This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel(LTCC).The investigation utilizes a comprehensive appro...This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel(LTCC).The investigation utilizes a comprehensive approach that integrates field monitoring,theoretical analysis,and numerical simulation.Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof(LCBM)above the roadway on the stability of the gob-side entry behind the panel.Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar,developed cracks around the roadway,and more pronounced damage to the roadway.Moreover,numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof.This technology significantly reduces the length of the LCBM,thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry.Therefore,this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation,and automatically retain the entry within a hard roof LTCC panel.Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.展开更多
Focusing on the stability of surrounding rock around the roadway driving along next goaf with a narrow coal pillar, a mechanics model of the triangle block structure of main roof above the roadway is established, and ...Focusing on the stability of surrounding rock around the roadway driving along next goaf with a narrow coal pillar, a mechanics model of the triangle block structure of main roof above the roadway is established, and the sliding stability coefficient K 1 and the rotation stability coefficient K 2 are proposed to describe the stability of the triangle block structure quantitatively. The structure can keep a self stability before and after the roadway excavation, at the stage of mining induced effect, the stability of the structure is lowered, and the structure may become instability with decreasing the coal strength, increasing the mining height of working face and the mining depth.展开更多
Common short bolts of equal length are widely used to support the roofs of roadways in coal mines.However, they are insufficient to keep the roof stable against large deformations, so docking long bolts with high leve...Common short bolts of equal length are widely used to support the roofs of roadways in coal mines.However, they are insufficient to keep the roof stable against large deformations, so docking long bolts with high levels of elongation that can adapt to large deformations of the surrounding rock have been adopted. This paper proposes a collaborative support method that uses long and short bolts. In this study,the mechanism of docking long bolts and collaborative support was studied. Numerical simulation, similarity simulation, and field testing were used to analyze the distribution law of the displacement, stress,and plastic failure in the surrounding rock under different support schemes. Compared with the equal-length short bolt support, the collaborative support changed the maximum principal stress of the shallow roof from tensile stress to compressive stress, and the minimum principal stress of the roof significantly increased. The stress concentration degree of the anchorage zone clearly increased. The deformation of the roof and the two sides was greatly reduced, and the subsidence shape of the shallow roof changed from serrated to a smooth curve. The roof integrity was enhanced, and the roof moved down as a whole. Plastic failure significantly decreased, and the plastic zone of the roof was within the anchorage range. The similarity simulation results showed that, under the maximum mining stress,the roof collapsed with the equal-length short bolt support but remained stable with the collaborative support. The collaborative support method was successfully applied in the field and clearly improved the stability of the surrounding rock for a large deformation roadway.展开更多
The roof of a roadway under goal with ultra-close separation consists of thin rock strata and rocks caving in upper goal. Influenced by the mining of the upper coal seam, the roof is loose and broken, and its integ- r...The roof of a roadway under goal with ultra-close separation consists of thin rock strata and rocks caving in upper goal. Influenced by the mining of the upper coal seam, the roof is loose and broken, and its integ- rity is poor. Resin anchored bolts cannot provide an effective anchoring force in such roof conditions. By conducting free expansion tests and field pull-out tests on a hydraulic expansion bolt, this study has ana- lyzed the influencing factors and laws of radial expansion and anchoring force changes in the rod body. This has revealed the anchoring mechanism of such bolts, and has obtained reasonable water injection pressures and suitable drilling diameters (which are 20-25 MPa and 32-35 mm respectively) for the hydraulic expansion bolt (cR28 mm) used in these tests. Based on pull-out tests at different interlayer spacing, the applicability of hydraulic expansion bolts had been verified for controlling the roof of road- ways under goal with ultra-close distance. Combined with the deformation and failure characteristics of the test roadway roof, this paper proposes a united roof-control technology based on the use of hydraulic expansion bolts and advancing intubation for the roof. Engineering practice indicated that the roof of the test roadway did not generate leaking and caving phenomenon, and the amount of roof deformation was controlled to within 150 mm. Maintenance of the roadway roof has been improved significantly, which ensures safe mining in coal seams with ultra-close separation.展开更多
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr...Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.展开更多
In this study, the characteristics of geological structure at Qingshui coal mine were analyzed. And the hollow inclusion strain cell overcoring method was used to obtain the in situ stress. The effect of in situ stres...In this study, the characteristics of geological structure at Qingshui coal mine were analyzed. And the hollow inclusion strain cell overcoring method was used to obtain the in situ stress. The effect of in situ stress on the stability of soft rock roadway was analyzed. The results show that the maximum principal stress is in the horizontal direction with a northeast orientation and has a value of about 1.2–1.9 times larger than gravity; the right side of roadway roof and floor is easily subject to serious deformation and failure, and the in situ stress is found to be a major factor. This paper presents important information for developing countermeasures against the large deformation of the soft rock roadway at Qingshui coal mine.展开更多
