期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Correlation Dimension in Fault Diagnosis of 600 MW Steam Turbine Generator 被引量:2
1
作者 姚宝恒 杨霞菊 +1 位作者 佟德纯 陈兆能 《Journal of Donghua University(English Edition)》 EI CAS 2005年第1期31-36,共6页
GP algorithm of correlation dimension computation is ameliorated which overcomes the shortage of traditional one. Improved process of GP algorithm takes the influence of temporal correlative pairs of points on correla... GP algorithm of correlation dimension computation is ameliorated which overcomes the shortage of traditional one. Improved process of GP algorithm takes the influence of temporal correlative pairs of points on correlation dimension into account and promotes the computational efficiency prominently. Iterative SVD method is applied to remove the influence of noise on the result of correlation dimension. The faults of steam flow turbulence and oil film disturbance which occur in 600 MW Steam Turbine Generator are analyzed and whose correlation dimensions are computed. More distinct quantitative index than FFT is gained to distinguish two faults and it’s of little importance to apply correlation dimension to study the influence of various factors on steam flow turbulence fault for nonexistence of convergent floor in correlation integral curve, which presents a new way to learn the operational function of large capacity steam turbine generator and carry out comprehensive condition monitoring. 展开更多
关键词 correlation dimension ameliorated algorithm 600 MW steam turbine generator air turbulence oil film disturbance.
下载PDF
Analysis on the Problems in Start-up and Debugging of Two 600 MW Generating Units in Yangzhou No.2 Thermal Power Plant
2
作者 蒯狄正 《Electricity》 2001年第2期11-15,共5页
The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS ... The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS not complying with the contract target, etc. occurred during start-up and debugging of two 600 MW generating units in Yangzhou No.2 Thermal Power Plant. Through analysis on these problems. the remedial measures were put forward, to which can be referred for similar units. 展开更多
关键词 start-up and debugging problems analysis remedial measures 600 MW generating unit
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部