在营站前高架拆除技术与交通组织安全分析 被引量:1
1
作者 司法强 梁肖栋 +3 位作者 黄沛林 陈勇 管宁 陈华 《城市建筑》 2021年第33期20-23,共4页
运营中的航站楼站前高架的拆除工作会对交通运输产生较大的影响。本文研究案例以对交通运输影响最小为前提,通过拆除前制定合理的拆除及交通导改方案,并对预定方案进行交通压力测试,成功地实现了杭州萧山国际机场T2航站楼站前高架的拆... 运营中的航站楼站前高架的拆除工作会对交通运输产生较大的影响。本文研究案例以对交通运输影响最小为前提,通过拆除前制定合理的拆除及交通导改方案,并对预定方案进行交通压力测试,成功地实现了杭州萧山国际机场T2航站楼站前高架的拆除工作。本次不停航高架的成功拆除,对其他不停航拆除工程具有良好的借鉴意义。 展开更多
关键词 高架桥拆除 改扩建工程 交通导改 安全分析
下载PDF
Key technologies of precision demolition blasting of ultra-long urban viaduct in complicated surroundings 被引量:1
2
作者 Xie Xianqi Jia Yongsheng +3 位作者 Yao Yingkang Sun Jinshan Wu Xinxia Liu Changbang 《Engineering Sciences》 EI 2014年第6期71-79,共9页
The key technologies of precision blasting were put forward based on the characteristics of urban via- duct blasting demolition in complicated surroundings. Initial bending instability mechanics model of reinforcing s... The key technologies of precision blasting were put forward based on the characteristics of urban via- duct blasting demolition in complicated surroundings. Initial bending instability mechanics model of reinforcing steel bar frame of blasting fragmented pier and sequenced collapsed dynamic model were established for quanti- tative blasting design. Technologies of water pressure blasting were applied in multi-cell box girder fragmenta- tion. The detonating network of non-electric duplication crossover was adopted for the safety and reliability of ultra-long delay. The rationality of blasting scheme and parameters were validated by physical model test. Harm- ful effects were forecasted and controlled by integrated protective technologies. Specialization, cooperation, pre- cision, execution (SCPE) project management method was put forward for precision management. The key tech- nologies of precision demolition blasting can provide reference for similar proiects. 展开更多
关键词 VIADUCT blasting demolition precision blasting instability model detonating network harmfuleffects control