BIM (building information modeling) is a technological innovation, not only during the design process, but also during the planning and preparation stages of a construction project, as it also supports making invest...BIM (building information modeling) is a technological innovation, not only during the design process, but also during the planning and preparation stages of a construction project, as it also supports making investment decisions. An innovation which is comparable, if only slightly less significant, was the transition from using 2D systems to the 3D structural model design. The article outlines the advantages of using BIM in the preparatory stages of a construction project. It also presents benefits which relate to the employment of the BIM system in cost estimation process. The article describes the Zuzia BIM system which uses the BIM model, as this system has just been created in Poland for the purpose of construction cost estimation. The preparation of the bill of quantities is automated in this system and this has been achieved on the basis of data directly obtained from virtual models of buildings, which were carried out thanks to the collaboration of various design sectors. The article authors, using their own experience, present difficulties which can be encountered by cost estimators in Poland when calculating the value of a building with the help of the BIM concept. The article shows the design errors that prevent or hinder takeoff automatic calculation based on BIM model. Design errors shown in the article are for example reinforcement bars have been defined by a designer as elements hollow in the middle or as one element for the whole building, one type of elements assigned as few different or incorrect defining of elements in relation to the type of works.展开更多
文摘BIM (building information modeling) is a technological innovation, not only during the design process, but also during the planning and preparation stages of a construction project, as it also supports making investment decisions. An innovation which is comparable, if only slightly less significant, was the transition from using 2D systems to the 3D structural model design. The article outlines the advantages of using BIM in the preparatory stages of a construction project. It also presents benefits which relate to the employment of the BIM system in cost estimation process. The article describes the Zuzia BIM system which uses the BIM model, as this system has just been created in Poland for the purpose of construction cost estimation. The preparation of the bill of quantities is automated in this system and this has been achieved on the basis of data directly obtained from virtual models of buildings, which were carried out thanks to the collaboration of various design sectors. The article authors, using their own experience, present difficulties which can be encountered by cost estimators in Poland when calculating the value of a building with the help of the BIM concept. The article shows the design errors that prevent or hinder takeoff automatic calculation based on BIM model. Design errors shown in the article are for example reinforcement bars have been defined by a designer as elements hollow in the middle or as one element for the whole building, one type of elements assigned as few different or incorrect defining of elements in relation to the type of works.