如何编制合同生效后的项目进度计划,已有成熟的管理程序,如:在合同生效后,通过编制项目的计划与控制程序(Schedulingand Control Procedure),就项目的进度计划体系、内容、编制方法给予明确定义,但对于投标报价阶段,投标商如何编制项目...如何编制合同生效后的项目进度计划,已有成熟的管理程序,如:在合同生效后,通过编制项目的计划与控制程序(Schedulingand Control Procedure),就项目的进度计划体系、内容、编制方法给予明确定义,但对于投标报价阶段,投标商如何编制项目的进度计划,包括:编制的深度、内容、格式,还没有清晰和统一的定义。而此进度计划的编制水平直接影响最终的报价结果,特别是海外EPC投标报价项目,对最终获得项目起着至关重要的作用。论文依据作者以往的经验就如何编制投标报价书中(海外EPC项目)的进度计划予以论述,并列举了案例予以说明。希望通过此文探讨如何编好投标报价阶段的进度计划,共同提高标书进度计划的质量,进而提高EPC项目的中标率。展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
文摘如何编制合同生效后的项目进度计划,已有成熟的管理程序,如:在合同生效后,通过编制项目的计划与控制程序(Schedulingand Control Procedure),就项目的进度计划体系、内容、编制方法给予明确定义,但对于投标报价阶段,投标商如何编制项目的进度计划,包括:编制的深度、内容、格式,还没有清晰和统一的定义。而此进度计划的编制水平直接影响最终的报价结果,特别是海外EPC投标报价项目,对最终获得项目起着至关重要的作用。论文依据作者以往的经验就如何编制投标报价书中(海外EPC项目)的进度计划予以论述,并列举了案例予以说明。希望通过此文探讨如何编好投标报价阶段的进度计划,共同提高标书进度计划的质量,进而提高EPC项目的中标率。
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.