期刊文献+
共找到9篇文章
< 1 >
每页显示 20 50 100
基于改进的4D模型的可视化施工管理系统 被引量:5
1
作者 张苏 《计算机与数字工程》 2009年第4期98-101,共4页
在对当前的可视化理念和4D(4 Dimension,简称4D)模型的学习和研究后,提出了一个改进的4D模型。该模型以工程结构分解(Work Breakdown Structure,WBS)为核心,分解出不同层次的施工对象,以进度计划为主线,将进度计划和施工对象连接来反应... 在对当前的可视化理念和4D(4 Dimension,简称4D)模型的学习和研究后,提出了一个改进的4D模型。该模型以工程结构分解(Work Breakdown Structure,WBS)为核心,分解出不同层次的施工对象,以进度计划为主线,将进度计划和施工对象连接来反应施工过程的动态变化,实现施工过程的可视化模拟和管理。 展开更多
关键词 4d wbs 可视化 施工过程
下载PDF
4D Design and Simulation Technologies and Process Design Patterns to Support Lean Construction Methods 被引量:2
2
作者 Manfred Breit Manfred Vogel +2 位作者 Fritz Hubi Fabian Mrki Micheal Raps 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期179-184,共6页
The objective of this ongoing joint research program is to determine how 3D/4D modeling, simulation and visualization of Products (buildings), Organizations and Processes (POP) can support lean construction. Initial f... The objective of this ongoing joint research program is to determine how 3D/4D modeling, simulation and visualization of Products (buildings), Organizations and Processes (POP) can support lean construction. Initial findings suggest that Process Design Pattern may have the potential to intuitively support ICT based lean construction. We initiated a 'Process Archeology' in order to reveal the requirements for tools that can support the planning, simulation and control of lean construction methods. First findings show that existing tools provide only limited support and therefore, we started to develop new methodologies and technologies to overcome these shortcomings. Through the introduction of Process Design Patterns, we intent to establish process thinking in the interdisciplinary POP design. Optimized construction processes may be synthesized with semi-automatic methods by applying Process Design Patterns on building structures. By providing process templates that integrate problem solution and expert knowledge, Process Design Patterns may have the potential to ensure high quality process models. 展开更多
关键词 4d design process and organization modeling and simulation process design patterns lean construction methods
原文传递
Integration of Radio-Frequency Identification and 4D CAD in Construction Management 被引量:1
3
作者 胡文发 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期151-157,共7页
In order to increase the productivity of construction industry, emerging technologies have been constantly introduced and applied in this traditional industry by pilot researchers. This paper provides an integrated mo... In order to increase the productivity of construction industry, emerging technologies have been constantly introduced and applied in this traditional industry by pilot researchers. This paper provides an integrated model of radio-frequency identification (RFID) and four-dimensional Computer-Aided Design (4D CAD) in construction management. RFID involves the use of tags that collect data and transmit data. RFID can collect data by radio waves instead of light waves. RFID technology is surpassing barcode technology where light waves are easily blocked and barcode labels are easy to fall off or become unreadable due to dust, dirt, or other contaminants. 4D CAD which involves 3D construction models and construction schedules presents visualized construction process. Integration of RFID and 4D CAD in this paper built a dynamic construction management and control system which would reduce the time of capturing data on site and control quality of construction materials efficiently. Pilot test result shows that a construction manager can easily understand how and what a complicated construction project will be accomplished. Although further analysis is necessary, RFID and 4D CAD show promises of being a beneficial technology in construction management. 展开更多
关键词 radio frequency identification (RFID) four-dimensional computer-aided design (4d CAD) construction management construction visualization construction schedule
原文传递
Construction Management Utilizing 4D CAD and Operations Simulation Methodologies 被引量:2
