期刊文献+
共找到24篇文章
< 1 2 >
每页显示 20 50 100
Model of generic project risk element transmission theory based on data mining 被引量:3
1
作者 李存斌 王建军 《Journal of Central South University of Technology》 EI 2008年第1期132-135,共4页
In order to construct the data mining frame for the generic project risk research, the basic definitions of the generic project risk element were given, and then a new model of the generic project risk element was pre... In order to construct the data mining frame for the generic project risk research, the basic definitions of the generic project risk element were given, and then a new model of the generic project risk element was presented with the definitions. From the model, data mining method was used to acquire the risk transmission matrix from the historical databases analysis. The quantitative calculation problem among the generic project risk elements was solved. This method deals with well the risk element transmission problems with limited states. And in order to get the limited states, fuzzy theory was used to discrete the historical data in historical databases. In an example, the controlling risk degree is chosen as P(Rs≥2) ≤0.1, it means that the probability of risk state which is not less than 2 in project is not more than 0.1, the risk element R3 is chosen to control the project, respectively. The result shows that three risk element transmission matrix can be acquired in 4 risk elements, and the frequency histogram and cumulative frequency histogram of each risk element are also given. 展开更多
关键词 data mining risk element risk management project management
下载PDF
From risk management to uncertainty management: a significant change in project management 被引量:1
2
作者 李桂君 张跃松 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2006年第3期369-373,共5页
Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty... Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty” interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective, and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management. 展开更多
关键词 project risk management (PRM) project uncertainty management (PUM) risk identification
下载PDF
Risk Management: A New Project Management Perspective 被引量:2
3
作者 Pasis Mselle Jacob Kashiwagi +1 位作者 Dean Kashiwagi Aderemi Adeyemi 《Journal of Civil Engineering and Architecture》 2011年第6期505-512,共8页
Risk management in Botswana has been very ineffective at assisting projects to be on time, on budget, and meeting client's/buyer's expectations. Traditional risk management attempts to manage, control, and direct a ... Risk management in Botswana has been very ineffective at assisting projects to be on time, on budget, and meeting client's/buyer's expectations. Traditional risk management attempts to manage, control, and direct a project through various phases, from planning and design, through procurement, and to construction. However, the risk management in Botswana seems to be either not implemented or not successful. The project performance in Botswana has a poor performance record. The researchers are attempting to identify why the traditional project/risk management is not working. In analyzing the problem in Botswana, the researchers discovered that the traditional risk management model was theoretically unsound, and designed a new project and risk model, with an entirely different approach to risk. The new model is an outgrowth of the highly successful Performance Information Procurement System (PIPS) and the Information Measurement Theory (IMT)/Kashiwagi Solution Model (KSM) concepts. The approach has been presented to some Botswana clients and academics and has received a favorable response. The development of the new risk model will lead to a huge change in the paradigm for delivering projects in Botswana. The theoretical development of the new risk model is ongoing at the University of Botswana as a part of a doctoral dissertation. 展开更多
关键词 Risk management Botswana projects new leadership based PM model.
下载PDF
Study of Quality Management in Construction Projects
4
作者 Tan Chin-Keng Abdul-Rahman, Hamzah 《Chinese Business Review》 2011年第7期542-552,共11页
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi... This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia. 展开更多
关键词 quality management construction project management PRACTICES management commitment PROBLEMS
下载PDF
Rethinking Project Organization and Management
5
作者 Dimitris N. Antoniadis Francis T. Edum-Fotwe Anthony Thorpe 《Journal of Civil Engineering and Architecture》 2011年第1期22-38,共17页
How projects should be organized and managed are two important aspects of the role that Project Managers perform and the processes involved can be linked to the measurement of the project management outcome. Recent st... How projects should be organized and managed are two important aspects of the role that Project Managers perform and the processes involved can be linked to the measurement of the project management outcome. Recent studies indicate that these processes are not implemented and concerns have been raised. The authors present an investigation into the current practices of the three soft project management subject matters of selecting project team members, structuring the teams and the management style followed in the construction industry in UK and their reflection upon the project management outcome. The results confirm the concerns raised and indicate that the current levels of implementation by practitioners delivers only acceptable as opposed to successful level of project management outcome. The findings call for a reconsideration of the approach taken when deciding how to organize and manage project teams and a redress towards improving project management outcome. 展开更多
关键词 Construction project organization management style project management outcome.
下载PDF
Cost Control research in Construction Project Management
6
作者 Danjing wang 《International Journal of Technology Management》 2013年第4期98-100,共3页
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face... Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional. 展开更多
关键词 Cost Control Construction Project Management Quality Control.
