With the arrival of the 4G and 5G,the telecommunications networks have experienced a large expansion of these networks.That enabled the integration of many services and adequate flow,thus enabling the operators to res...With the arrival of the 4G and 5G,the telecommunications networks have experienced a large expansion of these networks.That enabled the integration of many services and adequate flow,thus enabling the operators to respond to the growing demand of users.This rapid evolution has given the operators to adapt,their methods to the new technologies that increase.This complexity becomes more important,when these networks include several technologies to access different from the heterogeneous network like in the 4G network.The dimensional new challenges tell the application and the considerable increase in demand for services and the compatibility with existing networks,the management of mobility intercellular of users and it offers a better quality of services.Thus,the proposed solution to meet these new requirements is the sizing of the EPC(Evolved Packet Core)core network to support the 5G access network.For the case of Orange Guinea,this involves setting up an architecture for interconnecting the core networks of Sonfonia and Camayenne.The objectives of our work are of two orders:(1)to propose these solutions and recommendations for the heart network EPC sizing and the deployment to be adopted;(2)supply and architectural interconnection in the heart network EPC and an existing heart network.In our work,the model of traffic in communication that we use to calculate the traffic generated with each technology has link in the network of the heart.展开更多
The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for ...The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.展开更多
At present, the major drawback for mobile phones is the issue of power consumption. As one of the alternatives to decrease the power consumption of standard, power-hungry location-based services usually require the kn...At present, the major drawback for mobile phones is the issue of power consumption. As one of the alternatives to decrease the power consumption of standard, power-hungry location-based services usually require the knowledge of how individual phone features consume power. A typical phone feature is that the applications related to multimedia streaming utilize more power while receiving, processing, and displaying the multimedia contents, thus contributing to the increased power consumption. There is a growing concern that current battery modules have limited capability in fulfilling the long-term energy need for the progress on the mobile phone because of increasing power consumption during multimedia streaming processes. Considering this, in this paper, we provide an offline meaning sleep-mode method to compute the minimum power consumption comparing with the power-on solution to save power by implementing energy rate adaptation(RA) mechanism based on mobile excess energy level purpose to save battery power use. Our simulation results show that our RA method preserves efficient power while achieving better throughput compared with the mechanism without rate adaptation(WRA).展开更多
As power to gas(P2 G) technology gradually matures, the coupling between electricity networks and natural gas networks should ideally evolve synergistically.With the intent of characterizing market behaviors of integr...As power to gas(P2 G) technology gradually matures, the coupling between electricity networks and natural gas networks should ideally evolve synergistically.With the intent of characterizing market behaviors of integrated electric power and natural gas networks(IPGNs)with P2 G facilities, this paper establishes a steady-state model of P2 G and constructs optimal dispatch models of an electricity network and a natural gas network separately. In addition, a concept of slack energy flow(SEF) is proposed as a tool for coordinated optimal dispatch between the two networks. To study how the market pricing mechanism affects coordinated optimal dispatch in an IPGN, a market equilibrium-solving model for an IPGN is constructed according to game theory, with a solution based on the Nikaido-Isoda function. Case studies are conducted on a joint model that combines the modified IEEE 118-node electricity network and the Belgian 20-node gas network.The results show that if the game between an electric power company and a natural gas company reaches market equilibrium, not only can both companies maximize their profits, but also the coordinated operation of the coupling units, i.e., gas turbines and P2 G facilities, will contribute more to renewable energy utilization and carbon emission reduction.展开更多
Assessing the reliability of integrated electricity and gas systems has become an important issue due to the strong dependence of these energy networks through the power-to-gas(P2G)and combined heat and power(CHP)tech...Assessing the reliability of integrated electricity and gas systems has become an important issue due to the strong dependence of these energy networks through the power-to-gas(P2G)and combined heat and power(CHP)technologies.The current work,initially,presents a detailed energy flow model for the integrated power and natural gas system in light of the P2G and CHP technologies.Considering the simultaneous load flow of networks,a contingency analysis procedure is proposed,and reliability is assessed through sequential Monte Carlo simulations.The current study examines the effect of independent and dependent operation of energy networks on the reliability of the systems.In particular,the effect of employing both P2G and CHP technologies on reliability criteria is evaluated.In addition,a series of sensitivity analysis are performed on the size and site of these technologies to investigate their effects on system reliability.The proposed method is implemented on an integrated IEEE 24-bus electrical power system and 20-node Belgian natural gas system.The simulation procedure certifies the proposed method for reliability assessment is practical and applicable.In addition,the results prove connection between energy networks through P2G and CHP technologies can improve reliability of networks if the site and size of technologies are properly determined.展开更多
随着智能电网和能源互联网的不断深入发展和推进,云计算、数据仓库、数据挖掘以及虚拟化等技术在电力行业的成熟应用,现有电网已无法满足业务的需求。软件定义网络(software defined network,SDN)作为新兴网络架构实现了控制功能和数据...随着智能电网和能源互联网的不断深入发展和推进,云计算、数据仓库、数据挖掘以及虚拟化等技术在电力行业的成熟应用,现有电网已无法满足业务的需求。软件定义网络(software defined network,SDN)作为新兴网络架构实现了控制功能和数据转发功能的解耦,是未来电力通信网络架构的选择之一。文中通过对SDN网络原理的论述,详细讨论了基于SDN的电力通信网络需要解决的关键技术,主要包括网架性能、安全性、时延、可扩展性、链路可靠性、容错性和兼容性,最后展望了软件定义网络相关技术在电力系统中的应用领域。展开更多
文摘With the arrival of the 4G and 5G,the telecommunications networks have experienced a large expansion of these networks.That enabled the integration of many services and adequate flow,thus enabling the operators to respond to the growing demand of users.This rapid evolution has given the operators to adapt,their methods to the new technologies that increase.This complexity becomes more important,when these networks include several technologies to access different from the heterogeneous network like in the 4G network.The dimensional new challenges tell the application and the considerable increase in demand for services and the compatibility with existing networks,the management of mobility intercellular of users and it offers a better quality of services.Thus,the proposed solution to meet these new requirements is the sizing of the EPC(Evolved Packet Core)core network to support the 5G access network.For the case of Orange Guinea,this involves setting up an architecture for interconnecting the core networks of Sonfonia and Camayenne.The objectives of our work are of two orders:(1)to propose these solutions and recommendations for the heart network EPC sizing and the deployment to be adopted;(2)supply and architectural interconnection in the heart network EPC and an existing heart network.In our work,the model of traffic in communication that we use to calculate the traffic generated with each technology has link in the network of the heart.
