The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track ...The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track slab and bridge structure.In order to study the impact of the interface crack on the dynamic response of CRTSⅢballastless track system on bridge,based on the principle of multi-body dynamics theory and ANSYS+SIMPACK co-simulation,the spatial model of vehicle-track-bridge integration considering the longitudinal stiffness of supports,the track structure and interlayer contact characteristics were established.The dynamic characteristics of the system under different conditions of the width,length and position of the interface crack were analysed,and the limited values of the length and width of the cracks at the track slab edge were proposed.The results show that when the self-compacting concrete does not completely void along the transverse direction of the track slab,the crack has little effect on the dynamic characteristics of the vehicle-track-bridge system.However,when the self-compacting concrete is completely hollowed out along the transverse direction of the track slab,the dynamic amplitudes of the system increase.When the crack length is 1.6 m,the wheel load reduction rate reaches 0.769,which exceeds the limit value and threatens the safety of train operation.The vertical acceleration of the track slab increases by 250.1%,which affects the service life of the track system under the train speed of 200 km/h.展开更多
Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requir...Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.展开更多
The non-stationary behavior, caused by the train rmverrent, is the rmin factor for the variation of high speed railway channel. To measure the tirce-variant effect, the parameter of stationarity interval, in which the...The non-stationary behavior, caused by the train rmverrent, is the rmin factor for the variation of high speed railway channel. To measure the tirce-variant effect, the parameter of stationarity interval, in which the channel keeps constant or has no great change, is adopted based on Zhengzfiou- Xi'an (Zhengxi) passenger dedicated line measurement with different train speeds. The stationarity interval is calculated through the definition of Local Region of Stationarity (LRS) under three train ve- locities. Furthermore, the time non-stationary characteristic of high speed pared with five standard railway channel is corn- Multiple-Input MultipleOutput (MIMO) channel models, i.e. Spatial Channel Model (SCM), extended version of SCM (SCME), Wireless World Initiative New Radio Phase II (WINNERII), International Mobile Teleconmnications-Advanced (IMT-Advanced) and WiMAX models which contain the high speed moving scenario. The stationarity interval of real channel is 9 ms in 80% of the cases, which is shorter than those of the standard models. Hence the real channel of high speed railway changes more rapidly. The stationarity intervals of standard models are different due to different modeling methods and scenario def- initions. And the compared results are instructive for wireless system design in high speed railway.展开更多
A new approach was proposed to describe settlement behavior of an unsaturated soil with subgrade filling for high-speed railway. Firstly, based on Terzaghi consolidation theory, equations considering the variation coe...A new approach was proposed to describe settlement behavior of an unsaturated soil with subgrade filling for high-speed railway. Firstly, based on Terzaghi consolidation theory, equations considering the variation coefficient of consolidation with void ratio and saturation for consolidation of an unsaturated soil under stage continuous loading were derived, and according to analytical solutions of equations, a formula for settlement computation under stage continuous loading was obtained. Then, combined with the width-to-height ratio of subgrade to compute ground reaction, and by means of in-situ plate loading curves, a correctional approach was presented for the analysis of nonlinear settlement of foundation. Also, the comparison between calculated and measured loadsettlement behavior for an unsaturated soil in Qingdao-Ji'nan high-speed railway was given to demonstrate the effectiveness and accuracy of the proposed approach. It can be noted that the presented solution can be used to predict the settlement of an unsaturated soil foundation under stage continuous loading in engineering design.展开更多
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi...Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.展开更多
A section of the Nanliang high speed railway tunnel on Shijiazhuang-Taiyuan high-speed passenger railway line in China was instrumented and studied for its mechanical properties and performances. The cross section for...A section of the Nanliang high speed railway tunnel on Shijiazhuang-Taiyuan high-speed passenger railway line in China was instrumented and studied for its mechanical properties and performances. The cross section for the tunnel was300 m2and is classified as the largest cross section for railway tunnels in China. Through in situ experimental studies, mechanistic properties of the tunnel were identified, including the surrounding rock pressure, convergences along tunnel perimeter and safety of primary support and lining structure.Based on the field measured data, the surrounding rock pressure demand for large-span deep tunnel in hard rock is recommended as double peak type in the vertical direction and fold line type was recommended for horizontal pressure. The results suggested that Promojiyfakonov's theory was most close to the monitored value. Specific recommendations were also generated for the use of bolts in tunnel structures.Numerical simulation was used to evaluate the safety of the tunnel and it confirmed that the current design can satisfy the requirement of the current code.展开更多
