期刊文献+
共找到146,928篇文章
< 1 2 250 >
每页显示 20 50 100
Contractor-Related Factors and Performance of Bridge Construction Projects Implemented by Kenya National Highways Authority (KeNHA) Kenya
1
作者 Joan Anyika Otike Charles Kabubo Victoria Okumu 《Open Journal of Civil Engineering》 2024年第2期214-224,共11页
The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This stu... The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects. 展开更多
关键词 Staff Factors Management Factors Performance Bridge projects KeNHA
下载PDF
Multi-Criteria Wildfire Risk Hazard Assessment in GIS Environment: Projection for the Future and Impact on RES Projects Installation Planning
2
作者 Aggelos Pallikarakis Flora Konstantopoulou 《Journal of Geoscience and Environment Protection》 2024年第5期242-265,共24页
It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is M... It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is Mediterranean, due to the unique combination of its type of vegetation and demanding climatic conditions. This research is focused on the Region of Epirus in Greece, an area with significant natural vegetation and a range of geomorphological aspects. In order to estimate the Wildfire Risk Hazard, several factors have been used: geomorphological (slope, aspect, elevation, TWI, Hydrographic network), social (Settlements and landfils, roads, overhead lines and substations), environmental (land cover) and climatic (Fire Weather Index). Through a multi-criteria decision analysis (MCDA) and an analytic hierarchy process (AHP) in a GIS environment, the Wildfire Risk Hazard has been estimated not only for current conditions but also for future projections for the near future (2031-2060) and the far future (2071-2100). The selected case study includes the potential impact of the Wildfires to the installed (or targeted to be installed) RES projects in the studied region. 展开更多
关键词 RES projects Greece Epirus Analytic Hierarchy Process Multi-Criteria Decision Analysis
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
3
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Trust beyond Technology Algorithms: A Theoretical Exploration of Consumer Trust and Behavior in Technological Consumption and AI Projects
4
作者 David Oyekunle Ugochukwu Okwudili Matthew +1 位作者 David Preston David Boohene 《Journal of Computer and Communications》 2024年第6期72-102,共31页
In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing custome... In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing customer trust in AI systems through a mixed-methods approach, blending quantitative analysis with qualitative insights to create a comprehensive conceptual framework. Quantitatively, the study analyzes responses from 1248 participants using structural equation modeling (SEM), exploring interactions between technological factors like perceived usefulness and transparency, psychological factors including perceived risk and domain expertise, and organizational factors such as leadership support and ethical accountability. The results confirm the model, showing significant impacts of these factors on consumer trust and AI adoption attitudes. Qualitatively, the study includes 35 semi-structured interviews and five case studies, providing deeper insight into the dynamics shaping trust. Key themes identified include the necessity of explainability, domain competence, corporate culture, and stakeholder engagement in fostering trust. The qualitative findings complement the quantitative data, highlighting the complex interplay between technology capabilities, human perceptions, and organizational practices in establishing trust in AI. By integrating these findings, the study proposes a novel conceptual model that elucidates how various elements collectively influence consumer trust in AI. This model not only advances theoretical understanding but also offers practical implications for businesses and policymakers. The research contributes to the discourse on trust creation and decision-making in technology, emphasizing the need for interdisciplinary efforts to address societal challenges associated with technological advancements. It lays the groundwork for future research, including longitudinal, cross-cultural, and industry-specific studies, to further explore consumer trust in AI. 展开更多
关键词 Consumer Trust AI-Driven projects TRANSPARENCY Ethical Accountability Structural Equation Modeling (SEM) Technology Acceptance Model (TAM) Interdisciplinary Study Organizational Factors Psychological Factors Behavioral Intention
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
5
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation Installation engineering Engineering projects Safety management
下载PDF
国家战略目标导向的科研:“863”计划与“973”计划
6
作者 韩晋芳 《今日科苑》 2024年第1期70-77,共8页
通过对国家战略目标导向下的两个国家重大科技计划——“863”计划和“973”计划的深度解读分析,从任务提出背景、组织管理机制、效益与影响三方面揭示国家战略目标导向下科研工作组织的理念和运行机制,分析了政府、市场和专家在服务国... 通过对国家战略目标导向下的两个国家重大科技计划——“863”计划和“973”计划的深度解读分析,从任务提出背景、组织管理机制、效益与影响三方面揭示国家战略目标导向下科研工作组织的理念和运行机制,分析了政府、市场和专家在服务国家战略目标的科研活动中所扮演的角色,以及自由探索与国家目标之间的关系,并以此启发未来科技举国体制的实施。 展开更多
关键词 国家科技计划 “863”计划 973”计划
下载PDF
Impact of estuarine reclamation projects on saltwater intrusion and freshwater resource 被引量:1
7
作者 Hanghang LU Jianrong ZHU +3 位作者 Qing CHEN Ming LI Shunqi PAN Shenliang CHEN 《Journal of Oceanology and Limnology》 SCIE CAS CSCD 2023年第1期38-56,共19页
Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been impleme... Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been implemented in the Changjiang River estuary in recent years:the Xincun Shoal reclamation project(RP-XCS),the Qingcao Shoal reclamation project(RP-QCS),the Eastern Hengsha Shoal reclamation project(RP-EHS),and the Nanhui Shoal reclamation project(RP-NHS).The effects of the four reclamation projects and each project on the saltwater intrusion and water resources in the Changjiang River estuary were simulated in a 3D numerical model.Results show that for a multichannel estuary,local reclamation projects change the local topography and water diversion ratio(WDR)between channels and influence water and salt transport and freshwater utilization in the estuary.During spring tide,under the cumulative effect of the four reclamation projects,the salinity decreases by approximately 0.5in the upper reaches of the North Branch and increases by 0.5-1.0 in the middle and lower reaches of the North Branch.In the North Channel,the salinity decreases by approximately 0.5.In the North Passage,the salinity increases by 0.5-1.0.In the South Passage,the salinity increases by approximately 0.5 in the upper reaches and decreases by 0.2-0.5 on the north side of the middle and lower reaches.During neap tide,the cumulative effects of the four reclamation projects and the individual projects are similar to those during spring tide,but there are some differences.The effects of an individual reclamation project on WDR and saltwater intrusion during spring and neap tides are simulated and analyzed in detail.The cumulative effect of the four reclamation projects favors freshwater usage in the Changjiang River estuary. 展开更多
关键词 reclamation projects saltwater intrusion freshwater resources numerical model Changjiang River estuary
下载PDF
HSPM:A Better Model to Effectively Preventing Open-Source Projects from Dying
8
作者 Zhifang Liao Fangying Fu +3 位作者 Yiqi Zhao Sui Tan Zhiwu Yu Yan Zhang 《Computer Systems Science & Engineering》 SCIE EI 2023年第10期431-452,共22页
With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS pr... With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS project network,namely an Open-Source Software ECOsystem(OSSECO).Unfortunately,not all OS projects in the open-source ecosystem can be healthy and stable in the long term,and more projects will go from active to inactive and gradually die.In a tightly connected ecosystem,the death of one project can potentially cause the collapse of the entire ecosystem network.How can we effectively prevent such situations from happening?In this paper,we first identify the basic project characteristics that affect the survival of OS projects at both project and ecosystem levels through the proportional hazards model.Then,we utilize graph convolutional networks based on the ecosystem network to extract the ecosystem environment characteristics of OS projects.Finally,we fuse basic project characteristics and environmental project characteristics and construct a Hybrid Structured Prediction Model(HSPM)to predict the OS project survival state.The experimental results show that HSPM significantly improved compared to the traditional prediction model.Our work can substantially assist OS project managers in maintaining their projects’health.It can also provide an essential reference for developers when choosing the right open-source project for their production activities. 展开更多
关键词 project survival prediction open-source ecosystem open-source project open-source health graph neural networks
下载PDF
人工智能背景下Materials Project数据库在计算材料学课程教学中的应用
9
作者 胡学敏 孙孪鸿 +1 位作者 陈晓玉 叶原丰 《科教文汇》 2024年第10期90-94,共5页
该文探讨了在人工智能背景下,Materials Project数据库在计算材料学课程教学中的应用和影响。Materials Project数据库是一个集成了AI和大数据技术的开放获取的材料库,能为学生提供海量的材料晶体结构和物性数据,使教学内容更为丰富,让... 该文探讨了在人工智能背景下,Materials Project数据库在计算材料学课程教学中的应用和影响。Materials Project数据库是一个集成了AI和大数据技术的开放获取的材料库,能为学生提供海量的材料晶体结构和物性数据,使教学内容更为丰富,让学生能通过亲自操作获取和分析数据,深入理解微观结构与物性之间的关系。这一新兴的教学模式不仅提升了学生的科研能力和创新思维能力,还有助于培养具备计算材料专业知识和多学科交叉的复合型人才。总体来说,人工智能时代下,大数据的引入为计算材料学课程带来新的活力,并对未来教育改革和实践产生了积极影响。 展开更多
关键词 人工智能 Materials project数据库 计算材料学教学
下载PDF
Transcriptional regulation in the development and dysfunction of neocortical projection neurons 被引量:1
10
作者 Ningxin Wang Rong Wan Ke Tang 《Neural Regeneration Research》 SCIE CAS CSCD 2024年第2期246-254,共9页
Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord... Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord.Appropriate development of cortical projection neurons is regulated by certain essential events such as neural fate determination,proliferation,specification,differentiation,migration,survival,axonogenesis,and synaptogenesis.These processes are precisely regulated in a tempo-spatial manner by intrinsic factors,extrinsic signals,and neural activities.The generation of correct subtypes and precise connections of projection neurons is imperative not only to support the basic cortical functions(such as sensory information integration,motor coordination,and cognition)but also to prevent the onset and progression of neurodevelopmental disorders(such as intellectual disability,autism spectrum disorders,anxiety,and depression).This review mainly focuses on the recent progress of transcriptional regulations on the development and diversity of neocortical projection neurons and the clinical relevance of the failure of transcriptional modulations. 展开更多
