The research selected three typical areas for plant investigation, including upper reaches of Gangnan Reservoir, the area between Gangnan and downstream of Huangbizhuang Reservoir, and Huangbizhuang Reservoir. The res...The research selected three typical areas for plant investigation, including upper reaches of Gangnan Reservoir, the area between Gangnan and downstream of Huangbizhuang Reservoir, and Huangbizhuang Reservoir. The results showed that affected by water, plant species, species diversity and species richness were all decreasing in varying degrees as the distance with watercourse upper reaches was increasing, but the ratio of Anthropochory plants was growing. The research finally proposed countermeasures, including increasing wetland area, constructing forests and artificial water landscape of Hutuo River and reinforcing watercourse compre- hensive management.展开更多
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments ...The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".展开更多
The planning Yalong-River water transfer project will transfer 5.65 billion cubic meters water from the Yalong River into the Yellow River per year.The Yalong River will be dramatically impacted hydrologically and eco...The planning Yalong-River water transfer project will transfer 5.65 billion cubic meters water from the Yalong River into the Yellow River per year.The Yalong River will be dramatically impacted hydrologically and ecologically because more than 60% of the runoff will be diverted.An ecohydrological model was used to evaluate the impacts of the project on river corridor and wetland in this study.Schizothorax is a typical plateau river species and was used as the indicator species for assessment of the impact of water transfer project.The model simulated the habitat area of Schizothorax in the reach between the Reba Dam and the Ganzi Hydrology Station on the Yalong River.The Reba Dam,A'an Dam and Renda Dam will be constructed in the Yalong River for enhancing the water level for water diversion into the Yellow River.The velocity,channel width,runoff,and water depth will be reduced due to the water transfer,especially during flood season.The reduction in the velocity,channel width,runoff and water depth will occur mainly in the reach near the three dams and the reduction will be reduced to a minimum level in a distance about 100 km downstream of the dams.The maximum net water loss of Kasha Lake is only 1197200 m3,only 0.3% of runoff flowing into the lake.The project cannot bring adverse effect on the lake.The habitat area of Schizothorax in the Yalong River might be reduced if the water was transferred from the Reba Dam.The habitat area of this species will be reduced more than 40%.展开更多
基金Supported by Hebei Provincial Natural Science Foundation(D2012302007)Science and Technology Project of Hebei Academy of Sciences(14111)~~
文摘The research selected three typical areas for plant investigation, including upper reaches of Gangnan Reservoir, the area between Gangnan and downstream of Huangbizhuang Reservoir, and Huangbizhuang Reservoir. The results showed that affected by water, plant species, species diversity and species richness were all decreasing in varying degrees as the distance with watercourse upper reaches was increasing, but the ratio of Anthropochory plants was growing. The research finally proposed countermeasures, including increasing wetland area, constructing forests and artificial water landscape of Hutuo River and reinforcing watercourse compre- hensive management.
基金Supported by National Key Basic Research Program of China (No. 2005CB422304)National Natural Science Foundation of China (No.40872167)
文摘The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".
基金supported by the National Natural Science Foundation of China (Grant Nos. 51027006,51109224)the National Key Basic Research Program of China ("973" Program) (Grant No. 2010CB951102)the National Key Project of Scientific and Technical Supporting Program (Grant No. 2006BAB04A08)
文摘The planning Yalong-River water transfer project will transfer 5.65 billion cubic meters water from the Yalong River into the Yellow River per year.The Yalong River will be dramatically impacted hydrologically and ecologically because more than 60% of the runoff will be diverted.An ecohydrological model was used to evaluate the impacts of the project on river corridor and wetland in this study.Schizothorax is a typical plateau river species and was used as the indicator species for assessment of the impact of water transfer project.The model simulated the habitat area of Schizothorax in the reach between the Reba Dam and the Ganzi Hydrology Station on the Yalong River.The Reba Dam,A'an Dam and Renda Dam will be constructed in the Yalong River for enhancing the water level for water diversion into the Yellow River.The velocity,channel width,runoff,and water depth will be reduced due to the water transfer,especially during flood season.The reduction in the velocity,channel width,runoff and water depth will occur mainly in the reach near the three dams and the reduction will be reduced to a minimum level in a distance about 100 km downstream of the dams.The maximum net water loss of Kasha Lake is only 1197200 m3,only 0.3% of runoff flowing into the lake.The project cannot bring adverse effect on the lake.The habitat area of Schizothorax in the Yalong River might be reduced if the water was transferred from the Reba Dam.The habitat area of this species will be reduced more than 40%.