隧洞掘进施工循环作业时间分析
1
作者 薛龙 《云南水力发电》 2023年第3期206-210,共5页
为分析探讨隧洞(隧道)掘进施工合理循环作业时间并优化工期目的,通过对施工过程循环作业基本工作容量与因素的分析,重点研究提出掘进面积、循环进尺、钻孔特性参数,以及装药、危石撬除、喷锚支护与出碴等要素时间的分析方法,并通过工程... 为分析探讨隧洞(隧道)掘进施工合理循环作业时间并优化工期目的,通过对施工过程循环作业基本工作容量与因素的分析,重点研究提出掘进面积、循环进尺、钻孔特性参数,以及装药、危石撬除、喷锚支护与出碴等要素时间的分析方法,并通过工程案例予以验证应用。隧洞(隧道)掘进施工循环作业时间分析探讨成果具普遍性及实用性,可广泛应用于各类隧洞(隧道)工程施工组织设计及实际开挖掘进施工。 展开更多
关键词 隧洞(隧道) 掘进 循环作业 时间 探讨
下载PDF
3D Finite Element Analysis of TBM Water Diversion Tunnel Segment Coupled with Seepage Field 被引量:4
2
作者 钟登华 胡能明 +2 位作者 程正飞 吕鹏 佟大威 《Transactions of Tianjin University》 EI CAS 2016年第1期35-42,共8页
In most studies of tunnel boring machine(TBM)tunnelling, the groundwater pressure was not considered, or was simplified and exerted on the boundary of lining structure. Meanwhile, the leakage, which mainly occurs in t... In most studies of tunnel boring machine(TBM)tunnelling, the groundwater pressure was not considered, or was simplified and exerted on the boundary of lining structure. Meanwhile, the leakage, which mainly occurs in the segment joints, was often ignored in the relevant studies of TBM tunnelling. Additionally, the geological models in these studies were simplified to different extents, and mostly were simplified as homogenous bodies. Considering the deficiencies above, a 3D refined model of the surrounding rock of a tunnel is firstly established using NURBS-TIN-BRe P hybrid data structure in this paper. Then the seepage field of the surrounding rock considering the leakage in the segment joints is simulated. Finally, the stability of TBM water diversion tunnel is studied coupled with the seepage simulation, to analyze the stress-strain conditions, the axial force and the bending moment of tunnel segment considering the leakage in the segment joints. The results illustrate that the maximum radial displacement, the minimum principal stress, the maximum principal stress and the axial force of segment lining considering the seepage effect are all larger than those disregarding the seepage effect. 展开更多
关键词 segment lining seepage-stress coupling 3D geological model TBM water diversion tunnel
下载PDF
3D Finite Element Simulation of Tunnel Boring Machine Construction Processes in Deep Water Conveyance Tunnel 被引量:4
3
作者 钟登华 佟大威 《Transactions of Tianjin University》 EI CAS 2009年第2期101-107,共7页
Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excav... Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability. 展开更多
关键词 water conveyance tunnel tunnel boring machine CONSTRUCTION 3D finite element method numerical analysis SIMULATION