南非布洛克兰斯拱桥 被引量:5
1
作者 许有胜 陈宝春 《中外公路》 北大核心 2005年第4期109-112,共4页
南非布洛克兰斯拱桥建成于1983年,跨径272m,是非洲最大跨径的混凝土拱桥,在当时同类桥型中名列世界第四,至今仍是世界跨径第七大的混凝土拱桥。布洛克兰斯拱桥桥面离河床底216m,十分雄伟壮观。拱圈采用临时塔架悬臂吊装法并由河堤两岸... 南非布洛克兰斯拱桥建成于1983年,跨径272m,是非洲最大跨径的混凝土拱桥,在当时同类桥型中名列世界第四,至今仍是世界跨径第七大的混凝土拱桥。布洛克兰斯拱桥桥面离河床底216m,十分雄伟壮观。拱圈采用临时塔架悬臂吊装法并由河堤两岸向中央对称施工,450m长的连续预应力混凝土桥面板采用滑模法逐段现浇施工。 展开更多
关键词 南非 布洛克兰斯 塔架悬臂吊装法 滑模法 预应力混凝土桥面板
下载PDF
Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
2
作者 Janusz Hotowaty Dariusz Jurkowski 《Journal of Civil Engineering and Architecture》 2015年第12期1432-1438,共7页
The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small river... The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints. 展开更多
关键词 Prestress concrete bridge continuous bridge twin rib deck span-by-span construction FORMWORK falsework.
下载PDF