期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
高温高压热采井口结构设计 被引量:3
1
作者 刘智 孙爽 《胜利油田职工大学学报》 2007年第2期68-69,共2页
热采技术近年采得到了很大发展,从普通热采发展到今天的亚临界热采,所注蒸汽已接近临界点,温度是370℃,压力是24.7MPa。注蒸汽所用的井口,必须具有承受该温度和压力的能力,为此,研制了高温高压井口。该井口常温下,耐压35MPa;在370℃下... 热采技术近年采得到了很大发展,从普通热采发展到今天的亚临界热采,所注蒸汽已接近临界点,温度是370℃,压力是24.7MPa。注蒸汽所用的井口,必须具有承受该温度和压力的能力,为此,研制了高温高压井口。该井口常温下,耐压35MPa;在370℃下,耐压24.7MPa,它与普通的热采井口相比,在选材和结构上都有改进,连接强度高,密封可靠,并且符合API 6A的要求,完全能够满足亚临界注汽的工艺要求。 展开更多
关键词 稠油 亚临界热采 高温高压井口 现场应用
下载PDF
Reasons resulting in the collapsed tubing near wellhead in high pressure and high temperature deep well during well testing and measures to prevent the collapsing
2
作者 CHEN Mian JIANG Xue-hai 《Journal of Energy and Power Engineering》 2009年第9期41-44,66,共5页
Because various reasons, the tubing near wellhead was collapsed during well testing in high pressure and high temperature deep well when the outer pressure was less than collapsing strength. To find the reasons in the... Because various reasons, the tubing near wellhead was collapsed during well testing in high pressure and high temperature deep well when the outer pressure was less than collapsing strength. To find the reasons in the abnormally collapse and countermeasures, first the quality of the tubing was checked. It was founded that the collapse was not resulted from the defect of the tubing. Then, force and stress exerted in the tubing was analyzed taking XS2 well as an example. The analysis results were concluded as follows. The collapsing strength of tubing decreased due to the axial tensile, which is seriously at the upper tubing especially. During injecting, the additional axial force that was caused by the temperature effect increased the tubing near wellhead to suffer axial tensile and further reduced the collapsing strength of tubing near wellhead. Reinforcing defect, prohibiting defect tubing to trip in hole, according to the calculation to impose appropriate annular pressure, selecting size nozzle to reverse pumping and controlling the reverse pumping speed and pressure, prohibiting to be opened flow and reducing or releasing the annular pressure can prevent the well testing tubing down-hole being collapsed at the wellhead. 展开更多
关键词 high pressure and high temperature deep well well testing: tubing COLLAPSE analysis
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部