This paper analyzed the strata behaviors of solid-coal roadway, gob-side entry driving and deformation law of surrounding rock in depth under high stress and thick composite roof based on the dynamic pressure roadway ...This paper analyzed the strata behaviors of solid-coal roadway, gob-side entry driving and deformation law of surrounding rock in depth under high stress and thick composite roof based on the dynamic pressure roadway as engineering background in Fengcheng mining area, Jiangxi province. The results, both field measurement and numerical simulation show that gob-side entry driving results the deformation of coal roadway main wall, however, entity-coal roadway driving results deformation of main roof and floor. The maintenance state of gob-side entry driving is better than entity-coal roadway, this situation is relevant to thick composite roof layered and easy collapse characteristics. At the same time, this paper put fox'ward and proved proper dynamic pressure roadway supporting scheme under the surrounding rock condition and stress environment.展开更多
Taking Adaohai Coal Mine as the example, underground pressure appearance laws of fully mechanized top coal slice caving on high-dipping and thick coal seams. Through site visit, theoretical analysis and discrete eleme...Taking Adaohai Coal Mine as the example, underground pressure appearance laws of fully mechanized top coal slice caving on high-dipping and thick coal seams. Through site visit, theoretical analysis and discrete element calculation, the research shows that, as the mining deepens, underground stress of lower sublevels is more obvious and higher than that of upper sublevels and is higher in the air return roadway than that in the air intake roadway in the area that is near to the top coal. Because the top coal is thick and gangue is caved above the support, underground pressure to the working face is relatively gentle. Immediate roof will mainly fall down along the floor. Main roof and the rock bed above the main roof will move to the mined out area along the fault in the early stage and then fall down with the mined out area later. In addition, roof pressure mainly periodically appears in two directions along the trend and the dip.展开更多
The properties of broken rock before and after grouting reinforcement are studied. Testing results show that grouting can raise the residual strength of broken rock, and the broken rockness by grouting can keep the st...The properties of broken rock before and after grouting reinforcement are studied. Testing results show that grouting can raise the residual strength of broken rock, and the broken rockness by grouting can keep the steady supporting capacity within a relatively large deformation range. Revealing of the characteristics of stage deformation and damage process comes to the conclusion that the supporting of soft rock roadway should be analyzed in a dynamic view, and the grouting should be delayed at a proper occasion. Based on the above, the stepwise reinforcement technology characterized by immediate shotcreting, timely bolting and delay grouting is put forward and illustrated with a successful engineering practice.展开更多
Roof bolt support system has been widely applied in the No.7, 9 seam in Caozhuang coal mine. However, it has not been able to be applied in the No.10-2 seam since the small interburden (2 m) between No.9 and No.10-2...Roof bolt support system has been widely applied in the No.7, 9 seam in Caozhuang coal mine. However, it has not been able to be applied in the No.10-2 seam since the small interburden (2 m) between No.9 and No.10-2 seam. The No.9 and No.10-2 seams are contiguous seams. The No.9 seam has been mined out and the No.10-2 seam will be mined under the gob of the No.9 seam. The roof strata of the No.10-2 seam may have been weakened and fractured due to the shear failure caused by the No.9 seam mining activities. The steel beam sets spaced at 0.8 m have been used to support the entry of the No.10-2 seam. In order to speed up the advance rate and cut entry development cost, a test area, using roof bolt in conjunction with truss-system, was successfully conducted. This paper presents the support system design, application of designed system, and the test results. Test results provide a cheaper, quicker, and safer way to support entry for the No.10-2 seam.展开更多
基金Project(52104139)supported by the National Natural Science Foundation of China Youth Science FoundationProject(SKLGDUEK2132)supported by the State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology/China University of Mining and Technology-BeijingProjects([2020]2Y030,[2020]2Y019,[2020j3007,[2020]3008,and[2022j0il]supported by the Guizhou Province Science and Technology Planning,China Project(2022B01051)supported by the Key Research and Development Special Tasks of Xinjiang,China。
文摘This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel(LTCC).The investigation utilizes a comprehensive approach that integrates field monitoring,theoretical analysis,and numerical simulation.Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof(LCBM)above the roadway on the stability of the gob-side entry behind the panel.Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar,developed cracks around the roadway,and more pronounced damage to the roadway.Moreover,numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof.This technology significantly reduces the length of the LCBM,thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry.Therefore,this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation,and automatically retain the entry within a hard roof LTCC panel.Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.
