To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC...To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations.展开更多
Due to high competition of the agriculture machines sector, the auto parts suppliers are investing in research to promote the development and reduce the costs of the products, passing these results to their clients wh...Due to high competition of the agriculture machines sector, the auto parts suppliers are investing in research to promote the development and reduce the costs of the products, passing these results to their clients who are the automakers. It was identified the need to redesign the regulation sieve system harvester, which is a compound assembly in the harvester's grain cleaning system, with the objective to reduce the costs and improve the ergonomic aspect, keeping the same efficiency from the original project. The improvement was developed by studying the original design and identifying possible project fails, such as components and manufacturing process which could be eliminated. For this, it was needed to do a research about rules and project considerations that must be applied in the products development and ergonomic too, specifically about geometric forms and anthropometric measures. From the redesign of this system, it is verified that it is possible by a study to identify possible improvements, and to develop a new system by a simple project, improving the ergonomic, reducing the cost and keeping the same efficacy from the original project.展开更多
AREVA operates a world-wide unique thermal hydraulic platform to ensure high safety standards in the nuclear industries. This platform is operated as an accredited test and inspection body according to ISO 17025 and 1...AREVA operates a world-wide unique thermal hydraulic platform to ensure high safety standards in the nuclear industries. This platform is operated as an accredited test and inspection body according to ISO 17025 and 17020 to grant a high and independently confmned quality standard. The accreditation also ensures the independency of the organization and confidentiality to the individual stakeholders, for example research centers, utilities, components suppliers, engineering companies and vendors. Especially for nuclear power plants, it is very relevant to consider that reliability depends on the integrity of its components during its life time-from design through construction, operation and maintenance. For example, a typical NPP (nuclear power plant) has 1,000 to 2,000 large valves and 7,500 to 12,500 small valves, of which about 200 to 400 are designated Safety Class 1. The qualification of these Safety Class 1 components is relevant for reactor new builds but also for installed plants. This paper explains newly established qualification tasks, the corresponding testing infrastructure, and the state of the art of testing technology. By way of example, the paper describes the program and possible sequence of qualifying NPP safety-related components.展开更多
文摘To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations.
文摘Due to high competition of the agriculture machines sector, the auto parts suppliers are investing in research to promote the development and reduce the costs of the products, passing these results to their clients who are the automakers. It was identified the need to redesign the regulation sieve system harvester, which is a compound assembly in the harvester's grain cleaning system, with the objective to reduce the costs and improve the ergonomic aspect, keeping the same efficiency from the original project. The improvement was developed by studying the original design and identifying possible project fails, such as components and manufacturing process which could be eliminated. For this, it was needed to do a research about rules and project considerations that must be applied in the products development and ergonomic too, specifically about geometric forms and anthropometric measures. From the redesign of this system, it is verified that it is possible by a study to identify possible improvements, and to develop a new system by a simple project, improving the ergonomic, reducing the cost and keeping the same efficacy from the original project.
文摘AREVA operates a world-wide unique thermal hydraulic platform to ensure high safety standards in the nuclear industries. This platform is operated as an accredited test and inspection body according to ISO 17025 and 17020 to grant a high and independently confmned quality standard. The accreditation also ensures the independency of the organization and confidentiality to the individual stakeholders, for example research centers, utilities, components suppliers, engineering companies and vendors. Especially for nuclear power plants, it is very relevant to consider that reliability depends on the integrity of its components during its life time-from design through construction, operation and maintenance. For example, a typical NPP (nuclear power plant) has 1,000 to 2,000 large valves and 7,500 to 12,500 small valves, of which about 200 to 400 are designated Safety Class 1. The qualification of these Safety Class 1 components is relevant for reactor new builds but also for installed plants. This paper explains newly established qualification tasks, the corresponding testing infrastructure, and the state of the art of testing technology. By way of example, the paper describes the program and possible sequence of qualifying NPP safety-related components.