期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
基于时间不一致性偏好的项目进度延误研究
1
作者 张耿 《中国管理科学》 CSSCI 2004年第z1期20-24,共5页
个体偏好的时间不一致性是一种违背基本效用公理的现象,本文在项目管理的环境下,对时间不一致性偏好提出了一个新的特例,推导出这种偏好将在一定条件下造成幼稚型员工的工作拖延,继而引发项目进度延误,我们进一步讨论了这种性质的项目... 个体偏好的时间不一致性是一种违背基本效用公理的现象,本文在项目管理的环境下,对时间不一致性偏好提出了一个新的特例,推导出这种偏好将在一定条件下造成幼稚型员工的工作拖延,继而引发项目进度延误,我们进一步讨论了这种性质的项目进度延误的识别和基本管理策略. 展开更多
关键词 时间不一致性偏好 自我约束 项目进度延误
下载PDF
一种敏捷模式下的质量度量方法
2
作者 祝家东 臧艳辉 《信息通信》 2017年第9期79-80,共2页
在探究敏捷开发模式特点的基础上,提出了一种基于任务延误、缺陷出现及缺陷收敛的质量度量方法,为敏捷模式下改进质量执行成效提供了依据。
关键词 敏捷模式 质量度量 项目延误 缺陷出现 缺陷收敛
下载PDF
Delay Analysis Techniques Comparison
3
作者 Khalid S. AI-Gahtani Satish B. Mohan 《Journal of Civil Engineering and Architecture》 2011年第8期740-747,共8页
Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a... Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a fictional case study that has most types of delay and acceleration events that might be faced on a real project. The case study is applied to all current techniques of delay claims that have been identified from previous studies. The comparison uses the delay claim issues as criteria to evaluate all the delay claim techniques from the case study results. The case study result and discussion demonstrate that the Day-by-Day technique satisfies all the desired criteria while other techniques lack some. 展开更多
关键词 CONSTRUCTION SCHEDULING CLAIM DELAY CPM.
下载PDF
Delays to Large Construction Projects in Ghana: A Risk Overview
4
作者 Joseph Ignatius Teye Buertey Augustine Kaku Miezah Theophilus Adjei Kumi 《Journal of Civil Engineering and Architecture》 2014年第3期367-377,共11页
Delay to large scale projects, which is as a result of actions or inactions of some project stakeholders, is becoming a global phenomena and Ghana is no exception. The objective of the research is to identify, rate an... Delay to large scale projects, which is as a result of actions or inactions of some project stakeholders, is becoming a global phenomena and Ghana is no exception. The objective of the research is to identify, rate and rank the most significant risk factors that causes delay on projects and examine the social impact of these delays to recommend modalities to help mitigate these risk factors. The study adopted quantitative methods with the distribution of 144 questionnaires to built environment professionals receiving a response rate of 75.7%. The instrument listed 58 common factors under eight categories that contribute to the causes of delay for respondents to rate. Analysis of data non-parametric test revealed that client, contractor, material and finance category factors significantly resulted in the schedule delay of large infrastructural projects. The survey analysis revealed that micro-factors that result in delays to large construction projects are time constraint, cost overrun, payment problems, dispute and litigation. The research recommended the following modalities to minimize such delays: availability of resources, improved communication and coordination, proper scope definition and feasibilities, utilization of modern technology, appropriate application of technologically based systems and competent project management's structures. 展开更多
关键词 Cost overruns delayed payment disputes risk and social impact.
下载PDF
Detection of schedule delay risk of empirical construction projects 被引量:1
5
作者 Tsegay GEBREHIWET Hanbin LUO 《Frontiers of Engineering Management》 2018年第2期251-267,共17页
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ... In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision. 展开更多
关键词 fuzzy analytic hierarchy process comprehensive evaluation construction project detection of delay risk relative important index
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部