By analyzing the average percent of faults detected (APFD) metric and its variant versions, which are widely utilized as metrics to evaluate the fault detection efficiency of the test suite, this paper points out so...By analyzing the average percent of faults detected (APFD) metric and its variant versions, which are widely utilized as metrics to evaluate the fault detection efficiency of the test suite, this paper points out some limitations of the APFD series metrics. These limitations include APFD series metrics having inaccurate physical explanations and being unable to precisely describe the process of fault detection. To avoid the limitations of existing metrics, this paper proposes two improved metrics for evaluating fault detection efficiency of a test suite, including relative-APFD and relative-APFDc. The proposed metrics refer to both the speed of fault detection and the constraint of the testing source. The case study shows that the two proposed metrics can provide much more precise descriptions of the fault detection process and the fault detection efficiency of the test suite.展开更多
Round inductosyn is widely used in inertial navigation test equipment, and its accuracy has significant effect on the general accuracy of the equipment. Four main errors of round inductosyn,i.e. the first-order long-p...Round inductosyn is widely used in inertial navigation test equipment, and its accuracy has significant effect on the general accuracy of the equipment. Four main errors of round inductosyn,i.e. the first-order long-period (360°) harmonic error, the second-order long-period harmonic error, the first-order short-period harmonic error and the second-order short-period harmonic error, are described, and the orthogonality of these four kinds of errors is studied. An error separating technology is proposed to separate these four kinds of errors, and in the process of separating the short-period harmonic errors, the arrangement in the order of decimal part of the angle pitch number can be omitted. The effectiveness of the technology proposed is proved through measuring and adjusting the angular errors.展开更多
The Qinling tunnel with length of 18. 488km is located on the railway line from Xi’ an (Shanxi Province) to Ankan (Sichuan Province) in the middle of Qinling moun- tain. It is the longest double track railway tunnel ...The Qinling tunnel with length of 18. 488km is located on the railway line from Xi’ an (Shanxi Province) to Ankan (Sichuan Province) in the middle of Qinling moun- tain. It is the longest double track railway tunnel in China and takes the third place in the world. According to the design, the break-through error in vertical direction caused by the al- timetric control surveying is limited to 18mm for the case of one piercing face. Because the leveling route reaches over 120km in length and must go over two mountains in 2 800m height, the first-order precise leveling and precise gravity measurement should be carried out in the construction stage. In this paper the field leveling approach, the application of new technology,some experience as well as the office calculation with final results analysis are in- troduced. By meticulous planning, organization and observation, the final accuracy of vertical difference between two tunnel end points is only 8mm, and it provides reliable surveying guarantee for this great tunnel engineering. Finally it is pointed out that this vertical differ- ence distinguishes obviously from the primary measurement result as high as 114mm. It means that the primary result is not accurate enough.展开更多
Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse ne...Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse network, we propose a method for calculating the influence value caused by control surveying errors. Through a lot of simulative calculations and combination with piercing practice of super tunnels in Wan Jiazai Project, Shanxi province, we present an allowance table of lateral breakthrough error for super long tunnels from 20 km to 50 km.展开更多
基金The National Natural Science Foundation of China(No.61300054)the Natural Science Foundation of Jiangsu Province(No.BK2011190,BK20130879)+1 种基金the Natural Science Foundation of Higher Education Institutions of Jiangsu Province(No.13KJB520018)the Science Foundation of Nanjing University of Posts&Telecommunications(No.NY212023)
文摘By analyzing the average percent of faults detected (APFD) metric and its variant versions, which are widely utilized as metrics to evaluate the fault detection efficiency of the test suite, this paper points out some limitations of the APFD series metrics. These limitations include APFD series metrics having inaccurate physical explanations and being unable to precisely describe the process of fault detection. To avoid the limitations of existing metrics, this paper proposes two improved metrics for evaluating fault detection efficiency of a test suite, including relative-APFD and relative-APFDc. The proposed metrics refer to both the speed of fault detection and the constraint of the testing source. The case study shows that the two proposed metrics can provide much more precise descriptions of the fault detection process and the fault detection efficiency of the test suite.
文摘Round inductosyn is widely used in inertial navigation test equipment, and its accuracy has significant effect on the general accuracy of the equipment. Four main errors of round inductosyn,i.e. the first-order long-period (360°) harmonic error, the second-order long-period harmonic error, the first-order short-period harmonic error and the second-order short-period harmonic error, are described, and the orthogonality of these four kinds of errors is studied. An error separating technology is proposed to separate these four kinds of errors, and in the process of separating the short-period harmonic errors, the arrangement in the order of decimal part of the angle pitch number can be omitted. The effectiveness of the technology proposed is proved through measuring and adjusting the angular errors.
文摘The Qinling tunnel with length of 18. 488km is located on the railway line from Xi’ an (Shanxi Province) to Ankan (Sichuan Province) in the middle of Qinling moun- tain. It is the longest double track railway tunnel in China and takes the third place in the world. According to the design, the break-through error in vertical direction caused by the al- timetric control surveying is limited to 18mm for the case of one piercing face. Because the leveling route reaches over 120km in length and must go over two mountains in 2 800m height, the first-order precise leveling and precise gravity measurement should be carried out in the construction stage. In this paper the field leveling approach, the application of new technology,some experience as well as the office calculation with final results analysis are in- troduced. By meticulous planning, organization and observation, the final accuracy of vertical difference between two tunnel end points is only 8mm, and it provides reliable surveying guarantee for this great tunnel engineering. Finally it is pointed out that this vertical differ- ence distinguishes obviously from the primary measurement result as high as 114mm. It means that the primary result is not accurate enough.
文摘Up to now there is no specification about the allowance of lateral breakthrough error for super long tunnel from 20 km to 50 km. On the basis of the design of GPS networks located outside and inside tunnel traverse network, we propose a method for calculating the influence value caused by control surveying errors. Through a lot of simulative calculations and combination with piercing practice of super tunnels in Wan Jiazai Project, Shanxi province, we present an allowance table of lateral breakthrough error for super long tunnels from 20 km to 50 km.