A multi-objective optimization model considering both reliability and maintenance cost is proposed to solve the contradiction between reliability and maintenance cost in high-speed railway catenary system maintenance ...A multi-objective optimization model considering both reliability and maintenance cost is proposed to solve the contradiction between reliability and maintenance cost in high-speed railway catenary system maintenance activities.The non-dominated sorting genetic algorithm 2(NSGA2)is applied to multi-objective optimization,and the optimization result is a set of Pareto solutions.Firstly,multistate failure mode analysis is conducted for the main devices leading to the failure of catenary,and then the reliability and failure mode of the whole catenary system is analyzed.The mathematical relationship between system reliability and maintenance cost is derived considering the existing catenary preventive maintenance mode to improve the reliability of the system.Secondly,an improved NSGA2(INSGA2)is proposed,which strengths population diversity by improving selection operator,and introduces local search strategy to ensure that population distribution is more uniform.The comparison results of the two algorithms before and after improvement on the zero-ductility transition(ZDT)series functions show that the population diversity is better and the solution is more uniform using INSGA2.Finally,the INSGA2 is applied to multi-objective optimization of system reliability and maintenance cost in different maintenance periods.The decision-makers can choose the reasonable solutions as the maintenance plans in the optimization results by weighing the relationship between the system reliability and the maintenance cost.The selected maintenance plans can ensure the lowest maintenance cost while the system reliability is as high as possible.展开更多
The fatigue load spectrum and operation life evaluation of key components in the catenary system under the high speed train running condition were investigated.Firstly,based on the catenary model and pantograph model,...The fatigue load spectrum and operation life evaluation of key components in the catenary system under the high speed train running condition were investigated.Firstly,based on the catenary model and pantograph model,the couple dynamic equations of pantograph–catenary were built with the Lagrange’s method;then the dynamic contact force was obtained by the Newmark method at the train speeds of 250,280 and 300 km/h,respectively.Secondly,the finite element model(FEM)of one anchor section’s catenary was built to analyze its transient response under the contact force as train running;then the loading time history of messenger wire base,steady arm,registration tube,oblique cantilever,and straight cantilever were extracted.Finally,the key components’fatigue spectrum was carried out by the rain-flow counting method,and operation life was estimated in consideration of such coefficients,such as stress concentration,shape and dimension,surface treatment.The results show that the fatigue life of the catenary system reduces with the increasing of train speed;specifically,the evaluated fatigue life of the steady arm is shorter than other components.展开更多
Based on the discrete time method, an effective movement control model is designed for a group of high- speed trains on a rail network. The purpose of the model is to investigate the specific traffic characteristics o...Based on the discrete time method, an effective movement control model is designed for a group of high- speed trains on a rail network. The purpose of the model is to investigate the specific traffic characteristics of high-speed trains under the interruption of stochastic irregular events. In the model, the high-speed rail traffic system is supposed to be equipped with the moving-block signalling system to guarantee maximum traversing capacity of the railway. To keep the safety of trains' movements, some operational strategies are proposed to control the movements of trains in the model, including traction operation, braking operation, and entering-station operation. The numerical simulations show that the designed model can well describe the movements of high-speed trains on the rail network. The research results can provide the useful information not only for investigating the propagation features of relevant delays under the irregular disturbance but also for rerouting and reseheduling trains on the rail network.展开更多
In order to consider the influence of steel pole on the measurement of wind speed sensors and determinate the installation position of wind speed sensors, the flow field around wind speed sensors was investigated. Bas...In order to consider the influence of steel pole on the measurement of wind speed sensors and determinate the installation position of wind speed sensors, the flow field around wind speed sensors was investigated. Based on the three-dimensional steady Reynolds-averaged Navier-Stokes equations and k-ε double equations turbulent model, the field flow around the wind speed sensor and the steel pole along a high-speed railway was simulated on an unstructured grid. The grid-independent validation was conducted and the accuracy of the present numerical simulation method was validated by experiments and simulations carried out by previous researchers. Results show that the steel pole has a significant influence on the measurement results of wind speed sensors. As the distance between two wind speed sensors is varied from 0.3 to 1.0 m, the impact angles are less than ±20°, it is proposed that the distance between two wind speed sensors is 0.8 m at least, and the interval between wind speed sensors and the steel pole is more than 1.0 m with the sensors located on the upstream side.展开更多
文摘A multi-objective optimization model considering both reliability and maintenance cost is proposed to solve the contradiction between reliability and maintenance cost in high-speed railway catenary system maintenance activities.The non-dominated sorting genetic algorithm 2(NSGA2)is applied to multi-objective optimization,and the optimization result is a set of Pareto solutions.Firstly,multistate failure mode analysis is conducted for the main devices leading to the failure of catenary,and then the reliability and failure mode of the whole catenary system is analyzed.The mathematical relationship between system reliability and maintenance cost is derived considering the existing catenary preventive maintenance mode to improve the reliability of the system.Secondly,an improved NSGA2(INSGA2)is proposed,which strengths population diversity by improving selection operator,and introduces local search strategy to ensure that population distribution is more uniform.The comparison results of the two algorithms before and after improvement on the zero-ductility transition(ZDT)series functions show that the population diversity is better and the solution is more uniform using INSGA2.Finally,the INSGA2 is applied to multi-objective optimization of system reliability and maintenance cost in different maintenance periods.The decision-makers can choose the reasonable solutions as the maintenance plans in the optimization results by weighing the relationship between the system reliability and the maintenance cost.The selected maintenance plans can ensure the lowest maintenance cost while the system reliability is as high as possible.
