The Qinghai-Tibet Railway(QTR) passes through 281 km of sandy land, 11.07 km of which causes serious sand damage to the railway and thus, the control of blown sand is important for the safe operation of the railway. C...The Qinghai-Tibet Railway(QTR) passes through 281 km of sandy land, 11.07 km of which causes serious sand damage to the railway and thus, the control of blown sand is important for the safe operation of the railway. Construction of the railway and sand prevention system greatly changed the blown sand transport of the primary surface. Effective and feasible sand-control measures include stone checkerboard barriers(SCBs), sand fences(SFs), and gravel coverings. This study simulated the embankments, SCBs and SFs of the QTR in a wind tunnel, and analyzed their respective wind profile, sand deposition, and sand-blocking rate(SBR) in conjunction with field data, aiming at studying the influence of Golmud-Lhasa section of the QTR and sand prevention system on blown sand transport. The results of wind tunnel experiments showed that wind speed increased by 67.7%–77.3% at the upwind shoulder of the embankment and decreased by 50.0%–83.3% at upwind foot of embankment. Wind speed decreased by 50.0%–100.0% after passing through the first SF, and 72.2%–100.0% after the first row of stones within the first SCB grid. In the experiment of sand deposition, the higher the wind speed, the lower the SBR of SCB and SF. From field investigation, the amount of sand blocked by the four SFs decreased exponentially and its SBR was about 50.0%. By contrast, SCB could only block lower amounts of sand, but had a higher SBR(96.7%) than SF. Although, results show that SFs and SCBs along the Golmud-Lhasa section of the QTR provide an obvious sand blocking effect, they lead to the deposition of a large amount of sand, which forms artificial dunes and becomes a new source of sand damage.展开更多
For a safe extracting of the mine resource of the razor thin capping rock, a study of waterproof, sand prevention, roof fall prevention must be made. As a result, it’s necessary to master the engineering feature of w...For a safe extracting of the mine resource of the razor thin capping rock, a study of waterproof, sand prevention, roof fall prevention must be made. As a result, it’s necessary to master the engineering feature of weathering zone of bedrock. According to the lithology appraisal and X diffract analyses, the mineral feature of weathering zone of bedrock in 810 producing area has been studied in this article. By testing the physical mechanics index of weathering zone, we have found out some features of physical mechanic quality. Utilizing the determined result of viscosity index and slaking test, we reach a conclusion of the water stability of weathering zone, that is the weathering zone rock belongs to the type that is easily slaked when encountered water and the water stability is weak.展开更多
基金Under the auspices of National Natural Science Foundation of China(No.40930741)National Basic Research Program of China(No.2012CB026105)
文摘The Qinghai-Tibet Railway(QTR) passes through 281 km of sandy land, 11.07 km of which causes serious sand damage to the railway and thus, the control of blown sand is important for the safe operation of the railway. Construction of the railway and sand prevention system greatly changed the blown sand transport of the primary surface. Effective and feasible sand-control measures include stone checkerboard barriers(SCBs), sand fences(SFs), and gravel coverings. This study simulated the embankments, SCBs and SFs of the QTR in a wind tunnel, and analyzed their respective wind profile, sand deposition, and sand-blocking rate(SBR) in conjunction with field data, aiming at studying the influence of Golmud-Lhasa section of the QTR and sand prevention system on blown sand transport. The results of wind tunnel experiments showed that wind speed increased by 67.7%–77.3% at the upwind shoulder of the embankment and decreased by 50.0%–83.3% at upwind foot of embankment. Wind speed decreased by 50.0%–100.0% after passing through the first SF, and 72.2%–100.0% after the first row of stones within the first SCB grid. In the experiment of sand deposition, the higher the wind speed, the lower the SBR of SCB and SF. From field investigation, the amount of sand blocked by the four SFs decreased exponentially and its SBR was about 50.0%. By contrast, SCB could only block lower amounts of sand, but had a higher SBR(96.7%) than SF. Although, results show that SFs and SCBs along the Golmud-Lhasa section of the QTR provide an obvious sand blocking effect, they lead to the deposition of a large amount of sand, which forms artificial dunes and becomes a new source of sand damage.
文摘For a safe extracting of the mine resource of the razor thin capping rock, a study of waterproof, sand prevention, roof fall prevention must be made. As a result, it’s necessary to master the engineering feature of weathering zone of bedrock. According to the lithology appraisal and X diffract analyses, the mineral feature of weathering zone of bedrock in 810 producing area has been studied in this article. By testing the physical mechanics index of weathering zone, we have found out some features of physical mechanic quality. Utilizing the determined result of viscosity index and slaking test, we reach a conclusion of the water stability of weathering zone, that is the weathering zone rock belongs to the type that is easily slaked when encountered water and the water stability is weak.