculating the forces on coupling, e-motor, crank shaft as well other components of the system will be described. The modelling of the electrical induction motor, coupling, crank shaft, damper as well as the compressor resistance torque are extremely important in simulating start-up and shut-down of reciprocating compressor. Furthermore the switching torque of the electrical motor and the instantaneous moment of inertia of the reciprocating compressor crank gear are important as well. The transient start-up and shut-down process under loaded and unloaded conditions is described using a non-linear differential equation for driven train system: E-motor--coupling--flywheel--reciprocating compressor--damper. Shaft torsional moments on the drive train and especially on the coupling, whether elastic or stiff, can then only be calculated using numerical simulation. This paper will describe some of the key elements in modelling, simulating and measurements of drive train start-up and shut-down carried out on already operational piston compressor units.
文摘This paper investigates the performance of SAPFs (shunt active power filters) which are introduced in order to address the quality issues in electrified railway supply systems. These filters can be installed at either the S/S (substation) end or at the SP (sectioning post) of the railway feeding power system. In this investigation novel control algorithms, based on the synchronously rotating frame of reference, are proposed for the case when the SAPF is installed at the substation end and its performance is assessed. The effectiveness of the proposed control algorithms are illustrated via Matlab/SimPower computer simulations and validated via comparisons with other publications. This investigation demonstrated that when the SAPF is installed at the substation side, it can effectively compensate for the higher harmonic supply current. In addition, the reactive power demand is fully compensated for, leading to close to unity power factor. However, the voltage drop/sag at the locomotive power supply feed point is only partially compensated for.
文摘With rapid development of the railway traffic, the moving block signaling system (MBS) method has become more and more important for increasing the track capacity by allowing trains to run in a shorter time-headway while maintaining the required safety margins. In this framework, the tracking target point of the following train is moving forward with its leading train. This paper focuses on the energy saving tracking control of two successive trains in MBS. Nonlinear programming method is used to optimize the energy-saving speed trajectory of the following train. The real-time location of the leading train could be integrated into the optimization process. Due to simplicity, it can be used for online implementation. The feasibility and effectiveness are verified through simulation. The results show that the new method is efficient on energy saving even when disturbances present.
文摘Good equipment management is essential for the day to day management of an enterprise. Targeted at production opera-tion of the railway transportation department of a mining group and aimed at mine railway equipment management, we have estab-lished a management information system for the equipment in the entire process of the life cycle of equipment. The project deals with basic data about equipment, initial management, maintenance, operation and even disposal, based on a C/S and B/S structure. We adopted an object-oriented approach, dealing with software engineering, information engineering, economic and organizational measures. Thus, effective monitoring and control of the operation of railway equipment and its status in the entire process has been achieved.