下载PDF
Innovate Triple Constraints Model for Better Construction Project Results
7
作者 Nouri Fouad Nouri Robert Marshal 《Journal of Civil Engineering and Architecture》 2013年第3期341-349,共9页
The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will de... The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost and scope). This new model will increase the success factors of any complex program/project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule and additional scope impact. This is complex adaptive system having self organized technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies. 展开更多
关键词 Ants complex system multi agent system project management triple constraints
下载PDF
Study on Ways to Improve Economic Benefits by Strengthening Cost Management
8
作者 Zhu Hongchang 《China's Foreign Trade》 2011年第7期68-70,共3页
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T... Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget. 展开更多
关键词 cost management engineering project management cost control risk control ways tocontrol
下载PDF
Research on Application of BIM Technology in Project Management
9
作者 Jianguo CHEN 《International Journal of Technology Management》 2015年第2期15-17,共3页
According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established ... According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration. 展开更多
关键词 Building Information modeling Project management Computer aided design Process design~ Organization design
下载PDF
Impact Assessment of LEEMP (Local Empowerment and Environmental Management Project) in Adamawa State of Nigeria
10
作者 Aminu Liman Ibrahim Ngah 《Journal of Environmental Science and Engineering(A)》 2015年第1期40-53,共14页
This paper provided a reviewed case of implementation of rural development project in relation to poverty alleviation in Adamawa State of Nigeria. Inco-prorating the community based management project in rural develop... This paper provided a reviewed case of implementation of rural development project in relation to poverty alleviation in Adamawa State of Nigeria. Inco-prorating the community based management project in rural development strategies seems to be the best approach to implement rural development project. The study used both qualitative and quantitative research techniques to obtain data on the implementation of LEEMP (local empowerment and environmental management project). The result shows that the project has impacted positively to rural development of some rural communities in the state. However, there were challenges discovered, which include non-inclusion of some stake holders because of social class or due to political affiliations, while projects are not evenly distributed among communities of serious needs. This paper implies that effective incorporation of rural communities in the managements of rural development projects requires full community participation in the development process. This requires collective action, which ties the community on values, sustainable maintenance of infrastructures, and improvements, in cultures, of environmental conservation and economics benefits into rural development, with balancing the aim of sustaining social infrastructures, environmental management and poverty alleviation. 展开更多
关键词 COMMUNITY environment INFRASTRUCTURES PARTICIPATION rural poverty.
下载PDF
Marine Research Standardization:A Project Management Study
11
作者 Zhang Yange 《China Standardization》 2009年第6期33-37,共5页
Using modern project managementprinciples,this paper analyzes the current state ofmarine research project management in China.Itexplains the function and significance of standardizedproject management,and then puts fo... Using modern project managementprinciples,this paper analyzes the current state ofmarine research project management in China.Itexplains the function and significance of standardizedproject management,and then puts forwardstrategies for the implementation of standardizationof marine project management.This is done to improvemarine research project management inChina,better the level of scientific research intooceans and promote the development of marinescience and technology in China. 展开更多
关键词 marine research project management STANDARDIZATION
下载PDF
Thinking substation construction project management methods
12
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control BIDDING civil engineering
下载PDF
Rationality of escalating commitment in information systems project management: An inter-disciplinary perspective
13
作者 Dmitriy V. Chulkov 《Chinese Business Review》 2010年第7期48-57,共10页
Escalation of commitment has been linked to losses in information systems (IS) projects. Understanding the nature and the rationality of escalation allows the firm to promote optimal project management practices. Th... Escalation of commitment has been linked to losses in information systems (IS) projects. Understanding the nature and the rationality of escalation allows the firm to promote optimal project management practices. This study takes an inter-disciplinary approach and draws on research from economics and management to create a model of irrational escalation and a model of rational escalation. The forces that contribute to irrational escalation include the responsibility of the same manager for both the project selection and project continuation decisions that create proneness to self-justification, the potential for negative framing of decision options due to large sunk costs, the proximity of project completion and the presence of organizational inertia. Identifying these irrational escalation factors helps design appropriate de-escalation techniques. The rational escalation model draws on the real option theory and the bandit process theory to identify conditions when project continuation is justified by the value of information and the value of flexibility that the firm receives from continuing the project. 展开更多