4
作者 张建平 张洋 +1 位作者 胡振中 鹿明 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期241-247,共7页
The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial con... The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial condition, and the randomness of the construction process, the installation process of the steel-structure was simulated and optimized by using genetic algorithm (GA) optimization methodology. The operations simulation shortened the installation duration by 39 days (about 16% of the original total duration), guided the manufacturers to plan the construction processes, and provided specific suggestions on the entry time of the installation components, resulting in resource allocation optimization, resource saving, and construction efficiency improvement. Combining with the optimized schedule, the 4D visualization environment can discover time-space conflicts timely, and may assist project managers to reschedule the construction activities in tune with the site layout and resource allocation. 展开更多
关键词 4d computer aided design (CAD) SIMULATION visualization genetic algorithm OPTIMIZATION construction management
原文传递
Multi-Project in an Integrated BIM Model: Clash Detection and Construction Planning
5
作者 Alcínia Zita Sampaio Nuno R. Gomes +1 位作者 Augusto M. Gomes Alberto Sanchez-Lite 《Journal of Software Engineering and Applications》 2022年第10期345-358,共14页
The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the desi... The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the design context, increasing the accuracy of the project preparation and the decreasing additional costs and delays of the construction work. The main objective of the present research is to provide an overview of the state of the art of BIM applications, namely, concerning the construction planning. For that, the generation of a BIM 3D model, involving the disciplines of architecture, structures and water supply system was performed. After, over the model a conflict analysis was applied, in order to verify the consistency of all the disciplines, when linked together. In order to obtain a visual simulation of the construction process, the correspondent 4D BIM model was also generated. Along the development of the study, distinct BIM software was applied over a case study. The main remarks of the capacities of the software, as well as the benefits and limitations verified were identified. 展开更多
关键词 BIM Planning construction Conflict Analysis 4d Model Visual Simulation
下载PDF
基于OGRE的碾压混凝土坝施工过程可视化仿真系统 被引量:11
6
作者 赵春菊 胡超 周宜红 《水利水电科技进展》 CSCD 北大核心 2013年第4期41-45,共5页
构建了基于碾压混凝土坝施工过程仿真数据动态交换机制的数据库管理模式,运用面向对象的建模方式建立了系统中不同属性对象的实体模型,并采用面向对象的图形渲染引擎OGRE开发了碾压混凝土坝施工过程三维可视化系统。系统能对仿真方案的... 构建了基于碾压混凝土坝施工过程仿真数据动态交换机制的数据库管理模式,运用面向对象的建模方式建立了系统中不同属性对象的实体模型,并采用面向对象的图形渲染引擎OGRE开发了碾压混凝土坝施工过程三维可视化系统。系统能对仿真方案的调整实时响应并根据仿真结果动态展示坝体施工全过程;通过友好的人机交互功能使用户能够自由观察和查询施工详细信息。系统在某碾压混凝土坝工程中的应用表明,该系统能够提高可视化实现的效率及效果,可为工程施工方案的管理和决策提供信息化支撑。 展开更多
关键词 碾压混凝土坝 OGRE 三维可视化 施工仿真 施工过程
下载PDF
基于GIS的水电工程施工动态可视化仿真方法及其应用 被引量:14
7
作者 钟登华 刘东海 郑家祥 《水利学报》 EI CSCD 北大核心 2003年第7期101-106,共6页
提出了基于地理信息系统(GIS)的水电工程施工三维动态可视化仿真方法,包括仿真建模可视化、仿真计算过程可视化及仿真结果可视化,并以混凝土坝施工仿真为例,进行了实例研究,为制定合理的大坝施工组织计划提供了科学依据。
关键词 可视化仿真 水电工程 地理信息系统(GIS) 三维动态 混凝土坝施工
下载PDF
深基坑工程施工过程风险综合评价 被引量:36
8
作者 程鸿群 佘佳雪 +1 位作者 袁宁 彭朝晖 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2016年第3期491-498,共8页
针对当前对深基坑工程施工风险进行评价需要解决风险指标体系构建、指标权重分配和评价方法实现的问题,建立了证据理论结合区间数赋值的深基坑工程施工过程风险评价模型.依据深基坑工程的施工原理和管理过程,应用"工作分解结构-风... 针对当前对深基坑工程施工风险进行评价需要解决风险指标体系构建、指标权重分配和评价方法实现的问题,建立了证据理论结合区间数赋值的深基坑工程施工过程风险评价模型.依据深基坑工程的施工原理和管理过程,应用"工作分解结构-风险分解结构(WBS-RBS)"和"0-1"方法识别风险因素,建立深基坑工程施工过程风险评价指标体系.结合区间数理论和证据理论的优势,降低深基坑工程施工过程风险量化值的主观性,详述构建识别框架、确定可信度函数以及信息合成的方法与步骤.最后通过实例分析说明了该方法的合理性与可行性. 展开更多
关键词 深基坑工程 施工过程风险 工作分解结构-风险分解结构(wbs-RBS) 区间数 证据理论
下载PDF
基于UG三维可视化仿真的建筑施工全程虚拟 被引量:3
9
作者 李红波 王晓鸣 《建筑技术》 北大核心 2004年第11期808-810,共3页
通过探讨UG三维可视化仿真软件对建筑施工全程进行“预演仿真”和“反演仿真”的决策优化实现路径,可建立三维可视化仿真施工全程虚拟技术流程。该技术可加速提升VR技术在建筑施工项目中的应用及其程度,实现建筑施工全程虚拟和决策优化。
关键词 三维可视化仿真 建筑施工 全程虚拟 UG软件
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部