基于时间不一致性偏好的项目进度延误研究
1
作者 张耿 《中国管理科学》 CSSCI 2004年第z1期20-24,共5页
个体偏好的时间不一致性是一种违背基本效用公理的现象,本文在项目管理的环境下,对时间不一致性偏好提出了一个新的特例,推导出这种偏好将在一定条件下造成幼稚型员工的工作拖延,继而引发项目进度延误,我们进一步讨论了这种性质的项目... 个体偏好的时间不一致性是一种违背基本效用公理的现象,本文在项目管理的环境下,对时间不一致性偏好提出了一个新的特例,推导出这种偏好将在一定条件下造成幼稚型员工的工作拖延,继而引发项目进度延误,我们进一步讨论了这种性质的项目进度延误的识别和基本管理策略. 展开更多
关键词 时间不一致性偏好 自我约束 项目进度延误
下载PDF
Delay Analysis Techniques Comparison
2
作者 Khalid S. AI-Gahtani Satish B. Mohan 《Journal of Civil Engineering and Architecture》 2011年第8期740-747,共8页
Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a... Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a fictional case study that has most types of delay and acceleration events that might be faced on a real project. The case study is applied to all current techniques of delay claims that have been identified from previous studies. The comparison uses the delay claim issues as criteria to evaluate all the delay claim techniques from the case study results. The case study result and discussion demonstrate that the Day-by-Day technique satisfies all the desired criteria while other techniques lack some. 展开更多
关键词 CONSTRUCTION SCHEDULING CLAIM DELAY CPM.
下载PDF
Detection of schedule delay risk of empirical construction projects 被引量:1
3
作者 Tsegay GEBREHIWET Hanbin LUO 《Frontiers of Engineering Management》 2018年第2期251-267,共17页
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ... In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision. 展开更多
关键词 fuzzy analytic hierarchy process comprehensive evaluation construction project detection of delay risk relative important index