文摘Focusing on the stability of surrounding rock around the roadway driving along next goaf with a narrow coal pillar, a mechanics model of the triangle block structure of main roof above the roadway is established, and the sliding stability coefficient K 1 and the rotation stability coefficient K 2 are proposed to describe the stability of the triangle block structure quantitatively. The structure can keep a self stability before and after the roadway excavation, at the stage of mining induced effect, the stability of the structure is lowered, and the structure may become instability with decreasing the coal strength, increasing the mining height of working face and the mining depth.
基金supported by the State Key Program of National Natural Science Foundation of China(No.51234005)the State Key Program of National Natural Science Foundation-Coal Joint Fund(No.51134018)
文摘Common short bolts of equal length are widely used to support the roofs of roadways in coal mines.However, they are insufficient to keep the roof stable against large deformations, so docking long bolts with high levels of elongation that can adapt to large deformations of the surrounding rock have been adopted. This paper proposes a collaborative support method that uses long and short bolts. In this study,the mechanism of docking long bolts and collaborative support was studied. Numerical simulation, similarity simulation, and field testing were used to analyze the distribution law of the displacement, stress,and plastic failure in the surrounding rock under different support schemes. Compared with the equal-length short bolt support, the collaborative support changed the maximum principal stress of the shallow roof from tensile stress to compressive stress, and the minimum principal stress of the roof significantly increased. The stress concentration degree of the anchorage zone clearly increased. The deformation of the roof and the two sides was greatly reduced, and the subsidence shape of the shallow roof changed from serrated to a smooth curve. The roof integrity was enhanced, and the roof moved down as a whole. Plastic failure significantly decreased, and the plastic zone of the roof was within the anchorage range. The similarity simulation results showed that, under the maximum mining stress,the roof collapsed with the equal-length short bolt support but remained stable with the collaborative support. The collaborative support method was successfully applied in the field and clearly improved the stability of the surrounding rock for a large deformation roadway.
基金supports from the National Natural Science Foundation of China (Nos. 51204166 and 51174195)the Advantage Disciplines Construction Fund Program of Jiangsu Universities (No. SZBF2011-6-B35)
文摘The roof of a roadway under goal with ultra-close separation consists of thin rock strata and rocks caving in upper goal. Influenced by the mining of the upper coal seam, the roof is loose and broken, and its integ- rity is poor. Resin anchored bolts cannot provide an effective anchoring force in such roof conditions. By conducting free expansion tests and field pull-out tests on a hydraulic expansion bolt, this study has ana- lyzed the influencing factors and laws of radial expansion and anchoring force changes in the rod body. This has revealed the anchoring mechanism of such bolts, and has obtained reasonable water injection pressures and suitable drilling diameters (which are 20-25 MPa and 32-35 mm respectively) for the hydraulic expansion bolt (cR28 mm) used in these tests. Based on pull-out tests at different interlayer spacing, the applicability of hydraulic expansion bolts had been verified for controlling the roof of road- ways under goal with ultra-close distance. Combined with the deformation and failure characteristics of the test roadway roof, this paper proposes a united roof-control technology based on the use of hydraulic expansion bolts and advancing intubation for the roof. Engineering practice indicated that the roof of the test roadway did not generate leaking and caving phenomenon, and the amount of roof deformation was controlled to within 150 mm. Maintenance of the roadway roof has been improved significantly, which ensures safe mining in coal seams with ultra-close separation.
