Analyzed the factors which affected the coal and gas outburst,then established the corresponding indicator system.Built a dynamic set-pair analysis prediction model which combined of Markov model and set-pair analysis...Analyzed the factors which affected the coal and gas outburst,then established the corresponding indicator system.Built a dynamic set-pair analysis prediction model which combined of Markov model and set-pair analysis model,and then it applied to coal and gas outburst prediction.Finally,compared the prediction results with the actual results As provided a reference to the coalmine in safety decision-making.The research results indicate that there are four districts in high dangerous level,two districts in middle level and one district in low level,which consistent with the actual situation;the dynamic set-pair analysis model has a good effect in predicting coal and gas outburst.Especially in the continuous time intervals,according to the data of mined exploration and the connec- tion degree analysis,we can deduce the dangerous levels of unexplored districts from the historical data.In different districts,the relevant indicators can be adjusted accordingly,so as to enhance the accuracy of the prediction.展开更多
Road tunnel excavation often traverses coal strata, which is at risk of firedamp explosion that usually results in disaster. Airtight concrete grouting is popularly used in this kind of tunnel project. Based on the es...Road tunnel excavation often traverses coal strata, which is at risk of firedamp explosion that usually results in disaster. Airtight concrete grouting is popularly used in this kind of tunnel project. Based on the essential theory of mechanics of fluids in porous media, the principle of improving concrete airtight property and its influential factors are investigated. The proportioning tests and monitoring method for airtight concrete are introduced, which is illustrated by a case study applied to the project of the Huayinshan Tunnel. It is proved by engineering practices that the achievement of this research work is beneficial to tunneling project across coal strata.展开更多
文摘Analyzed the factors which affected the coal and gas outburst,then established the corresponding indicator system.Built a dynamic set-pair analysis prediction model which combined of Markov model and set-pair analysis model,and then it applied to coal and gas outburst prediction.Finally,compared the prediction results with the actual results As provided a reference to the coalmine in safety decision-making.The research results indicate that there are four districts in high dangerous level,two districts in middle level and one district in low level,which consistent with the actual situation;the dynamic set-pair analysis model has a good effect in predicting coal and gas outburst.Especially in the continuous time intervals,according to the data of mined exploration and the connec- tion degree analysis,we can deduce the dangerous levels of unexplored districts from the historical data.In different districts,the relevant indicators can be adjusted accordingly,so as to enhance the accuracy of the prediction.
基金Funded by the Doctoral Foundation of the Ministry of Education of China (2000061115)
文摘Road tunnel excavation often traverses coal strata, which is at risk of firedamp explosion that usually results in disaster. Airtight concrete grouting is popularly used in this kind of tunnel project. Based on the essential theory of mechanics of fluids in porous media, the principle of improving concrete airtight property and its influential factors are investigated. The proportioning tests and monitoring method for airtight concrete are introduced, which is illustrated by a case study applied to the project of the Huayinshan Tunnel. It is proved by engineering practices that the achievement of this research work is beneficial to tunneling project across coal strata.