期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
世界优秀女子青少年竞走运动员高速区间技术模式的构建分析
1
作者 王洪军 《中国校外教育》 2019年第25期9-9,11,共2页
竞走这项运动,随着时间的推移已经不像最初的默默无闻。对于我们国家来说,优秀的女子竞走已经取得了多次十分良好的成绩,这是值得我们骄傲的。然而,对于这些来说,背后优秀竞走运动员的技术模式分析是更加值得深思的地方。而本研究就是... 竞走这项运动,随着时间的推移已经不像最初的默默无闻。对于我们国家来说,优秀的女子竞走已经取得了多次十分良好的成绩,这是值得我们骄傲的。然而,对于这些来说,背后优秀竞走运动员的技术模式分析是更加值得深思的地方。而本研究就是个人对于这些技术模式的看法与分析,旨在为世界优秀女子青少年竞走运动员高速区间技术模式的构建提供理论参考。 展开更多
关键词 优秀女子竞走运动员 青少年竞走 高速区间
下载PDF
汽车离合器壳体压铸工艺优化及冷隔缺陷控制 被引量:1
2
作者 王飞 郭兆坤 陈朝辉 《金属加工(热加工)》 2017年第19期12-13,共2页
冷隔是压铸生产中的常见缺陷,严重影响产品的力学性能,故而从工艺上改善产品冷隔缺陷意义重大。以我公司的15410-YDC压铸离合器壳体为例,通过改善模具温度场、高速区间和高速速度,消除了冷隔缺陷,为类似产品压铸质量提升提供借鉴。
关键词 冷隔 温度场 高速区间 高速速度
下载PDF
Calculation method for station carrying capacity of high-speed railway based on station blocking time method
3
作者 Li Xiaojuan Han Baoming +1 位作者 Yan Zhenying Yang Yang 《Journal of Southeast University(English Edition)》 EI CAS 2019年第4期491-501,共11页
A station carrying capacity calculation method based on the station blocking time method is proposed.According to the station track circuit groups,signal system and station topological structure,the station blocks are... A station carrying capacity calculation method based on the station blocking time method is proposed.According to the station track circuit groups,signal system and station topological structure,the station blocks are divided and the division principle is proposed.Then the train routes model is built based on the station blocking time method.The calculation methods of the train arrival headway and departure headway at the station are redefined.The optimal capacity calculation model and algorithm based on a given train operation plan are studied by analyzing the optimal operation sequence of trains with different train speeds and operation types.With the case study of Jinan West Railway Station of Beijing-Shanghai high-speed railway in China,the minimum arrival headway between two trains with the speeds of 300 and 250 km/h can be reduced to 3.0 and 2.7 min,respectively.The maximum calculation results of the calculation methods can be increased from 13 train/h to 16 train/h.This method can increase the number of trains within a period of time in a station while meeting the transport organization and passenger service requirements. 展开更多
关键词 high-speed railway station block carrying capacity HEADWAY train routes
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部