关键词 autism spectrum disorders COGNITION differentiation excitatory circuits intellectual disability NEOCORTEX neurodevelopmental disorders projection neuron specification transcriptional regulation
下载PDF
Developing Projects with Low-code Combined with ChatGPT
11
作者 Wei Xiong Bing Li +1 位作者 Zhao Wu Bo Hang 《计算机教育》 2023年第12期204-213,共10页
This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time... This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time by increasing modeling time.However,as code tools become more advanced,it is challenging to improve efficiency because models are abstract while implementations are concrete.This paper proposes a novel approach that integrates ChatGPT as a plug-in into the whole R&D process and combines it with our code generation tool to enhance R&D efficiency.We have developed some demos to demonstrate the effectiveness of our approach.According to our evaluation,our approach can save more than 90%of the work in implementing the code generation tool,leaving only about 10%of the work for code review,code improvement,and unit testing. 展开更多
关键词 ChatGPT Low-code Code generation Software engineering project development
下载PDF
Correlations between the Global Earth Healing and Global Consciousness Projects—Brain-Mind-Matter-Interactions through Physical Noise Generators
12
作者 Marcus Schmieke 《Natural Science》 2023年第5期191-198,共8页
Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in ... Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in order to infuse positive affirmations into the global consciousness. As mentioned in the original study design, it was intended to use the GCP as a reference for the effectiveness of its activities. The data of the GEHP consisting of 21 events from 2013 to 2020 is analyzed and statistically compared to the data of the GCP. An astonishing synchronicity was observed, which suggests an interaction between the brain states of the observers and the physical noise generators of the GCP. 展开更多
关键词 Global Consciousness project Global Consciousness Information Field Coherence PEAR Lab Quantum Entanglement Decline Effect
下载PDF
Perception-Based Assessment of the Factors Causing Delays in Construction Projects
13
作者 Om Prakash Giri 《Engineering(科研)》 2023年第7期431-445,共15页
Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders... Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders. To address this problem, this study aimed to identify and analyze the significant factors that contribute to construction project delays in Nepal. To gather data, a well-structured questionnaire was developed and administered to a sample of 100 participants, including contractors, consultants, and civil engineers. Various statistical tests were conducted to ensure the data’s integrity and consistency, such as reliability assessments and factor analyses. The findings of the study highlighted multiple factors contributing to delays in construction projects such as inadequate design, poor communication, and coordination among stakeholders, insufficient experience and planning by contractors, delays in material delivery and testing, labor-related problems including shortages and low qualifications, and external factors like regulatory changes and unforeseen circumstances. By identifying these major causes of construction project delays, this study presented insightful information that can contribute to the analysis and evaluation of project performance. 展开更多
关键词 Construction projects Construction Industry Delay Causes Construction De-lays project Performance
下载PDF
Application of Anti-seepage Technology in the Construction of Hydraulic Engineering Projects
14
作者 Huanlin YANG 《Meteorological and Environmental Research》 CAS 2023年第5期31-32,35,共3页
With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construc... With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed. 展开更多
关键词 Anti-seepage technology Hydraulic engineering projects Application strategy
下载PDF
Diagnosis of indirectly driven double shell targets with point-projection hard x-ray radiography
15
作者 Chao Tian Minghai Yu +17 位作者 Lianqiang Shan Fengjuan Wu Bi Bi Qiangqiang Zhang Yuchi Wu Tiankui Zhang Feng Zhang Dongxiao Liu Weiwu Wang Zongqiang Yuan Siqian Yang Lei Yang Zhigang Deng Jian Teng Weimin Zhou Zongqing Zhao Yuqiu Gu Baohan Zhang 《Matter and Radiation at Extremes》 SCIE EI CSCD 2024年第2期50-62,共13页
We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on t... We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on the upgraded SG-II laser facility. Then, based on thepoint-projection hard x-ray radiography technique, time-resolved radiography of the double shell targets, including that of their near-peakcompression, were obtained. The backlighter source was created by the interactions of a high-intensity short pulsed laser with a metalmicrowire target. Images of the target near peak compression were obtained with an Au microwire. In addition, radiation hydrodynamicsimulations were performed, and the target evolution obtained agrees well with the experimental results. Using the radiographic images, arealdensities of the targets were evaluated. 展开更多
关键词 double projectION POINT
下载PDF
Accelerated Primal-Dual Projection Neurodynamic Approach With Time Scaling for Linear and Set Constrained Convex Optimization Problems
