AIM: To evaluate the value of endovascular stent in the treatment of portal hypertension caused by benign main portal vein stenosis.METHODS: Portal vein stents were implanted in six patients with benign main portal ve...AIM: To evaluate the value of endovascular stent in the treatment of portal hypertension caused by benign main portal vein stenosis.METHODS: Portal vein stents were implanted in six patients with benign main portal vein stenosis (inflammatory stenosis in three cases, postprocedure of liver transplantation in another three cases). Changes in portal vein pressure, portal vein patency, relative clinical symptoms, complications, and survival were evaluated.RESULTS: Six metallic stents were successfully placed across the portal vein stenotic or obstructive lesions in six patients. Mean portal venous pressure decreased significantly after stent implantation from (37.3±4.7) cm H2O to (18.0±1.9) cm H2O. The portal blood flow restoredand the symptoms caused by portal hypertension were eliminated. There were no severe procedure-related complications. The patients were followed up for 1-48 mo. The portal vein remained patent during follow-up. All patients survived except for one patient who died of other complications of liver transplantation. CONCLUSION: Percutaneous portal vein stent placement for the treatment of portal hypertension caused by benign main portal vein stenosis is safe and effective.展开更多
Rock burst is one of the most catastrophic dynamic hazards in coal mining. A static and dynamic stresses superposition-based(SDSS-based) risk evaluation method of rock burst was proposed to pre-evaluate rock burst ris...Rock burst is one of the most catastrophic dynamic hazards in coal mining. A static and dynamic stresses superposition-based(SDSS-based) risk evaluation method of rock burst was proposed to pre-evaluate rock burst risk. Theoretical basis of this method is the stress criterion incurring rock burst and rock burst risk is evaluated according to the closeness degree of the total stress(due to the superposition of static stress in the coal and dynamic stress induced by tremors) with the critical stress. In addition, risk evaluation criterion of rock burst was established by defining the "Satisfaction Degree" of static stress. Furthermore,the method was used to pre-evaluate rock burst risk degree and prejudge endangered area of an insular longwall face in Nanshan Coal Mine in China. Results show that rock burst risk is moderate at advance extent of 97 m, strong at advance extent of 97-131 m,and extremely strong(i.e. inevitable to occur) when advance extent exceeds 131 m(mining is prohibited in this case). The section of two gateways whose floor abuts 15-3 coal seam is a susceptible area prone to rock burst. Evaluation results were further compared with rock bursts and tremors detected by microseismic monitoring. Comparison results indicate that evaluation results are consistent with microseismic monitoring, which proves the method's feasibility.展开更多
文摘AIM: To evaluate the value of endovascular stent in the treatment of portal hypertension caused by benign main portal vein stenosis.METHODS: Portal vein stents were implanted in six patients with benign main portal vein stenosis (inflammatory stenosis in three cases, postprocedure of liver transplantation in another three cases). Changes in portal vein pressure, portal vein patency, relative clinical symptoms, complications, and survival were evaluated.RESULTS: Six metallic stents were successfully placed across the portal vein stenotic or obstructive lesions in six patients. Mean portal venous pressure decreased significantly after stent implantation from (37.3±4.7) cm H2O to (18.0±1.9) cm H2O. The portal blood flow restoredand the symptoms caused by portal hypertension were eliminated. There were no severe procedure-related complications. The patients were followed up for 1-48 mo. The portal vein remained patent during follow-up. All patients survived except for one patient who died of other complications of liver transplantation. CONCLUSION: Percutaneous portal vein stent placement for the treatment of portal hypertension caused by benign main portal vein stenosis is safe and effective.
基金Project(51174285)supported by the National Natural Science Foundation of China and the Shenhua Group Corporation Limited,ChinaProject(CXZZ12_0949)supported by the Research and Innovation Project for College Graduates of Jiangsu Province,ChinaProject(SZBF2011-6-B35)supported by the Priority Academic Program Development of Jiangsu Higher Education Institutions,China
文摘Rock burst is one of the most catastrophic dynamic hazards in coal mining. A static and dynamic stresses superposition-based(SDSS-based) risk evaluation method of rock burst was proposed to pre-evaluate rock burst risk. Theoretical basis of this method is the stress criterion incurring rock burst and rock burst risk is evaluated according to the closeness degree of the total stress(due to the superposition of static stress in the coal and dynamic stress induced by tremors) with the critical stress. In addition, risk evaluation criterion of rock burst was established by defining the "Satisfaction Degree" of static stress. Furthermore,the method was used to pre-evaluate rock burst risk degree and prejudge endangered area of an insular longwall face in Nanshan Coal Mine in China. Results show that rock burst risk is moderate at advance extent of 97 m, strong at advance extent of 97-131 m,and extremely strong(i.e. inevitable to occur) when advance extent exceeds 131 m(mining is prohibited in this case). The section of two gateways whose floor abuts 15-3 coal seam is a susceptible area prone to rock burst. Evaluation results were further compared with rock bursts and tremors detected by microseismic monitoring. Comparison results indicate that evaluation results are consistent with microseismic monitoring, which proves the method's feasibility.