UHV transmission technology is characterized with long transmission distance, large transmission capacity, low line loss and less land use. In China, SGCC had completed its 1 000 kV UHVAC pilot project by the end of 2...UHV transmission technology is characterized with long transmission distance, large transmission capacity, low line loss and less land use. In China, SGCC had completed its 1 000 kV UHVAC pilot project by the end of 2008. This paper reviews the construction of the project from the aspects of technology research and development, engineering design, equipment development, transportation and on-site construction, commissioning and operation. Since put into operation, the project has shown excellent performance till now.展开更多
为保证国家电网公司750kV示范工程1500MVA满负荷试验顺利进行,利用BPA程序计算750kV示范工程1500MVA试验方式下的系统稳定性;提出在公伯峡电厂1~5号发电机励磁系统配置电力系统稳定器(power system stabilizer,PSS)改进系统阻尼;分析...为保证国家电网公司750kV示范工程1500MVA满负荷试验顺利进行,利用BPA程序计算750kV示范工程1500MVA试验方式下的系统稳定性;提出在公伯峡电厂1~5号发电机励磁系统配置电力系统稳定器(power system stabilizer,PSS)改进系统阻尼;分析发电机自并励系统对系统稳定影响的原理以及公伯峡电厂1~5号发电机PSS参数整定试验结果,并用BPA程序重新对公伯峡电厂发电机配置PSS参数后的试验系统进行了稳定计算分析,结果表明试验系统静态稳定极限大于1800MW,为1500MVA满负荷试验提供了技术保证;最后给出了750kV示范工程1500MVA满负荷试验分析结论。展开更多
文摘UHV transmission technology is characterized with long transmission distance, large transmission capacity, low line loss and less land use. In China, SGCC had completed its 1 000 kV UHVAC pilot project by the end of 2008. This paper reviews the construction of the project from the aspects of technology research and development, engineering design, equipment development, transportation and on-site construction, commissioning and operation. Since put into operation, the project has shown excellent performance till now.
文摘为保证国家电网公司750kV示范工程1500MVA满负荷试验顺利进行,利用BPA程序计算750kV示范工程1500MVA试验方式下的系统稳定性;提出在公伯峡电厂1~5号发电机励磁系统配置电力系统稳定器(power system stabilizer,PSS)改进系统阻尼;分析发电机自并励系统对系统稳定影响的原理以及公伯峡电厂1~5号发电机PSS参数整定试验结果,并用BPA程序重新对公伯峡电厂发电机配置PSS参数后的试验系统进行了稳定计算分析,结果表明试验系统静态稳定极限大于1800MW,为1500MVA满负荷试验提供了技术保证;最后给出了750kV示范工程1500MVA满负荷试验分析结论。