基金Financial supports are from the National Natural Science Foundation of China (No. 50874104)the Scientific Research Industrialization Project of Jiangsu Universities (No. JH07-023)
文摘Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.
基金provided by the Beijing Natural Science Foundation(No.8142032)the National Natural Science Foundation of China(No.41040027)+2 种基金the State Key Program of National Natural Science of China(No.5113400)the Research Fund for the Doctoral Program of Higher Education(No.20130023110021)the Special Fund of Basic Research and Operating Expenses of State Key Laboratory of Geomechanics and Deep Underground Engineering,China University of Mining&Technology,Beijing
文摘In this study, the characteristics of geological structure at Qingshui coal mine were analyzed. And the hollow inclusion strain cell overcoring method was used to obtain the in situ stress. The effect of in situ stress on the stability of soft rock roadway was analyzed. The results show that the maximum principal stress is in the horizontal direction with a northeast orientation and has a value of about 1.2–1.9 times larger than gravity; the right side of roadway roof and floor is easily subject to serious deformation and failure, and the in situ stress is found to be a major factor. This paper presents important information for developing countermeasures against the large deformation of the soft rock roadway at Qingshui coal mine.
基金Supported by the National Natural Science Foundation of China (51074071) the Scientific Research Fund of Hunan Provincial Education Department (12cy013)
文摘This paper analyzed the strata behaviors of solid-coal roadway, gob-side entry driving and deformation law of surrounding rock in depth under high stress and thick composite roof based on the dynamic pressure roadway as engineering background in Fengcheng mining area, Jiangxi province. The results, both field measurement and numerical simulation show that gob-side entry driving results the deformation of coal roadway main wall, however, entity-coal roadway driving results deformation of main roof and floor. The maintenance state of gob-side entry driving is better than entity-coal roadway, this situation is relevant to thick composite roof layered and easy collapse characteristics. At the same time, this paper put fox'ward and proved proper dynamic pressure roadway supporting scheme under the surrounding rock condition and stress environment.
基金Supported by the Scientific Research Business of China University of Mining & Technology (Beijing) (2009QZ04) the National Natural Science Foundation of China (50974123)
文摘Taking Adaohai Coal Mine as the example, underground pressure appearance laws of fully mechanized top coal slice caving on high-dipping and thick coal seams. Through site visit, theoretical analysis and discrete element calculation, the research shows that, as the mining deepens, underground stress of lower sublevels is more obvious and higher than that of upper sublevels and is higher in the air return roadway than that in the air intake roadway in the area that is near to the top coal. Because the top coal is thick and gangue is caved above the support, underground pressure to the working face is relatively gentle. Immediate roof will mainly fall down along the floor. Main roof and the rock bed above the main roof will move to the mined out area along the fault in the early stage and then fall down with the mined out area later. In addition, roof pressure mainly periodically appears in two directions along the trend and the dip.
文摘The properties of broken rock before and after grouting reinforcement are studied. Testing results show that grouting can raise the residual strength of broken rock, and the broken rockness by grouting can keep the steady supporting capacity within a relatively large deformation range. Revealing of the characteristics of stage deformation and damage process comes to the conclusion that the supporting of soft rock roadway should be analyzed in a dynamic view, and the grouting should be delayed at a proper occasion. Based on the above, the stepwise reinforcement technology characterized by immediate shotcreting, timely bolting and delay grouting is put forward and illustrated with a successful engineering practice.
文摘Roof bolt support system has been widely applied in the No.7, 9 seam in Caozhuang coal mine. However, it has not been able to be applied in the No.10-2 seam since the small interburden (2 m) between No.9 and No.10-2 seam. The No.9 and No.10-2 seams are contiguous seams. The No.9 seam has been mined out and the No.10-2 seam will be mined under the gob of the No.9 seam. The roof strata of the No.10-2 seam may have been weakened and fractured due to the shear failure caused by the No.9 seam mining activities. The steel beam sets spaced at 0.8 m have been used to support the entry of the No.10-2 seam. In order to speed up the advance rate and cut entry development cost, a test area, using roof bolt in conjunction with truss-system, was successfully conducted. This paper presents the support system design, application of designed system, and the test results. Test results provide a cheaper, quicker, and safer way to support entry for the No.10-2 seam.