期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
浴室装修快装工装设计分析
1
作者 廖利民 《科技创新与应用》 2019年第35期90-91,共2页
文章针对酒店浴室设施装修中的安装问题,进行了分析与探讨。首先,对我国当前酒店浴室装修存在的问题进行了分析,并结合酒店浴室的实际要求,进行了初步分析,对浴室产品的模块化及工装设计的新思路进行论述。最后,详细探讨了快速工装的构... 文章针对酒店浴室设施装修中的安装问题,进行了分析与探讨。首先,对我国当前酒店浴室装修存在的问题进行了分析,并结合酒店浴室的实际要求,进行了初步分析,对浴室产品的模块化及工装设计的新思路进行论述。最后,详细探讨了快速工装的构思、设计、优化的开发过程。希望能够找到一种新的设计方案,解决现在酒店情况多变、施工工期长的痛点。 展开更多
关键词 酒店浴室设施 项目交期 快装工装
下载PDF
Traffic Impact on Incentive Contracting Project Time Performance during Highway Construction
2
作者 Jae-Ho Pyeon 《Journal of Civil Engineering and Architecture》 2010年第7期9-14,共6页
The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reducti... The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reduction in capacity during construction activity; consequently road users as well as adjacent businesses must endure the delays and inconveniences associated with transportation construction. Recognizing the problems that construction can produce, state highway agencies (SHAs) have continually sought ways to minimize the negative impact from their construction operations. Incentive contracting has played an important role in this effort to improve project performance. The Florida Department of Transportation (FDOT) is one of the leading SHAs using such innovative contracting methods as Incentive/Disincentive (I/D), A+B (cost plus time bidding) combined with I/D, No Excuse Bonus, and Liquidated Savings. This paper analyzes the traffic impact on incentive project time performance using highway construction projects recently completed in Florida. Project data obtained from FDOT were evaluated using time performance indices. A survey of traffic impact on project work types was performed in Florida in order to evaluate the relationship between construction project types and road traffic influence during construction. Based on the survey results, the 38 most frequently used work types in Florida during the study period were categorized into three traffic impact levels: (1) high traffic impact, (2) medium traffic impact, and (3) low traffic impact. Statistical analysis was performed. The results show that there are significant differences on project time performance between low and high impact levels as well as low and medium impact levels. 展开更多
关键词 Highway construction project performance traffic impact alternative contracting incentive/disincentive
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部