期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
负压吸引结合液氮冷冻治疗白癜风34例疗效分析 被引量:3
1
作者 夏福林 吴志梅 费广好 《皮肤病与性病》 2000年第3期33-34,共2页
对 34例静止期白癜风患者利用液氮冷冻结合负压吸引进行表皮移植 (135孔面积 135cm2 )结果痊愈率76 % ,总有效率 92 6 % ,此方法扩大了表皮自体移植的适应症 ,使其不再受皮损解剖位置的限制。并分析了白癜风病程 。
关键词 静止静 白癜风 液氮冷冻 负压吸引 自体移植
下载PDF
Impact of Wind Integration on Transient Voltage Stability in Regional Grid 被引量:1
2
作者 Zhang Feng Li Mingxia +2 位作者 Fan Guowei Luo Zhongyou Chang Xiqiang 《Electricity》 2012年第2期20-25,共6页
With the increasing development of wind power,the scale of wind farms and unit capacity of wind turbines are getting larger and larger,and the impact of wind integration on power systems cannot be ignored.However,in m... With the increasing development of wind power,the scale of wind farms and unit capacity of wind turbines are getting larger and larger,and the impact of wind integration on power systems cannot be ignored.However,in most cases,the areas with a plenty of wind resources do not have strong grid structures.Furthermore,the characteristics of wind power dictate that wind turbines need to absorb reactive power during operation.Because of the strong correlation between voltage stability and systems' reactive power,the impacts of wind integration on voltage stability has become an important issue.Based on the power system simulation software DIgSILENT and combined analysis of actual practice,this paper investigates the impacts of two types of wind farms on voltage stability:namely a type of wind farms which are constituted by constant speed wind turbines based on common induction generators(IG) and another type of wind farms which are constituted by VSCF wind turbines based on doubly-fed induction generators(DFIG).Through investigation the critical fault clearing time is presented for different outputs of wind farms.Moreover,the impacts of static var compensator(SVC) and static synchronous compensator(STATCOM) on transient voltage stability in IG-based wind farms are studied to improve the security and stability of the Jiangsu power grid after the integration of large scale wind power. 展开更多
关键词 wind farm transient voltage stability dynamic reactive power compensation
下载PDF
Instantaneous Real-Time Detection Technology of GLI on FY-4 Geostationary Meteorological Satellite
3
作者 BAO Shutong LI Yunfei +2 位作者 TANG Shaofan LIANG Hua ZHAO Xuemin 《Aerospace China》 2017年第2期23-30,共8页
Lightning is a typical example of an instantaneous random point source target. It has close connection with severe convective phenomena such as a thunderstorm, whose distribution, variation, position and forecasting c... Lightning is a typical example of an instantaneous random point source target. It has close connection with severe convective phenomena such as a thunderstorm, whose distribution, variation, position and forecasting can be acquired through lightning observation. In this paper, we discuss the way to achieve instantaneous lightning signal intensification and detection from geostationary orbit by using the differences between the lightning signal and the slowly changing background noise such as that of cloud, land and ocean, combining three methods, spectral filtering, spatial filtering and background noise, enabling removal between frames. After six months of operation in orbit, lightning within the coverage of the Geostationary Lightning Imager was effectively detected, strongly supporting the case for shorttime and real-time early warning, forecasting and tracking of severe convective phenomena in China. 展开更多
关键词 FY-4 Geostationary Lightning Imager instantaneous lightning real-time detection severe convectivephenomena
下载PDF
Mathematical prototypes for collocating geostationary satellites 被引量:6
4
作者 LI HengNian GAO ZhaoZhao +3 位作者 LI JiSheng LI QuanJun XUE Dan LI DongLin 《Science China(Technological Sciences)》 SCIE EI CAS 2013年第5期1086-1092,共7页
Collocating geostationary satellites sharing the same position is much demanded for satellite operation recently,the separation strategies are adopted to safeguard the satellites collocated of leaving the relative dis... Collocating geostationary satellites sharing the same position is much demanded for satellite operation recently,the separation strategies are adopted to safeguard the satellites collocated of leaving the relative distance beyond collision with different sets of orbit parameters.This paper presents the mathematical prototypes which establish the allowable relative distance with uncertainty of orbital determination(OD),as well as the orbital element offset for each pair of collocated satellites,and puts forward algorithms to build such relationship to face the challenge of putting three satellites sharing the same position,the algorithms to allocate the longitude,eccentricity and inclination for each satellite are also given to ascertain that the mathematical prototypes are the guide specification to design collocation strategy for geostationary satellites. 展开更多
关键词 geostationary satellite (GEO) satellite operation satellite collocation separation strategies
原文传递
An investigation on tether-tugging de-orbit of defunct geostationary satellites 被引量:18
5
作者 LIU HaiTao YANG LePing +1 位作者 ZHANG QingBin ZHU YanWei 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第7期2019-2027,共9页
In recent years,defunct satellites mitigation in the geostationary orbit(GEO) has become a hot issue in the space field.How to transfer defunct geostationary satellites to the graveyard orbit safely,economically and e... In recent years,defunct satellites mitigation in the geostationary orbit(GEO) has become a hot issue in the space field.How to transfer defunct geostationary satellites to the graveyard orbit safely,economically and efficiently presents new challenges to spacecraft dynamics and control.This paper conducts an in-depth investigation on tether-tugging de-orbit issues of defunct geostationary satellites.Firstly,a four-phase tether-tugging de-orbit scheme including acceleration,equilibrium,rotation and return is proposed.This scheme takes into consideration how to avoid the risks of tether ripping,tug-target collision,and tether twist,and how to achieve the mission objective of fuel saving.Secondly,the dynamics model of the tether combination system is established based on Lagrange equation,and the four phases of tether-tugging de-orbit scheme are simulated respectively.Simulation results indicate that the scheme is theoretically feasible and satisfies the design objectives of safety,economy and efficiency,providing a technical approach for engineering application. 展开更多
关键词 geostationary orbit defunct satellites graveyard orbit tether-tugging de-orbit
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部