基金Project(51175383)supported by the National Natural Science Foundation of China(NSF)
文摘The fatigue load spectrum and operation life evaluation of key components in the catenary system under the high speed train running condition were investigated.Firstly,based on the catenary model and pantograph model,the couple dynamic equations of pantograph–catenary were built with the Lagrange’s method;then the dynamic contact force was obtained by the Newmark method at the train speeds of 250,280 and 300 km/h,respectively.Secondly,the finite element model(FEM)of one anchor section’s catenary was built to analyze its transient response under the contact force as train running;then the loading time history of messenger wire base,steady arm,registration tube,oblique cantilever,and straight cantilever were extracted.Finally,the key components’fatigue spectrum was carried out by the rain-flow counting method,and operation life was estimated in consideration of such coefficients,such as stress concentration,shape and dimension,surface treatment.The results show that the fatigue life of the catenary system reduces with the increasing of train speed;specifically,the evaluated fatigue life of the steady arm is shorter than other components.
基金Supported by the National Natural Science Foundation of China under Grant No. 70901006Research Foundation of Beijing Jiaotong University under Grant Nos. 2011JBM158, 2011JBM162Research Foundation of State Key Laboratory of Rail Traffic Control and Safety under Grant Nos. RCS2009ZT001, RCS2010ZZ001
文摘Based on the discrete time method, an effective movement control model is designed for a group of high- speed trains on a rail network. The purpose of the model is to investigate the specific traffic characteristics of high-speed trains under the interruption of stochastic irregular events. In the model, the high-speed rail traffic system is supposed to be equipped with the moving-block signalling system to guarantee maximum traversing capacity of the railway. To keep the safety of trains' movements, some operational strategies are proposed to control the movements of trains in the model, including traction operation, braking operation, and entering-station operation. The numerical simulations show that the designed model can well describe the movements of high-speed trains on the rail network. The research results can provide the useful information not only for investigating the propagation features of relevant delays under the irregular disturbance but also for rerouting and reseheduling trains on the rail network.
基金Projects(U1334205,51205418)supported by the National Natural Science Foundation of ChinaProject(2014T002-A)supported by the Science and Technology Research Program of China Railway CorporationProject(132014)supported by the Fok Ying Tong Education Foundation of China
文摘In order to consider the influence of steel pole on the measurement of wind speed sensors and determinate the installation position of wind speed sensors, the flow field around wind speed sensors was investigated. Based on the three-dimensional steady Reynolds-averaged Navier-Stokes equations and k-ε double equations turbulent model, the field flow around the wind speed sensor and the steel pole along a high-speed railway was simulated on an unstructured grid. The grid-independent validation was conducted and the accuracy of the present numerical simulation method was validated by experiments and simulations carried out by previous researchers. Results show that the steel pole has a significant influence on the measurement results of wind speed sensors. As the distance between two wind speed sensors is varied from 0.3 to 1.0 m, the impact angles are less than ±20°, it is proposed that the distance between two wind speed sensors is 0.8 m at least, and the interval between wind speed sensors and the steel pole is more than 1.0 m with the sensors located on the upstream side.