期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
高水流速及深水裸岩条件下钢栈桥及钢平台施工技术 被引量:6
1
作者 刘仁圣 《国防交通工程与技术》 2019年第4期66-69,80,共5页
在浅、无覆盖层裸岩区的水库区施工钢栈桥和钢平台,需要考虑倾斜岩面影响、钢管桩打入深度以及插打钢管桩时底端易屈曲而导致钢管桩承载能力不足等不利因素。结合新建兴国至泉州铁路六角宫中桥施工,介绍采用钻孔平台两侧支栈桥合并、加... 在浅、无覆盖层裸岩区的水库区施工钢栈桥和钢平台,需要考虑倾斜岩面影响、钢管桩打入深度以及插打钢管桩时底端易屈曲而导致钢管桩承载能力不足等不利因素。结合新建兴国至泉州铁路六角宫中桥施工,介绍采用钻孔平台两侧支栈桥合并、加大栈桥纵梁强度以及钢管桩采用扩大基础及双支墩锚固等具体措施,确保了钢栈桥及平台满足受力及施工要求。施工效果良好,可供同类工程借鉴。 展开更多
关键词 钢栈桥 钢平台 深水区 高水流速 裸岩
下载PDF
Ultrasonic method for measuring water holdup of low velocity and high-water-cut oil-water two-phase flow 被引量:2
2
作者 赵安 韩云峰 +2 位作者 任英玉 翟路生 金宁德 《Applied Geophysics》 SCIE CSCD 2016年第1期179-193,222,共16页
Oil reservoirs with low permeability and porosity that are in the middle and late exploitation periods in China's onshore oil fields are mostly in the high-water-cut production stage.This stage is associated with sev... Oil reservoirs with low permeability and porosity that are in the middle and late exploitation periods in China's onshore oil fields are mostly in the high-water-cut production stage.This stage is associated with severely non-uniform local-velocity flow profiles and dispersed-phase concentration(of oil droplets) in oil-water two-phase flow,which makes it difficult to measure water holdup in oil wells.In this study,we use an ultrasonic method based on a transmission-type sensor in oil-water two-phase flow to measure water holdup in lowvelocity and high water-cut conditions.First,we optimize the excitation frequency of the ultrasonic sensor by calculating the sensitivity of the ultrasonic field using the finite element method for multiphysics coupling.Then we calculate the change trend of sound pressure level attenuation ratio with the increase in oil holdup to verify the feasibility of the employed diameter for the ultrasonic sensor.Based on the results,we then investigate the effects of oildroplet diameter and distribution on the ultrasonic field.To further understand the measurement characteristics of the ultrasonic sensor,we perform a flow loop test on vertical upward oilwater two-phase flow and measure the responses of the optimized ultrasonic sensor.The results show that the ultrasonic sensor yields poor resolution for a dispersed oil slug in water flow(D OS/W flow),but the resolution is favorable for dispersed oil in water flow(D O/W flow) and very fine dispersed oil in water flow(VFD O/W flow).This research demonstrates the potential application of a pulsed-transmission ultrasonic method for measuring the fraction of individual components in oil-water two-phase flow with a low mixture velocity and high water cut. 展开更多
关键词 Oil-water two-phase flow low mixture velocity high water cut ultrasonic sensor water holdup
下载PDF
Methodology for production logging in oil-in-water flows under low flow rate and high water-cut conditions 被引量:2
3
作者 Wang Da-Yang Jin Ning-De +2 位作者 Zhai Lu-Sheng Ren Ying-Yu He Yuan-Sheng 《Applied Geophysics》 SCIE CSCD 2019年第3期302-313,395,共13页
This study aimed to obtain the production profiles of oil-in-water flow under low flow rate and high water-cut conditions in oil wells.A combination production profile logging composed of an arc-type conductance senso... This study aimed to obtain the production profiles of oil-in-water flow under low flow rate and high water-cut conditions in oil wells.A combination production profile logging composed of an arc-type conductance sensor(ATCS)and a cross-correlation flow meter(CFM)with a center body is proposed and experimentally evaluated.The ATCS is designed for water holdup measurement,whereas the CFM with a center body is proposed to obtain the mixture velocity.Then,a drift-flux model based on flow patterns is established to predict the individual-phase superficial velocity of oil-in-water flows.Results show that the ATCS possesses high resolution in water holdup measurement and that flow pattern information can be deduced from its signal through nonlinear time series analysis.The CFM can enhance the correlation of upstream and downstream signals and simplify the relationship between the cross-correlation velocity and mixture velocity.On the basis of the drift-flux model,individual-phase superficial velocities can be predicted with high accuracy for different flow patterns. 展开更多
关键词 oil-in-water flows low flow rate high water-cut conductance sensor flow meter measurement model
下载PDF
In situ experimental study on TBM excavation with high-pressure water-jet-assisted rock breaking 被引量:9
4
作者 ZHANG Jin-liang YANG Feng-wei +2 位作者 CAO Zhi-guo XIA Yi-min LI Yong-chang 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第12期4066-4077,共12页
China’s first high-pressure hydraulically coupled rock-breaking tunnel boring machine(TBM) was designed to overcome the rock breaking problems of TBM in super-hard rock geology, where high-pressure water jet system i... China’s first high-pressure hydraulically coupled rock-breaking tunnel boring machine(TBM) was designed to overcome the rock breaking problems of TBM in super-hard rock geology, where high-pressure water jet system is configured, including high-flow pump sets, high-pressure rotary joint and high-pressure water jet injection device. In order to investigate the rock breaking performance of high-pressure water-jet-assisted TBM, in situ excavation tests were carried out at the Wan’anxi Water Diversion Project in Longyan, Fujian Province, China, under different water jet pressure and rotational speed. The rock-breaking performance of TBM was analyzed including penetration, cutterhead load, advance rate and field penetration index. The test results show that the adoption of high-pressure water-jet-assisted rock breaking technology can improve the boreability of rock mass, where the TBM penetration increases by 64% under the water jet pressure of 270 MPa. In addition, with the increase of the water jet pressure, the TBM penetration increases and the field penetration index decreases. The auxiliary rock-breaking effect of high-pressure water jet decreases with the increase of cutterhead rotational speed. In the case of the in situ tunneling test parameters of this study, the advance rate is the maximum when the pressure of the high-pressure water jet is 270 MPa and the cutterhead rotational speed is 6 r/min. The technical superiority of high-pressure water-jet-assisted rock breaking technology is highlighted and it provides guidance for the excavation parameter selection of high-pressure hydraulically coupled rock-breaking TBM. 展开更多
关键词 tunnel boring machine high-pressure water jet PENETRATION advance rate field penetration index
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部