期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
黄河河口河床响应河口延伸的调整极限及其机制 被引量:1
1
作者 师长兴 《泥沙研究》 CSCD 北大核心 2004年第6期51-56,共6页
在三角洲建造过程中河口不断延伸 ,黄河口河道相应发生调整。分析观测资料发现 ,河床可调整要素宽深比、比降、河床质组成的调整都存在一个极限值 ,并在河口河道行水晚期的淤积中保持基本不变。研究认为河床质调整极限是由来沙组成及河... 在三角洲建造过程中河口不断延伸 ,黄河口河道相应发生调整。分析观测资料发现 ,河床可调整要素宽深比、比降、河床质组成的调整都存在一个极限值 ,并在河口河道行水晚期的淤积中保持基本不变。研究认为河床质调整极限是由来沙组成及河床质细化机制决定的。但是 ,河槽的宽深比不能进一步减小 ,以保持在更小比降下的输沙平衡 ,并非宽深比所对应的河槽形态已是所谓最大输沙形态 ,而是由于大流量过程和小流量过程不能适应对方所塑造的河槽形态 ,相互破坏对方塑造的窄深河槽。所以出现了虽然断面缩窄可加大输沙力 ,而河槽却不向这个方向调整 ,这样一个表面上违背自然规律的现象。解决这对矛盾对河口河道治理有着重要意义。 展开更多
关键词 黄河口河道 河床调整 宽深比 比降 河床质组成 曲率
下载PDF
Effect of Water and Sediment Regulation on Lower Yellow River 被引量:2
2
作者 徐国宾 司春棣 《Transactions of Tianjin University》 EI CAS 2009年第2期113-120,共8页
According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in ... According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in the river mouth area,the adjustment of river regime,the effect of river regulation projects and changes of flowing capacity of the channel are analyzed.It is revealed that the water and sediment regulation is efficient to reduce deposition and improve the flowing capacity and the conditions of sediment transport. 展开更多
关键词 Yellow River water and sediment regulation river control sediment transport
下载PDF
Response of the distributary channel of the Huanghe River estuary to water and sediment discharge regulation in 2007
3
作者 马妍妍 李广雪 +6 位作者 叶思源 张志恒 赵广明 李景阳 周春艳 丁文洁 杨欣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2010年第6期1362-1370,共9页
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments ... The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment". 展开更多
关键词 Huanghe (Yellow) River estuary water and sediment regulation river channel adjustment wetland.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部