关键词 project management project termination escalation of commitment management information systems INCENTIVES
下载PDF
Research on Contract Management and Control in the Process of Project Cost
14
作者 Lingtao BIAN 《International Journal of Technology Management》 2015年第5期44-46,共3页
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ... In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract. 展开更多
关键词 Construction project Cost management Contract management Problems and countermeasures
下载PDF
The Application of AHP Model in Recruiting Middle Managers for Enterprises ——Taking Recruiting Project Managers for Example
15
作者 Yinhua Liu Feng Ye 《International English Education Research》 2014年第6期16-19,共4页
With the advertisement of the era of knowledge economy, human has become the core element in the enterprise competitiveness. It's one of the problems for human resource managers to select the most suitable person amo... With the advertisement of the era of knowledge economy, human has become the core element in the enterprise competitiveness. It's one of the problems for human resource managers to select the most suitable person among many candidates. Nowadays, most enterprises resort to the simple evaluation in hiring which is unfair for evaluating the abilities of applicants. AHP model is a method which combining qualitative and quantitative. This paper applies the AHP model to hiring the middle managers and takes the recruiting of project managers for example to analyze its effectiveness. Hope to provide scientific decision basis for recruiting, middle managers. 展开更多
关键词 AHP model RECRUIT Middle managers
下载PDF
The Application of AHP Model in Recruiting Middle Managers for Enterprises --Taking Recruiting Project Managers for Example
16
作者 Yinhua Liu Feng Ye 《International English Education Research》 2014年第7期91-94,共4页
With the advertisement of the era of knowledge economy, human has become the core element in the enterprise competitiveness. It's one of the problems for human resource managers to select the most suitable person amo... With the advertisement of the era of knowledge economy, human has become the core element in the enterprise competitiveness. It's one of the problems for human resource managers to select the most suitable person among many candidates. Nowadays, most enterprises resort to the simple evaluation in hiring which is unfair for evaluating the abilities of applicants. AHP model is a method which combining qualitative and quantitative. This paper applies the AHP model to hiring the middle managers and takes the recruiting of project managers for example to analyze its effectiveness. Hope to provide scientific decision basis for recruiting middle managers. 展开更多
关键词 AHP model RECRUIT Middle managers
下载PDF
Present situation and improving measures of Chinese Construction Engineering Management informatization
17
作者 ZHOU Chuan 《International English Education Research》 2017年第4期73-74,共2页
Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering ma... Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering management model can not meet the needs of a large number of construction project information exchanges. Only realizing informationization of construction engineering management, can reduce the cost of construction projects, improve the efficiency of project management and construction progress. This paper analyzes the current situation of construction management informatization, and puts forward some suggestions to strengthen the construction management information construction. 展开更多
关键词 engineering management~ Information system~ Architectural Engineering
下载PDF
Discussion on Urban Sewage Treatment Technology of Dalian
18
作者 Ma Renjiao 《International Journal of Technology Management》 2014年第10期14-15,共2页
Taking a sewage treatment project of Dalian for example, this paper studied the feasibility and characteristics of two sewage treatment technologies, analyzed the process, operation management and energy consumption, ... Taking a sewage treatment project of Dalian for example, this paper studied the feasibility and characteristics of two sewage treatment technologies, analyzed the process, operation management and energy consumption, and determined the hydrolytic sedimentation tank - biological filter - V-Filter technology as the final solution of this project. 展开更多
关键词 Sewage Treatment TECHNOLOGY FEASIBILITY
下载PDF
工程经济征订启事
19
《工程经济》 2014年第9期70-70,共1页
《工程经济》月刊由中国建设银行主管,中国建设工程造价管理协会建行委员会主办、清华大学建设管理系协办的国家正式期刊,是中国建设工程造价管理协会建设工程造价管理优秀期刊。本刊致力于为业界读者提供建设管理领域的最新信息,重点... 《工程经济》月刊由中国建设银行主管,中国建设工程造价管理协会建行委员会主办、清华大学建设管理系协办的国家正式期刊,是中国建设工程造价管理协会建设工程造价管理优秀期刊。本刊致力于为业界读者提供建设管理领域的最新信息,重点研讨我国建设领域实施工程量清单计价模式后,工程造价管理工作面临的新形势、新问题,出现的新知识、新方法和新技术及其在建设领域招标与投标过程中的应用。近年来。 展开更多
关键词 工程经济 招标与投标 征订启事 清单计价 工程造价管理 中国建设银行 订阅单位 建设管理 项目管理理
原文传递
工程经济
20
《工程经济》 2014年第8期69-69,共1页
征订启事《工程经济》月刊由中国建设银行主管,中国建设工程造价管理协会建行委员会主办、清华大学建设管理系协办的国家正式期刊,是中国建设工程造价管理协会建设工程造价管理优秀期刊。本刊致力于为业界读者提供建设管理领域的最新信... 征订启事《工程经济》月刊由中国建设银行主管,中国建设工程造价管理协会建行委员会主办、清华大学建设管理系协办的国家正式期刊,是中国建设工程造价管理协会建设工程造价管理优秀期刊。本刊致力于为业界读者提供建设管理领域的最新信息,重点研讨我国建设领域实施工程量清单计价模式后,工程造价管理工作面临的新形势、新问题,出现的新知识、新方法和新技术及其在建设领域招标与投标过程中的应用。近年来。 展开更多
关键词 工程经济 招标与投标 清单计价 征订启事 工程造价管理 中国建设银行 订阅单位 管理咨询 项目管理理
原文传递
上一页 1 2 下一页 到第
使用帮助 返回顶部