Ten years of ground temperature data(2003–2013) indicate that the long-term thermal regimes within embankments of the Qinghai-Tibet Railway(QTR) vary significantly with different embankment structures. Obvious asymme...Ten years of ground temperature data(2003–2013) indicate that the long-term thermal regimes within embankments of the Qinghai-Tibet Railway(QTR) vary significantly with different embankment structures. Obvious asymmetries exist in the ground temperature fields within the traditional embankment(TE) and the crushed-rock basement embankment(CRBE). Measurements indicate that the TE and CRBE are not conducive to maintaining thermal stability. In contrast, the ground temperature fields of both the crushed-rock sloped embankment(CRSE) and the U-shaped crushed-rock embankment(UCRE) were symmetrical. However, the UCRE gave better thermal stability than the CRSE because slow warming of deep permafrost was observed under the CRSE. Therefore, the UCRE has the best long-term effect of decreasing ground temperature and improving the symmetry of the temperature field. More generally, it is concluded that construction using the cooling-roadbed principle meets the design requirements for long-term stability of the railway and for train transport speeds of 100 km h?1. However, temperature differences between the two shoulders, which exist in all embankments shoulders, may cause potential uneven settlement and might require maintenance.展开更多
China railways track structure II (CRTS II) slab ballastless track on bridge is one kind of track structures unique to China. Its main bearing component of longitudinal force is the continuous base plate rather than ...China railways track structure II (CRTS II) slab ballastless track on bridge is one kind of track structures unique to China. Its main bearing component of longitudinal force is the continuous base plate rather than rail. And the track-bridge interaction is weakened by the sliding layer installed between base plate and bridge deck. In order to study the dynamic response of CRTS II slab ballastless track on bridge under seismic action, a 3D nonlinear dynamic model for simply-supported bridges and CRTS II track was established, which considered structures such as steel rail, fasteners, track plate, mortar layer, base plate, sliding layer, bridge, consolidation, anchors, stoppers, etc. Then its force and deformation features under different intensities of seismic excitation were studied. As revealed, the seismic response of the system increases with the increase of seismic intensity. The peak stresses of rail, track plate and base plate all occur at the abutment or anchors. Both track plate and base plate are about to crack. Besides, the rapid relative displacement between base plate and bridge deck due to the small friction coefficient of sliding layer is beneficial to improve the seismic performance of the system. During the earthquake, a large vertical displacement appears in base plate which leads to frequent collisions between stoppers and base plate, as a result, stoppers may be damaged.展开更多
基金Project(2017YFB1201204)supported by National Key R&D Program of China。
文摘The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track slab and bridge structure.In order to study the impact of the interface crack on the dynamic response of CRTSⅢballastless track system on bridge,based on the principle of multi-body dynamics theory and ANSYS+SIMPACK co-simulation,the spatial model of vehicle-track-bridge integration considering the longitudinal stiffness of supports,the track structure and interlayer contact characteristics were established.The dynamic characteristics of the system under different conditions of the width,length and position of the interface crack were analysed,and the limited values of the length and width of the cracks at the track slab edge were proposed.The results show that when the self-compacting concrete does not completely void along the transverse direction of the track slab,the crack has little effect on the dynamic characteristics of the vehicle-track-bridge system.However,when the self-compacting concrete is completely hollowed out along the transverse direction of the track slab,the dynamic amplitudes of the system increase.When the crack length is 1.6 m,the wheel load reduction rate reaches 0.769,which exceeds the limit value and threatens the safety of train operation.The vertical acceleration of the track slab increases by 250.1%,which affects the service life of the track system under the train speed of 200 km/h.
文摘Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.
基金Acknowledgements This work was supported partially by the Beijing Natural Science Foundation under Crant No. 4112048 the Program for New Century Excellent Talents in University under Gant No. NCET-09-0206+4 种基金 the National Natural Science Foundation of China under Crant No. 60830001 the Key Project of State Key Laboratory of Rail Traffic Control and Safety under Crants No. RCS2008ZZ006, No. RCS2011ZZ008 the Program for Changjiang Scholars and Innovative Research Team in University under Crant No. IRT0949 the Project of State Key kab. of Rail Traffic Control and Safety under C~ants No. RCS2008ZT005, No. RCS2010ZT012 the Fundamental Research Funds for the Central Universities under Crants No. 2010JBZ(~8, No. 2011YJS010.
文摘The non-stationary behavior, caused by the train rmverrent, is the rmin factor for the variation of high speed railway channel. To measure the tirce-variant effect, the parameter of stationarity interval, in which the channel keeps constant or has no great change, is adopted based on Zhengzfiou- Xi'an (Zhengxi) passenger dedicated line measurement with different train speeds. The stationarity interval is calculated through the definition of Local Region of Stationarity (LRS) under three train ve- locities. Furthermore, the time non-stationary characteristic of high speed pared with five standard railway channel is corn- Multiple-Input MultipleOutput (MIMO) channel models, i.e. Spatial Channel Model (SCM), extended version of SCM (SCME), Wireless World Initiative New Radio Phase II (WINNERII), International Mobile Teleconmnications-Advanced (IMT-Advanced) and WiMAX models which contain the high speed moving scenario. The stationarity interval of real channel is 9 ms in 80% of the cases, which is shorter than those of the standard models. Hence the real channel of high speed railway changes more rapidly. The stationarity intervals of standard models are different due to different modeling methods and scenario def- initions. And the compared results are instructive for wireless system design in high speed railway.
