Oxygen-enriched top-blown smelting is a promising technology for processing waste printed circuit boards(WPCBs).The distribution behavior of valuable elements in WPCBs during smelting was investigated by varying the o...Oxygen-enriched top-blown smelting is a promising technology for processing waste printed circuit boards(WPCBs).The distribution behavior of valuable elements in WPCBs during smelting was investigated by varying the oxygen-enriched concentration,oxygen volume,CaO/SiO_(2)(mass ratio),and Fe/SiO_(2)(mass ratio).The optimal operating conditions were obtained by implementing a one-factor-at-a-time method.X-ray diffractometer,scanning electron microscopy−energy dispersive spectrometer,and inductive coupled plasma-atomic emission spectroscopy methods were utilized to detect the chemical composition,occurrence state as well as elemental contents of alloy and slag.It is found that the elements of Cu,Sn and Ni are mainly accumulated in the alloy while Fe is mainly oxidized into the slag.The direct yields of Cu,Sn and Ni are 90.18%,85.32%and 81.10%under the optimal conditions of temperature 1250℃,oxygen-enriched concentration 30%,oxygen volume 24 L,CaO/SiO_(2) mass ratio 0.55,and Fe/SiO_(2) mass ratio 1.05.The results show that the valuable metals are mainly lost in the slag through mechanical entrainment.展开更多
The effect of deficiency in tunnel crown thickness on the Yellow River Crossing Tunnel with post-tensioned concrete inner lining was investigated by the elasto-plastic finite element method. Changes in the deformation...The effect of deficiency in tunnel crown thickness on the Yellow River Crossing Tunnel with post-tensioned concrete inner lining was investigated by the elasto-plastic finite element method. Changes in the deformations and circumferential stresses of the post-tensioned concrete inner lining with the gradual decrease of the tunnel crown thickness were compared, and the potential bearing risk of insufficient tunnel crown thickness for the Yellow River Crossing Tunnel was revealed. Based on the finite element calculation results of circumferential stresses under different defective cases, the corresponding reinforcement schemes were proposed. The calculation results show that the inner lining can still maintain a satisfactory stress state when the tunnel crown thickness is equal to or greater than 0. 28 m. When the tunnel crown thickness decreases below 0.28 m, the external surface of the crown and internal surface of the crown's adjacent areas may be under tension. The tension stresses will incrementally increase and ultimately exceed the tensile strength of the inner lining concrete as the tunnel crown thickness further decreases gradually. Then, the Yellow River Crossing Tunnel cannot operate normally, and severe cracking, leaking or even failure may occur. When the tunnel crown thickness is equal to or greater than 0.28 m, the reinforcement suggestions are that the void spaces between the inner lining and the outer lining should be back-filled with concrete. When the tunnel crown thickness is less than 0. 28 m, the inner lining should be reinforced by steel plates after concrete back-filling.展开更多
The distribution of front abutment pressure is closely related to the force,deformation and energy distribution of hard roof before periodic weighting. So it is necessary to carry out research on the relationship betw...The distribution of front abutment pressure is closely related to the force,deformation and energy distribution of hard roof before periodic weighting. So it is necessary to carry out research on the relationship between them. According to front abutment pressure distribution feature,using the location of peak front abutment pressure as the dividing point,coal seam is divided into two parts along the direction of mining: the yield zone that is the area between the faceline and the point where the maximum front abutment pressure occurs,and the elastic zone that is the part before the point of peak front abutment pressure. The proposed mechanical model of unit width hard roof at the panel center before periodic weighting consists of five parts including the yield zone. All parameters of the deflection equations for each of the five parts that satisfy the continuity conditions and natural boundary conditions are obtained by using the Matlab software. The continuous curves of front abutment pressure,deflection,bending moment and bending strain energy density distribution of hard roof are obtained by iterative approximation method,and the relationship between the yield zone width and the above curves are analyzed in detailed.展开更多
By turning to the theory of elastic thin plates, a mechanical model of the main roof breaking for severely inclined seam under long wall working was esbalished, in which formulaes were deduced for the calculation of t...By turning to the theory of elastic thin plates, a mechanical model of the main roof breaking for severely inclined seam under long wall working was esbalished, in which formulaes were deduced for the calculation of the stress distribution. When the main roof stress distribution was characterized, the failure form of the roof in the long wall coal seam under work was given with the failure criterion deduced. The deduced failure criterion was then applied to the No.3232(3) face of the Li- zuizi Coal Mine; the first pressure for the working face was accurately predicted. Results of the field application show that the main roof of the severely inclined coal seam under long wall working breaks in the O-X pattern, which is basically in accor- dance with the reality.展开更多
In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the ...In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the tailentry and headentry to measure the mining-induced stress. The distribution rules of the front and side abutment pressure were demonstrated. The results show that distribution rules of stress are obviously different in the vicinity of the face and entries. The peak value of abutment pressure in the protective coal pillar and face are located commonly in front of the working face along the strike, and they are located at the stress-decreased zone near the face. There is no stress peak value in the lateral coal mass beside the headentry in front of the face on the strike, and the peak value of abutment pressure appears at the rear area of the face. There are stress peak values both in the protective coal pillar and in the lateral coal mass beside the headentry to the dip.展开更多
基金supported by the National Key R&D Program of China (No.2022YFC2904201)the National Natural Science Foundation of China (Nos.51904124,52004111)+4 种基金Jiangxi Provincial Natural Science Foundation,China (Nos.20224BAB214040,20232BAB204036)the Program of Qingjiang Excellent Young Talents,Jiangxi University of Science and Technology,China (No.JXUSTQJYX2020012)Jiangxi Provincial Cultivation Program for Academic and Technical Leaders of Major Subjects,China (Nos.20212BCJL23052,20212BCJ23006,20212BCJ23007)Double Thousand Plan in Jiangxi Province,China (No.jxsq2019201040)Key Project of Jiangxi Provincial Natural Science Foundation,China (No.20212ACB204015)。
文摘Oxygen-enriched top-blown smelting is a promising technology for processing waste printed circuit boards(WPCBs).The distribution behavior of valuable elements in WPCBs during smelting was investigated by varying the oxygen-enriched concentration,oxygen volume,CaO/SiO_(2)(mass ratio),and Fe/SiO_(2)(mass ratio).The optimal operating conditions were obtained by implementing a one-factor-at-a-time method.X-ray diffractometer,scanning electron microscopy−energy dispersive spectrometer,and inductive coupled plasma-atomic emission spectroscopy methods were utilized to detect the chemical composition,occurrence state as well as elemental contents of alloy and slag.It is found that the elements of Cu,Sn and Ni are mainly accumulated in the alloy while Fe is mainly oxidized into the slag.The direct yields of Cu,Sn and Ni are 90.18%,85.32%and 81.10%under the optimal conditions of temperature 1250℃,oxygen-enriched concentration 30%,oxygen volume 24 L,CaO/SiO_(2) mass ratio 0.55,and Fe/SiO_(2) mass ratio 1.05.The results show that the valuable metals are mainly lost in the slag through mechanical entrainment.