基金This work was fully supported by U Nyi Hla Nge Foundation at Yangon Technological University,Gyogone,Insein PO,11011,Yangon,Myanmar。
文摘The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.
基金supported by X-Project funded by the Ministry of Science,ICT&Future Planning under Grant No.NRF-2015R1A2A1A16074929
文摘At present, the major drawback for mobile phones is the issue of power consumption. As one of the alternatives to decrease the power consumption of standard, power-hungry location-based services usually require the knowledge of how individual phone features consume power. A typical phone feature is that the applications related to multimedia streaming utilize more power while receiving, processing, and displaying the multimedia contents, thus contributing to the increased power consumption. There is a growing concern that current battery modules have limited capability in fulfilling the long-term energy need for the progress on the mobile phone because of increasing power consumption during multimedia streaming processes. Considering this, in this paper, we provide an offline meaning sleep-mode method to compute the minimum power consumption comparing with the power-on solution to save power by implementing energy rate adaptation(RA) mechanism based on mobile excess energy level purpose to save battery power use. Our simulation results show that our RA method preserves efficient power while achieving better throughput compared with the mechanism without rate adaptation(WRA).
基金supported by the National Natural Science Foundation of China(No.51377060)the Major Consulting Program of Chinese Academy of Engineering(No.2015-ZD-09-09)
文摘As power to gas(P2 G) technology gradually matures, the coupling between electricity networks and natural gas networks should ideally evolve synergistically.With the intent of characterizing market behaviors of integrated electric power and natural gas networks(IPGNs)with P2 G facilities, this paper establishes a steady-state model of P2 G and constructs optimal dispatch models of an electricity network and a natural gas network separately. In addition, a concept of slack energy flow(SEF) is proposed as a tool for coordinated optimal dispatch between the two networks. To study how the market pricing mechanism affects coordinated optimal dispatch in an IPGN, a market equilibrium-solving model for an IPGN is constructed according to game theory, with a solution based on the Nikaido-Isoda function. Case studies are conducted on a joint model that combines the modified IEEE 118-node electricity network and the Belgian 20-node gas network.The results show that if the game between an electric power company and a natural gas company reaches market equilibrium, not only can both companies maximize their profits, but also the coordinated operation of the coupling units, i.e., gas turbines and P2 G facilities, will contribute more to renewable energy utilization and carbon emission reduction.
文摘Assessing the reliability of integrated electricity and gas systems has become an important issue due to the strong dependence of these energy networks through the power-to-gas(P2G)and combined heat and power(CHP)technologies.The current work,initially,presents a detailed energy flow model for the integrated power and natural gas system in light of the P2G and CHP technologies.Considering the simultaneous load flow of networks,a contingency analysis procedure is proposed,and reliability is assessed through sequential Monte Carlo simulations.The current study examines the effect of independent and dependent operation of energy networks on the reliability of the systems.In particular,the effect of employing both P2G and CHP technologies on reliability criteria is evaluated.In addition,a series of sensitivity analysis are performed on the size and site of these technologies to investigate their effects on system reliability.The proposed method is implemented on an integrated IEEE 24-bus electrical power system and 20-node Belgian natural gas system.The simulation procedure certifies the proposed method for reliability assessment is practical and applicable.In addition,the results prove connection between energy networks through P2G and CHP technologies can improve reliability of networks if the site and size of technologies are properly determined.
文摘随着智能电网和能源互联网的不断深入发展和推进,云计算、数据仓库、数据挖掘以及虚拟化等技术在电力行业的成熟应用,现有电网已无法满足业务的需求。软件定义网络(software defined network,SDN)作为新兴网络架构实现了控制功能和数据转发功能的解耦,是未来电力通信网络架构的选择之一。文中通过对SDN网络原理的论述,详细讨论了基于SDN的电力通信网络需要解决的关键技术,主要包括网架性能、安全性、时延、可扩展性、链路可靠性、容错性和兼容性,最后展望了软件定义网络相关技术在电力系统中的应用领域。