This paper describes the development and challenge of HIV/AIDS testing laboratory network and quality assurance system in China. At present,the HIV/AIDS testing laboratories includes three classes,the National AIDS Re...This paper describes the development and challenge of HIV/AIDS testing laboratory network and quality assurance system in China. At present,the HIV/AIDS testing laboratories includes three classes,the National AIDS Reference Laboratory,HIV/AIDS confirmatory laboratories and HIV/AIDS screening laboratories. All of them are accredited by the health authorities,and each class of laboratories take charge of their function strictly according to the "National Management of HIV/AIDS Detection (2006)". A complete quality assurance and quality control system for HIV/AIDS testing has been developed,which includes technical training,strict laboratory monitoring and approval,examination or proficiency testing on HIV/AIDS detection,and quality evaluation and supervision of HIV/AIDS diagnostic kits. Besides conduct the routine anti-HIV antibody test,more and more laboratories began to conduct other tests,such as CD4+ T lymphocyte cell counting,HIV viral load,HIV DNA PCR,genotyping,drug resistance,and HIV-1 recent infection test. The primary challenges faced by the HIV/AIDS testing laboratory network are in the areas of laboratory management and quality control. For example,the provincial PT program is inefficient,the internal quality control is conducted perfunctorily,personnel training can not met the needs of the workplace,which need to be improved.展开更多
基金MOH Program on Applied Research in the Prevention and Treatment of AIDS (WA 2003-17)
文摘This paper describes the development and challenge of HIV/AIDS testing laboratory network and quality assurance system in China. At present,the HIV/AIDS testing laboratories includes three classes,the National AIDS Reference Laboratory,HIV/AIDS confirmatory laboratories and HIV/AIDS screening laboratories. All of them are accredited by the health authorities,and each class of laboratories take charge of their function strictly according to the "National Management of HIV/AIDS Detection (2006)". A complete quality assurance and quality control system for HIV/AIDS testing has been developed,which includes technical training,strict laboratory monitoring and approval,examination or proficiency testing on HIV/AIDS detection,and quality evaluation and supervision of HIV/AIDS diagnostic kits. Besides conduct the routine anti-HIV antibody test,more and more laboratories began to conduct other tests,such as CD4+ T lymphocyte cell counting,HIV viral load,HIV DNA PCR,genotyping,drug resistance,and HIV-1 recent infection test. The primary challenges faced by the HIV/AIDS testing laboratory network are in the areas of laboratory management and quality control. For example,the provincial PT program is inefficient,the internal quality control is conducted perfunctorily,personnel training can not met the needs of the workplace,which need to be improved.