基金The Natural Science Foundation of Hubei Province(No.2017CFB667)the National Natural Science Foundation of China(No.51079107)
文摘The effect of deficiency in tunnel crown thickness on the Yellow River Crossing Tunnel with post-tensioned concrete inner lining was investigated by the elasto-plastic finite element method. Changes in the deformations and circumferential stresses of the post-tensioned concrete inner lining with the gradual decrease of the tunnel crown thickness were compared, and the potential bearing risk of insufficient tunnel crown thickness for the Yellow River Crossing Tunnel was revealed. Based on the finite element calculation results of circumferential stresses under different defective cases, the corresponding reinforcement schemes were proposed. The calculation results show that the inner lining can still maintain a satisfactory stress state when the tunnel crown thickness is equal to or greater than 0. 28 m. When the tunnel crown thickness decreases below 0.28 m, the external surface of the crown and internal surface of the crown's adjacent areas may be under tension. The tension stresses will incrementally increase and ultimately exceed the tensile strength of the inner lining concrete as the tunnel crown thickness further decreases gradually. Then, the Yellow River Crossing Tunnel cannot operate normally, and severe cracking, leaking or even failure may occur. When the tunnel crown thickness is equal to or greater than 0.28 m, the reinforcement suggestions are that the void spaces between the inner lining and the outer lining should be back-filled with concrete. When the tunnel crown thickness is less than 0. 28 m, the inner lining should be reinforced by steel plates after concrete back-filling.
基金supported jointly by the National Basic Research Program of China (No.2015CB251603)the National Natural Science of China (No.51374197)the Independent Project of State Key Laboratory of Coal Resources and Safe Mining (CUMT) of China (No.SKLCRSM12X06)
文摘The distribution of front abutment pressure is closely related to the force,deformation and energy distribution of hard roof before periodic weighting. So it is necessary to carry out research on the relationship between them. According to front abutment pressure distribution feature,using the location of peak front abutment pressure as the dividing point,coal seam is divided into two parts along the direction of mining: the yield zone that is the area between the faceline and the point where the maximum front abutment pressure occurs,and the elastic zone that is the part before the point of peak front abutment pressure. The proposed mechanical model of unit width hard roof at the panel center before periodic weighting consists of five parts including the yield zone. All parameters of the deflection equations for each of the five parts that satisfy the continuity conditions and natural boundary conditions are obtained by using the Matlab software. The continuous curves of front abutment pressure,deflection,bending moment and bending strain energy density distribution of hard roof are obtained by iterative approximation method,and the relationship between the yield zone width and the above curves are analyzed in detailed.
基金Supported by the National Natural Science Foundation of China (51074005, 51004004, 51074003)
文摘By turning to the theory of elastic thin plates, a mechanical model of the main roof breaking for severely inclined seam under long wall working was esbalished, in which formulaes were deduced for the calculation of the stress distribution. When the main roof stress distribution was characterized, the failure form of the roof in the long wall coal seam under work was given with the failure criterion deduced. The deduced failure criterion was then applied to the No.3232(3) face of the Li- zuizi Coal Mine; the first pressure for the working face was accurately predicted. Results of the field application show that the main roof of the severely inclined coal seam under long wall working breaks in the O-X pattern, which is basically in accor- dance with the reality.
基金Supported by the National Natural Science Foundation of Anhui Province (K J2010A090)
文摘In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the tailentry and headentry to measure the mining-induced stress. The distribution rules of the front and side abutment pressure were demonstrated. The results show that distribution rules of stress are obviously different in the vicinity of the face and entries. The peak value of abutment pressure in the protective coal pillar and face are located commonly in front of the working face along the strike, and they are located at the stress-decreased zone near the face. There is no stress peak value in the lateral coal mass beside the headentry in front of the face on the strike, and the peak value of abutment pressure appears at the rear area of the face. There are stress peak values both in the protective coal pillar and in the lateral coal mass beside the headentry to the dip.