16
作者 You Zhao Xing He +1 位作者 Mingliang Zhou Tingwen Huang 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2024年第6期1485-1498,共14页
The Nesterov accelerated dynamical approach serves as an essential tool for addressing convex optimization problems with accelerated convergence rates.Most previous studies in this field have primarily concentrated on... The Nesterov accelerated dynamical approach serves as an essential tool for addressing convex optimization problems with accelerated convergence rates.Most previous studies in this field have primarily concentrated on unconstrained smooth con-vex optimization problems.In this paper,on the basis of primal-dual dynamical approach,Nesterov accelerated dynamical approach,projection operator and directional gradient,we present two accelerated primal-dual projection neurodynamic approaches with time scaling to address convex optimization problems with smooth and nonsmooth objective functions subject to linear and set constraints,which consist of a second-order ODE(ordinary differential equation)or differential conclusion system for the primal variables and a first-order ODE for the dual vari-ables.By satisfying specific conditions for time scaling,we demonstrate that the proposed approaches have a faster conver-gence rate.This only requires assuming convexity of the objective function.We validate the effectiveness of our proposed two accel-erated primal-dual projection neurodynamic approaches through numerical experiments. 展开更多
关键词 Accelerated projection neurodynamic approach lin-ear and set constraints projection operators smooth and nonsmooth convex optimization time scaling.
下载PDF
New Projects[2022.1—2023.7]
17
《造纸信息》 2023年第9期101-104,共4页
On January 2^(nd),2022,the PM2 paper machine of Guanyun Limin Renewable Resource Technology Development Co.,Ltd.was successfully put into operation,with a width of 5,200 mm and a design speed of 700 m/min.The annual p... On January 2^(nd),2022,the PM2 paper machine of Guanyun Limin Renewable Resource Technology Development Co.,Ltd.was successfully put into operation,with a width of 5,200 mm and a design speed of 700 m/min.The annual production capacity of PM2 exceeds 200,000 tons,which uses waste paper to produce low-weight cardboard boxes. 展开更多
关键词 BOXES capacity projects
下载PDF
Evaluating the Impact of Workshop Management on the Progress of Road Construction Projects(Case Study:Road Construction Projects of Tehran Province)
18
作者 Morteza Modarresi Fatemeh Mousavi 《Journal of Management Science & Engineering Research》 2023年第1期49-59,共11页
Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to... Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important. 展开更多
关键词 Construction projects Workshop management SNOWBALL Road construction
下载PDF
Discussion on the Application of Pipe Jacking Construction Technology in Municipal Road Drainage Projects
19
作者 Liang Liu Lizhao Zhao 《Journal of Architectural Research and Development》 2023年第6期29-35,共7页
In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage co... In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction. 展开更多
关键词 Municipal roads Drainage projects Pipe jacking construction Advantages
下载PDF
Agricultural Investment Project Decisions Based on an Interactive Preference Disaggregation Model Considering Inconsistency
20
作者 Xingli Wu Huchang Liao +1 位作者 Shuxian Sun Zhengjun Wan 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第6期3125-3146,共22页
Agricultural investment project selection is a complex multi-criteria decision-making problem,as agricultural projects are easily influenced by various risk factors,and the evaluation information provided by decisionm... Agricultural investment project selection is a complex multi-criteria decision-making problem,as agricultural projects are easily influenced by various risk factors,and the evaluation information provided by decisionmakers usually involves uncertainty and inconsistency.Existing literature primarily employed direct preference elicitation methods to address such issues,necessitating a great cognitive effort on the part of decision-makers during evaluation,specifically,determining the weights of criteria.In this study,we propose an indirect preference elicitation method,known as a preference disaggregation method,to learn decision-maker preference models fromdecision examples.To enhance evaluation ease,decision-makers merely need to compare pairs of alternatives with which they are familiar,also known as reference alternatives.Probabilistic linguistic preference relations are employed to account for the presence of incomplete and uncertain information in such pairwise comparisons.To address the inconsistency among a group of decision-makers,we develop a pair of 0-1mixed integer programming models that consider both the semantics of linguistic terms and the belief degrees of decision-makers.Finally,we conduct a case study and comparative analysis.Results reveal the effectiveness of the proposed model in solving agricultural investment project selection problems with uncertain and inconsistent decision information. 展开更多
关键词 Multiple criteria analysis preference disaggregation INCONSISTENCY probability linguistic preference relation investment project selection
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部