Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th...Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.展开更多
The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensiona...The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.展开更多
This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ent...This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ential settlement. Based on the study of ballastless track additional load and of vehicle, track, and bridge dynamic responses under different differential settlements, a control standard of differential settlement during operation is proposed preliminarily.展开更多
A new approach was proposed to describe settlement behavior of an unsaturated soil with subgrade filling for high-speed railway. Firstly, based on Terzaghi consolidation theory, equations considering the variation coe...A new approach was proposed to describe settlement behavior of an unsaturated soil with subgrade filling for high-speed railway. Firstly, based on Terzaghi consolidation theory, equations considering the variation coefficient of consolidation with void ratio and saturation for consolidation of an unsaturated soil under stage continuous loading were derived, and according to analytical solutions of equations, a formula for settlement computation under stage continuous loading was obtained. Then, combined with the width-to-height ratio of subgrade to compute ground reaction, and by means of in-situ plate loading curves, a correctional approach was presented for the analysis of nonlinear settlement of foundation. Also, the comparison between calculated and measured loadsettlement behavior for an unsaturated soil in Qingdao-Ji'nan high-speed railway was given to demonstrate the effectiveness and accuracy of the proposed approach. It can be noted that the presented solution can be used to predict the settlement of an unsaturated soil foundation under stage continuous loading in engineering design.展开更多
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi...Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.展开更多
基金Projects(2009G008-B,2010G018-E-3) supported by Key Projects of China Railway Ministry Science and Technology Research and Development ProgramProject(CX2013B076) supported by Hunan Provincial Innovation Foundation For Postgraduate,China
文摘Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.
基金Project(2012QNZT050)supported by the Special Fund for Basic Scientific Research of Central Colleges,ChinaProjects(51208518,U1361204,51208519,51108464)supported by the National Natural Science Foundation of China+1 种基金Project supported by the Postdoctoral Foundation of Central South University,ChinaProjects(2013RS4030,2012RS4002)sponsored by Hunan Postdoctoral Scientific Program,China
文摘The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.
基金supported by the National Nature Science Foundation of China (U1234206 and 61503311)+4 种基金support under the Railways Technology Development Plan of China Railway Corporation (2016X008-J)the Fundamental Research Funds for the Central Universities (2682015CX039)supported by the National United Engineering Laboratory of Integrated and Intelligent Transportation
文摘This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ential settlement. Based on the study of ballastless track additional load and of vehicle, track, and bridge dynamic responses under different differential settlements, a control standard of differential settlement during operation is proposed preliminarily.
基金Project(2010G003-F)supported by the Research and Development Program for Technology of the Chinese Ministry of Railway
文摘A new approach was proposed to describe settlement behavior of an unsaturated soil with subgrade filling for high-speed railway. Firstly, based on Terzaghi consolidation theory, equations considering the variation coefficient of consolidation with void ratio and saturation for consolidation of an unsaturated soil under stage continuous loading were derived, and according to analytical solutions of equations, a formula for settlement computation under stage continuous loading was obtained. Then, combined with the width-to-height ratio of subgrade to compute ground reaction, and by means of in-situ plate loading curves, a correctional approach was presented for the analysis of nonlinear settlement of foundation. Also, the comparison between calculated and measured loadsettlement behavior for an unsaturated soil in Qingdao-Ji'nan high-speed railway was given to demonstrate the effectiveness and accuracy of the proposed approach. It can be noted that the presented solution can be used to predict the settlement of an unsaturated soil foundation under stage continuous loading in engineering design.
文摘Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.