In the process of grid-connected wind and solar power generation,there are problems of high rate of abandoning wind and light and insufficient energy.In order to solve these problems,we construct a grid-connected wind...In the process of grid-connected wind and solar power generation,there are problems of high rate of abandoning wind and light and insufficient energy.In order to solve these problems,we construct a grid-connected wind-solar hydrogen storage(alkaline electrolyzer(AE)-hydrogen storage tank-battery-proton exchange membrane fuel cell(PEMFC))coupled system architecture.A grid-connected compensation/consumption hierarchical control strategy based on wind-solar hydrogen coupling is proposed.During the grid-connected process of wind and solar power generation,the upper-level control allocates power reasonably to the hydrogen energy storage system by dispatching the power of wind and solar power generation.At the same time,the control strategy ensures that the pressure of the hydrogen storage tank is within the safety range limit,and the lower control completes the control of the duty cycle of the converter in the system.Due to the randomness of wind and light,the hydrogen energy storage system is divided into three working conditions,namely compensation,balance and consumption,and five working modes.The simulation results show that the hydrogen energy storage system compensates for 40%of the power shortage,and consumes 27.5%of the abandoned wind and solar energy,which improves the utilization rate of clean energy.展开更多
To optimize peaking operation when high proportion new energy accesses to power grid,evaluation indexes are proposed which simultaneously consider wind-solar complementation and source-load coupling.A typical wind-sol...To optimize peaking operation when high proportion new energy accesses to power grid,evaluation indexes are proposed which simultaneously consider wind-solar complementation and source-load coupling.A typical wind-solar power output scene model based on peaking demand is established which has anti-peaking characteristic.This model uses balancing scenes and key scenes with probability distribution based on improved Latin hypercube sampling(LHS)algorithm and scene reduction technology to illustrate the influence of wind-solar on peaking demand.Based on this,a peak shaving operation optimization model of high proportion new energy power generation is established.The various operating indexes after optimization in multi-scene peaking are calculated,and the ability of power grid peaking operation is compared whth that considering wind-solar complementation and source-load coupling.Finally,a case of high proportion new energy verifies the feasibility and validity of the proposed operation strategy.展开更多
基金Xi’an Key Laboratory of Clean Energy(No.2019219914SYS014CG036)Natural Science Foundation of Xi’an City(No.XA2020-CXRCFW-0247)Yulin Industry-University-Research Cooperation Project(No.2019-173)。
文摘In the process of grid-connected wind and solar power generation,there are problems of high rate of abandoning wind and light and insufficient energy.In order to solve these problems,we construct a grid-connected wind-solar hydrogen storage(alkaline electrolyzer(AE)-hydrogen storage tank-battery-proton exchange membrane fuel cell(PEMFC))coupled system architecture.A grid-connected compensation/consumption hierarchical control strategy based on wind-solar hydrogen coupling is proposed.During the grid-connected process of wind and solar power generation,the upper-level control allocates power reasonably to the hydrogen energy storage system by dispatching the power of wind and solar power generation.At the same time,the control strategy ensures that the pressure of the hydrogen storage tank is within the safety range limit,and the lower control completes the control of the duty cycle of the converter in the system.Due to the randomness of wind and light,the hydrogen energy storage system is divided into three working conditions,namely compensation,balance and consumption,and five working modes.The simulation results show that the hydrogen energy storage system compensates for 40%of the power shortage,and consumes 27.5%of the abandoned wind and solar energy,which improves the utilization rate of clean energy.
基金Youth Science and Technology Fund Project of Gansu Province(No.18JR3RA011)Major Projects in Gansu Province(No.17ZD2GA010)+1 种基金Science and Technology Projects Funding of State Grid Corporation(No.522727160001)Science and Technology Projects of State Grid Gansu Electric Power Company(No.52272716000K)
文摘To optimize peaking operation when high proportion new energy accesses to power grid,evaluation indexes are proposed which simultaneously consider wind-solar complementation and source-load coupling.A typical wind-solar power output scene model based on peaking demand is established which has anti-peaking characteristic.This model uses balancing scenes and key scenes with probability distribution based on improved Latin hypercube sampling(LHS)algorithm and scene reduction technology to illustrate the influence of wind-solar on peaking demand.Based on this,a peak shaving operation optimization model of high proportion new energy power generation is established.The various operating indexes after optimization in multi-scene peaking are calculated,and the ability of power grid peaking operation is compared whth that considering wind-solar complementation and source-load coupling.Finally,a case of high proportion new energy verifies the feasibility and validity of the proposed operation strategy.