Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important...Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important.Transient electromagnetic method( TEM) uses a non-grounded loop or an electrode to send a primary electromagnetic pulse into the ground,and observes spatial and temporal distribution of secondary electromagnetic field,which is widely applied in mineral resource exploration,engineering geology,etc.The application of TEM in the tunnel construction of Kaiyuan Temple is researched in this study.The smoke loop inversion is adopted for inverting the transient electromagnetic data.The drilling data and high density resistivity method data are combined for comparison.The obtained inversion result greatly coincides with the actual conditions.Therefore,the geophysical prospecting basis can be provided for the division of stratum,delineation of geological structure,and design and construction of tunnel pavement.By virtue of TEM,drilling data and high density resistivity method,the tunnel construction of Kaiyuan Temple has obtained satisfactory results.展开更多
This paper presents a numerical back-analysis of the response of a shield tunnel during construction. An important issue in the construction of shallow tunnels, especially in soft ground conditions, is the surface set...This paper presents a numerical back-analysis of the response of a shield tunnel during construction. An important issue in the construction of shallow tunnels, especially in soft ground conditions, is the surface settlement caused by shield tunneling. The tunnel test system with 10 m length, 7 m width and 6.7 m height, which was completed in China in 2009, is a research shield tunnel system. Using shield tunneling technique known as earth pressure balance (EPB) and slurry shield method, it could be excavated in a region consisting of original soft soils, such as silty clay, and different types of underlain soft soils. Based on the test results, the real-life tunnel response can be analyzed by back-analysis technique. The back-analysis technique is adapted to the three-dimensional finite element method (FEM). Parameter analyses are calibrated to study the behavior of the multi-scale diameter tunnel under various conditions. The suggested multi-scale model results show a well agreement between the prediction and the measurement.展开更多
文摘Along with the economic development,large tunnels need to be constructed in many high mountains or complex structure regions,and the design and construction of detailed tunnel exploration become particularly important.Transient electromagnetic method( TEM) uses a non-grounded loop or an electrode to send a primary electromagnetic pulse into the ground,and observes spatial and temporal distribution of secondary electromagnetic field,which is widely applied in mineral resource exploration,engineering geology,etc.The application of TEM in the tunnel construction of Kaiyuan Temple is researched in this study.The smoke loop inversion is adopted for inverting the transient electromagnetic data.The drilling data and high density resistivity method data are combined for comparison.The obtained inversion result greatly coincides with the actual conditions.Therefore,the geophysical prospecting basis can be provided for the division of stratum,delineation of geological structure,and design and construction of tunnel pavement.By virtue of TEM,drilling data and high density resistivity method,the tunnel construction of Kaiyuan Temple has obtained satisfactory results.
基金Foundation item: the Project of Shanghai Committee of Science and Technology (No. 12DZ2281300), the Program for Changjiang Scholars and Innovative Research Team in University of China (No. IRT1029), and the Science and Technology Key Project of Ministry of Transportation (No. 2009-353333340)
文摘This paper presents a numerical back-analysis of the response of a shield tunnel during construction. An important issue in the construction of shallow tunnels, especially in soft ground conditions, is the surface settlement caused by shield tunneling. The tunnel test system with 10 m length, 7 m width and 6.7 m height, which was completed in China in 2009, is a research shield tunnel system. Using shield tunneling technique known as earth pressure balance (EPB) and slurry shield method, it could be excavated in a region consisting of original soft soils, such as silty clay, and different types of underlain soft soils. Based on the test results, the real-life tunnel response can be analyzed by back-analysis technique. The back-analysis technique is adapted to the three-dimensional finite element method (FEM). Parameter analyses are calibrated to study the behavior of the multi-scale diameter tunnel under various conditions. The suggested multi-scale model results show a well agreement between the prediction and the measurement.