In order to let the supplier make more reasonable supply decisions,an integrated continuous replenishment policy for the vendor-managed inventory system is presented,which considers the quantity-based shipment consoli...In order to let the supplier make more reasonable supply decisions,an integrated continuous replenishment policy for the vendor-managed inventory system is presented,which considers the quantity-based shipment consolidation and stock replenishment with lead time.Then the system cost is analyzed and a mathematical model is built.Since the model is rather complex,the bounds of the optimal policy are first attained,then the problem is solved by a heuristic algorithm.Through experiments the relationship between the order lead time and the corresponding integrated policy is discussed,and the influence on the system cost is also analyzed.The results reveal that the lead time's influence on the system is more serious with the increase of the order lead time,the integrated policy with the order lead time is more reasonable and the optimal policy can minimize the total system cost.Finally,the parameter sensitivity of the model is analyzed.展开更多
USA nuclear waste management program has stalled due to its continued insistence upon using Yucca Mountain for its disposal of DOE (Department of Energy) and commercial power plants NSF (nuclear spent fuel). Incre...USA nuclear waste management program has stalled due to its continued insistence upon using Yucca Mountain for its disposal of DOE (Department of Energy) and commercial power plants NSF (nuclear spent fuel). Increased flexibility and significant changes in DOE program are proposed. They include a private waste company to manage it; the construction and operation of ICS (interim centralized storage) facilities for NSF; the search for an AGR (alternate geological repository); the use of a different methodology involving key local and state participants; a new "as safe as practical" strategy with defined benefits to the involved locations and states. Assured removal of NSF from ICS and providing limited Price Anderson indemnity for the program will enhance its acceptance. Minimum politics, regular information meetings, compromises, good cost projections and meeting schedules will be necessary to increase the chances of the proposed nuclear waste management program.展开更多
基金The National Key Technology R&D Program of China during the 11 th Five-Year Plan Period(No.2006BAH02A06)
文摘In order to let the supplier make more reasonable supply decisions,an integrated continuous replenishment policy for the vendor-managed inventory system is presented,which considers the quantity-based shipment consolidation and stock replenishment with lead time.Then the system cost is analyzed and a mathematical model is built.Since the model is rather complex,the bounds of the optimal policy are first attained,then the problem is solved by a heuristic algorithm.Through experiments the relationship between the order lead time and the corresponding integrated policy is discussed,and the influence on the system cost is also analyzed.The results reveal that the lead time's influence on the system is more serious with the increase of the order lead time,the integrated policy with the order lead time is more reasonable and the optimal policy can minimize the total system cost.Finally,the parameter sensitivity of the model is analyzed.
文摘USA nuclear waste management program has stalled due to its continued insistence upon using Yucca Mountain for its disposal of DOE (Department of Energy) and commercial power plants NSF (nuclear spent fuel). Increased flexibility and significant changes in DOE program are proposed. They include a private waste company to manage it; the construction and operation of ICS (interim centralized storage) facilities for NSF; the search for an AGR (alternate geological repository); the use of a different methodology involving key local and state participants; a new "as safe as practical" strategy with defined benefits to the involved locations and states. Assured removal of NSF from ICS and providing limited Price Anderson indemnity for the program will enhance its acceptance. Minimum politics, regular information meetings, compromises, good cost projections and meeting schedules will be necessary to increase the chances of the proposed nuclear waste management program.