基金Project(2010G003-F)supported by the Research and Development Program for Technology of the Chinese Ministry of Railway
文摘A new approach was proposed to describe settlement behavior of an unsaturated soil with subgrade filling for high-speed railway. Firstly, based on Terzaghi consolidation theory, equations considering the variation coefficient of consolidation with void ratio and saturation for consolidation of an unsaturated soil under stage continuous loading were derived, and according to analytical solutions of equations, a formula for settlement computation under stage continuous loading was obtained. Then, combined with the width-to-height ratio of subgrade to compute ground reaction, and by means of in-situ plate loading curves, a correctional approach was presented for the analysis of nonlinear settlement of foundation. Also, the comparison between calculated and measured loadsettlement behavior for an unsaturated soil in Qingdao-Ji'nan high-speed railway was given to demonstrate the effectiveness and accuracy of the proposed approach. It can be noted that the presented solution can be used to predict the settlement of an unsaturated soil foundation under stage continuous loading in engineering design.
文摘Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.
基金sponsored by projects (Grant Nos. 50978172, 51078318) of the National Natural Science Foundation of ChinaProject (Grant No. 10-0667) supposed by the New Century Excellent Talents in University
文摘A section of the Nanliang high speed railway tunnel on Shijiazhuang-Taiyuan high-speed passenger railway line in China was instrumented and studied for its mechanical properties and performances. The cross section for the tunnel was300 m2and is classified as the largest cross section for railway tunnels in China. Through in situ experimental studies, mechanistic properties of the tunnel were identified, including the surrounding rock pressure, convergences along tunnel perimeter and safety of primary support and lining structure.Based on the field measured data, the surrounding rock pressure demand for large-span deep tunnel in hard rock is recommended as double peak type in the vertical direction and fold line type was recommended for horizontal pressure. The results suggested that Promojiyfakonov's theory was most close to the monitored value. Specific recommendations were also generated for the use of bolts in tunnel structures.Numerical simulation was used to evaluate the safety of the tunnel and it confirmed that the current design can satisfy the requirement of the current code.
基金supported by the National Basic Research Program of China(Grant No.2012CB026101)the Western Project Program of the Chinese Academy of Sciences(Grant No.KZCX2-XB3-19)+1 种基金the Foundation for Innovative Research Groups of the National Natural Science Foundation of China(Grant No.41121061)the National Sci-Tech Support Plan(Grant No.2014BAG05B05)
文摘Ten years of ground temperature data(2003–2013) indicate that the long-term thermal regimes within embankments of the Qinghai-Tibet Railway(QTR) vary significantly with different embankment structures. Obvious asymmetries exist in the ground temperature fields within the traditional embankment(TE) and the crushed-rock basement embankment(CRBE). Measurements indicate that the TE and CRBE are not conducive to maintaining thermal stability. In contrast, the ground temperature fields of both the crushed-rock sloped embankment(CRSE) and the U-shaped crushed-rock embankment(UCRE) were symmetrical. However, the UCRE gave better thermal stability than the CRSE because slow warming of deep permafrost was observed under the CRSE. Therefore, the UCRE has the best long-term effect of decreasing ground temperature and improving the symmetry of the temperature field. More generally, it is concluded that construction using the cooling-roadbed principle meets the design requirements for long-term stability of the railway and for train transport speeds of 100 km h?1. However, temperature differences between the two shoulders, which exist in all embankments shoulders, may cause potential uneven settlement and might require maintenance.
基金supported by the National Natural Science Foundation of China (Grant No. 51608542)Project of Science and Technology Research and Development Program of China Railway Corporation (Grant No.2015G001-G)
文摘China railways track structure II (CRTS II) slab ballastless track on bridge is one kind of track structures unique to China. Its main bearing component of longitudinal force is the continuous base plate rather than rail. And the track-bridge interaction is weakened by the sliding layer installed between base plate and bridge deck. In order to study the dynamic response of CRTS II slab ballastless track on bridge under seismic action, a 3D nonlinear dynamic model for simply-supported bridges and CRTS II track was established, which considered structures such as steel rail, fasteners, track plate, mortar layer, base plate, sliding layer, bridge, consolidation, anchors, stoppers, etc. Then its force and deformation features under different intensities of seismic excitation were studied. As revealed, the seismic response of the system increases with the increase of seismic intensity. The peak stresses of rail, track plate and base plate all occur at the abutment or anchors. Both track plate and base plate are about to crack. Besides, the rapid relative displacement between base plate and bridge deck due to the small friction coefficient of sliding layer is beneficial to improve the seismic performance of the system. During the earthquake, a large vertical displacement appears in base plate which leads to frequent collisions between stoppers and base plate, as a result, stoppers may be damaged.