A hydrogen production and conversion plant from wind power was installed in the Sotavento wind farm by Gas Natural and the Galician Government. This facility is the highest electrolysis power installed at the European...A hydrogen production and conversion plant from wind power was installed in the Sotavento wind farm by Gas Natural and the Galician Government. This facility is the highest electrolysis power installed at the European level. It consists of an electrolyser of 300 kW, a piston compressor, a 1,725 Nm3 H2 storage system and an engine of 55 kW. This pilot plant is being operated by Natural Gas in order to extrapolate its behavior to that of an industrial facility capable of managing all the production of Sotavento wind farm following different strategies: balancing, peak-shaving and repowering. In this paper, preliminary results at the facility are presented. The aim of these first tests has been to describe the operation of equipment under operating conditions required in the management of wind power production, in order to understand the behavior of the different equipment and try to make them suitable for this type of applications. This paper shows the difficulty of operating these systems under the wind power requirements.展开更多
文摘A hydrogen production and conversion plant from wind power was installed in the Sotavento wind farm by Gas Natural and the Galician Government. This facility is the highest electrolysis power installed at the European level. It consists of an electrolyser of 300 kW, a piston compressor, a 1,725 Nm3 H2 storage system and an engine of 55 kW. This pilot plant is being operated by Natural Gas in order to extrapolate its behavior to that of an industrial facility capable of managing all the production of Sotavento wind farm following different strategies: balancing, peak-shaving and repowering. In this paper, preliminary results at the facility are presented. The aim of these first tests has been to describe the operation of equipment under operating conditions required in the management of wind power production, in order to understand the behavior of the different equipment and try to make them suitable for this type of applications. This paper shows the difficulty of operating these systems under the wind power requirements.