In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design and manufactu...In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design and manufacture a new roof bolting machine with six independent drilling apparatus on board capable of drilling and bolting the roof and ribs with material handling. The objective was to produce a machine capable of drilling and installing six bolts simultaneously with a limited number of operators. The goal of the mine is to decrease the time to bolt a cut to improve the safety level of the current roof bolting method, improve efficiency and to improve the bottom line cost of entry development. The customer wanted four drills at the front of the machine dedicated to installing roof bolts and then another two drills behind them dedicated to rib bolts. This dictated the requirement of latched controls, which would allow the operator to start drilling one hole and then latch the controls to be able to move on to the next.The result of the design is a machine with a single platform and six independent masts with drillheads:four masts strictly for drilling and installing roof bolts on the front of the platform and two masts on the back of the platform for rib bolts. The controls at each operator's station include a latch control for drilling. The six-head roof bolter allows fewer operators to drill and install roof and rib bolts, which in turn lowers the miners' roof exposure per cut. This design reduces the operator's exposure from the inherent pinch points and rotary hazards once he has engaged the latch drilling. Therefore, the machine will help to decrease the time to bolt a cut, improving productivity while enhancing the ability to operate the machine safely.展开更多
Dust generated from bolt hole drilling in roof bolting operation could have high quartz content. As a dust control measure, vacuum drilling is employed on most of the roof bolters in US underground mines. However, fin...Dust generated from bolt hole drilling in roof bolting operation could have high quartz content. As a dust control measure, vacuum drilling is employed on most of the roof bolters in US underground mines. However, fine rock partic- ulates from drilling could escape from the dust collection system and become airborne under some circumstances causing the roof bolter operators expose to quartz-rich respirable dust. A previous research shows that drilling can be controlled through properly selected penetration and rotational rates to reduce the specific energy of drilling. Less specific energy means less energy is wasted on generating noise, heat and over-breakage of rock. It implies that proper control of drilling has a great potential to generate significantly less fine rock dust during drilling. The drilling experiments have been conducted to study the effect of controlling drilling on reducing respirable dust. The preliminary results show that the size distributions of respirable dust were different when controlling drilling in different bite depths. This paper presents the findings from laboratory experimental studies.展开更多
In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological con...In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining.展开更多
Deep beam anchorage structures based on spatial distribution analysis of the cable prestressed field have been proposed for roadway roof support, Stability and other factors that influence deep beam structures are stu...Deep beam anchorage structures based on spatial distribution analysis of the cable prestressed field have been proposed for roadway roof support, Stability and other factors that influence deep beam structures are studied in this paper using mechanical calculations, numerical analysis and field measurements, A mechanical model of deep beam structure subjected to multiple loading is established, including analysis of roof support in the return airway of S1203 working face in the Yuwu coal mine, China, The expression of maximum shear stress in the deep beam structure is deduced according to the stress superposition criterion, It is found that the primary factors affecting deep beam structure stability are deep beam thickness, cable pre-tension and cable spacing, The variation of maximum shear stress distribution and prestressed field diffusion effects according to various factors are analyzed using Matlah and FLAC3DTM software, and practical support parameters of the S1203 return airway roof are determined, According to the observations of rock pressure, there is no evidence of roof separation, and the maximum values of roof subsidence and convergence of wall rock are 72 and 48 mm, respectively, The results show that the proposed roof support design with a deep beam structure is feasible and achieves effective control of the roadway roof,展开更多
文摘In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design and manufacture a new roof bolting machine with six independent drilling apparatus on board capable of drilling and bolting the roof and ribs with material handling. The objective was to produce a machine capable of drilling and installing six bolts simultaneously with a limited number of operators. The goal of the mine is to decrease the time to bolt a cut to improve the safety level of the current roof bolting method, improve efficiency and to improve the bottom line cost of entry development. The customer wanted four drills at the front of the machine dedicated to installing roof bolts and then another two drills behind them dedicated to rib bolts. This dictated the requirement of latched controls, which would allow the operator to start drilling one hole and then latch the controls to be able to move on to the next.The result of the design is a machine with a single platform and six independent masts with drillheads:four masts strictly for drilling and installing roof bolts on the front of the platform and two masts on the back of the platform for rib bolts. The controls at each operator's station include a latch control for drilling. The six-head roof bolter allows fewer operators to drill and install roof and rib bolts, which in turn lowers the miners' roof exposure per cut. This design reduces the operator's exposure from the inherent pinch points and rotary hazards once he has engaged the latch drilling. Therefore, the machine will help to decrease the time to bolt a cut, improving productivity while enhancing the ability to operate the machine safely.
文摘Dust generated from bolt hole drilling in roof bolting operation could have high quartz content. As a dust control measure, vacuum drilling is employed on most of the roof bolters in US underground mines. However, fine rock partic- ulates from drilling could escape from the dust collection system and become airborne under some circumstances causing the roof bolter operators expose to quartz-rich respirable dust. A previous research shows that drilling can be controlled through properly selected penetration and rotational rates to reduce the specific energy of drilling. Less specific energy means less energy is wasted on generating noise, heat and over-breakage of rock. It implies that proper control of drilling has a great potential to generate significantly less fine rock dust during drilling. The drilling experiments have been conducted to study the effect of controlling drilling on reducing respirable dust. The preliminary results show that the size distributions of respirable dust were different when controlling drilling in different bite depths. This paper presents the findings from laboratory experimental studies.
文摘In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining.
基金provided by the National Natural Science Foundation of China (Nos. 51504259 and 51234005)the Fundamental Research Funds for the Central Universities (No. 2010QZ06)
文摘Deep beam anchorage structures based on spatial distribution analysis of the cable prestressed field have been proposed for roadway roof support, Stability and other factors that influence deep beam structures are studied in this paper using mechanical calculations, numerical analysis and field measurements, A mechanical model of deep beam structure subjected to multiple loading is established, including analysis of roof support in the return airway of S1203 working face in the Yuwu coal mine, China, The expression of maximum shear stress in the deep beam structure is deduced according to the stress superposition criterion, It is found that the primary factors affecting deep beam structure stability are deep beam thickness, cable pre-tension and cable spacing, The variation of maximum shear stress distribution and prestressed field diffusion effects according to various factors are analyzed using Matlah and FLAC3DTM software, and practical support parameters of the S1203 return airway roof are determined, According to the observations of rock pressure, there is no evidence of roof separation, and the maximum values of roof subsidence and convergence of wall rock are 72 and 48 mm, respectively, The results show that the proposed roof support design with a deep beam structure is feasible and achieves effective control of the roadway roof,