When a relatively new building is not being fully utilized, there must have existed, at one time, a change in its initial conditions. The aim of this research is to study the changes in the initial conditions which ca...When a relatively new building is not being fully utilized, there must have existed, at one time, a change in its initial conditions. The aim of this research is to study the changes in the initial conditions which cause buildings to be underutilized and analyze whether the demolition was justified. Causes can be found in problems due to the building's management, as the owners make the main decisions concerning the buildings. Additionally problems are due to the location where the building is constructed because site conditions changes a lot in one generation. The use of the building can also be a cause of abandonment as the original use can end before the lifespan of the building. Architectural style can be dated as fashions and styles change rapidly. Finally, causes can be in the physical condition of the buildings: structure, construction, installations and adherence to current regulations. In this article, the authors provide guidelines demonstrating how buildings of a past generation which were initially considered obsolete, can be properly reused.展开更多
Quality of experience(Qo E), which is very critical for the experience of users in wireless networks, has been extensively studied. However, due to different human perceptions, quantifying the effective capacity of wi...Quality of experience(Qo E), which is very critical for the experience of users in wireless networks, has been extensively studied. However, due to different human perceptions, quantifying the effective capacity of wireless network subject to diverse Qo E is very difficult, which leads to many new challenges regarding Qo E guarantees in wireless networks. In this paper, we formulate the Qo E guarantees model for cellular wireless networks. Based on the model, we convert the effective capacity maximization problem into the equivalent convex optimization problem. Then, we develop the optimal Qo E-driven power allocation scheme, which can maximize the effective capacity. The obtained simulation results verified our proposed power allocation scheme, showing that the effective capacity can be significantly increased compared with that of traditional Qo E guarantees based schemes.展开更多
With the continuous development of the construction industry, the scale and volume of the construction project is expanding. And the project management of the construction project still has the big risk problem which ...With the continuous development of the construction industry, the scale and volume of the construction project is expanding. And the project management of the construction project still has the big risk problem which influenced by many factors. These risks will not only bring unnecessary interference to the construction of the project, but also may jeopardize the safety of people's life and property. It is the focus of this article to do a good job in risk aversion in the management of construction projects.展开更多
文摘When a relatively new building is not being fully utilized, there must have existed, at one time, a change in its initial conditions. The aim of this research is to study the changes in the initial conditions which cause buildings to be underutilized and analyze whether the demolition was justified. Causes can be found in problems due to the building's management, as the owners make the main decisions concerning the buildings. Additionally problems are due to the location where the building is constructed because site conditions changes a lot in one generation. The use of the building can also be a cause of abandonment as the original use can end before the lifespan of the building. Architectural style can be dated as fashions and styles change rapidly. Finally, causes can be in the physical condition of the buildings: structure, construction, installations and adherence to current regulations. In this article, the authors provide guidelines demonstrating how buildings of a past generation which were initially considered obsolete, can be properly reused.
基金supported in part by the National Natural Science Foundation of China(Nos.61771368 and 61671347)Young Elite Scientists Sponsorship Program by CAST(2016QNRC001)
文摘Quality of experience(Qo E), which is very critical for the experience of users in wireless networks, has been extensively studied. However, due to different human perceptions, quantifying the effective capacity of wireless network subject to diverse Qo E is very difficult, which leads to many new challenges regarding Qo E guarantees in wireless networks. In this paper, we formulate the Qo E guarantees model for cellular wireless networks. Based on the model, we convert the effective capacity maximization problem into the equivalent convex optimization problem. Then, we develop the optimal Qo E-driven power allocation scheme, which can maximize the effective capacity. The obtained simulation results verified our proposed power allocation scheme, showing that the effective capacity can be significantly increased compared with that of traditional Qo E guarantees based schemes.
文摘With the continuous development of the construction industry, the scale and volume of the construction project is expanding. And the project management of the construction project still has the big risk problem which influenced by many factors. These risks will not only bring unnecessary interference to the construction of the project, but also may jeopardize the safety of people's life and property. It is the focus of this article to do a good job in risk aversion in the management of construction projects.