Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c...Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.展开更多
Aiming at prestressed anchor cable frame in the presence of reinforcement landslide problem, through the selection of test points, the paper study and tested soil pressure, frame internal force and prestress losses un...Aiming at prestressed anchor cable frame in the presence of reinforcement landslide problem, through the selection of test points, the paper study and tested soil pressure, frame internal force and prestress losses under prestressed anchor cable frame beam, reveal the law of internal force distribution, and provides a theory basis for the rational design of prestressed anchor cable in landslide.展开更多
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)
文摘Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.
文摘Aiming at prestressed anchor cable frame in the presence of reinforcement landslide problem, through the selection of test points, the paper study and tested soil pressure, frame internal force and prestress losses under prestressed anchor cable frame beam, reveal the law of internal force distribution, and provides a theory basis for the rational design of prestressed anchor cable in landslide.