期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
焦晋高速公路孤山隧道施工资料整理与验收
1
作者 王峰 贾巧云 李平 《交通标准化》 2005年第11期159-161,共3页
焦晋高速公路第一合同段项目经理部在项目施工中,当每一分项工程完工后,便可做到质量评定资料齐全完整,从而确保了整个工程施工的连续性及竣工资料的按时完成,对工程竣工验收起到了积极的促进作用。
关键词 隧道资料 收集 整理 验收
下载PDF
Attenuation and Distortion of Compression Waves Propagating in Very Long Tube 被引量:2
2
作者 Shinya NAKAMURA Daisuke SASA Toshiyuki AOKI 《Journal of Thermal Science》 SCIE EI CAS CSCD 2011年第1期53-57,共5页
A lot of phenomena related to propagating various waves are seen when the high-speed train goes through the tunnel,the gas pipeline is broken due to an accident or the air brake of the wagon operates.For instance,a co... A lot of phenomena related to propagating various waves are seen when the high-speed train goes through the tunnel,the gas pipeline is broken due to an accident or the air brake of the wagon operates.For instance,a compression wave generated ahead of a high-speed train entering a tunnel propagates to the tunnel exit and spouts as a micro pressure wave,which causes an exploding sound.In order to estimate the magnitude correctly,the mechanism of the attenuation and distortion of a compression wave propagating along a very long tunnel must be understood and the experimental information on these phenomena is required.An experimental investigation is carried out to clarify the attenuation and distortion of the propagating compression wave in a very long tube.Experimental results show that the strength of a compression wave decreases with distance.The attenuation and distortion of compression waves are affected by the initial waveform of the compression wave and by the unsteady boundary layer induced by the propagating wave.The shape of a compression wave becomes different with the propagating distance;that is,a shock wave appears just head of a wavefront and an overshoot on pressure distribution is observed behind a shock wave due to the transition of the unsteady boundary layer. 展开更多
关键词 Propagating Compression Wave Very Long Tube Micro-pressure Wave High-Speed Train
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部