The AC/DC hybrid distribution network is one of the trends in distribution network development, which poses great challenges to the traditional distribution transformer. In this paper, a new topology suitable for AC/D...The AC/DC hybrid distribution network is one of the trends in distribution network development, which poses great challenges to the traditional distribution transformer. In this paper, a new topology suitable for AC/DC hybrid distribution network is put forward according to the demands of power grid, with advantages of accepting DG and DC loads, while clearing DC fault by blocking the clamping double sub-module(CDSM) of input stage. Then, this paper shows the typical structure of AC/DC distribution network that is hand in hand. Based on the new topology, this paper designs the control and modulation strategies of each stage, where the outer loop controller of input stage is emphasized for its twocontrol mode. At last, the rationality of new topology and the validity of control strategies are verified by the steady and dynamic state simulation. At the same time, the simulation results highlight the role of PET in energy regulation.展开更多
A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
Distributed photovoltaic(PV)is one of the important power sources for building a new power system with new energy as the main body.The rapid development of distributed PV has brought new challenges to the operation of...Distributed photovoltaic(PV)is one of the important power sources for building a new power system with new energy as the main body.The rapid development of distributed PV has brought new challenges to the operation of distribution networks.In order to improve the absorption ability of large-scale distributed PV access to the distribution network,the AC/DC hybrid distribution network is constructed based on flexible interconnection technology,and a coordinated scheduling strategy model of hydrogen energy storage(HS)and distributed PV is established.Firstly,the mathematical model of distributed PV and HS system is established,and a comprehensive energy storage system combining seasonal hydrogen energy storage(SHS)and battery(BT)is proposed.Then,a flexible interconnected distribution network scheduling optimization model is established to minimize the total active power loss,voltage deviation and system operating cost.Finally,simulation analysis is carried out on the improved IEEE33 node,the NSGA-II algorithm is used to solve specific examples,and the optimal scheduling results of the comprehensive economy and power quality of the distribution network are obtained.Compared with the method that does not consider HS and flexible interconnection technology,the network loss and voltage deviation of this method are lower,and the total system cost can be reduced by 3.55%,which verifies the effectiveness of the proposed method.展开更多
In this work,an Artificial Neural Network(ANN)based technique is suggested for classifying the faults which occur in hybrid power distribution systems.Power,which is generated by the solar and wind energy-based hybrid...In this work,an Artificial Neural Network(ANN)based technique is suggested for classifying the faults which occur in hybrid power distribution systems.Power,which is generated by the solar and wind energy-based hybrid system,is given to the grid at the Point of Common Coupling(PCC).A boost converter along with perturb and observe(P&O)algorithm is utilized in this system to obtain a constant link voltage.In contrast,the link voltage of the wind energy conversion system(WECS)is retained with the assistance of a Proportional Integral(PI)controller.The grid synchronization is tainted with the assis-tance of the d-q theory.For the analysis of faults like islanding,line-ground,and line-line fault,the ANN is utilized.The voltage signal is observed at the PCC,and the Discrete Wavelet Transform(DWT)is employed to obtain different features.Based on the collected features,the ANN classifies the faults in an effi-cient manner.The simulation is done in MATLAB and the results are also validated through the hardware implementation.Detailed fault analysis is carried out and the results are compared with the existing techniques.Finally,the Total harmonic distortion(THD)is lessened by 4.3%by using the proposed methodology.展开更多
China Southern Power Grid is a unique EHV AC/DC hybrid transmission network that operates in China. In its service area, the distribution of energy resources and the development of economy are extremely unbalanced, so...China Southern Power Grid is a unique EHV AC/DC hybrid transmission network that operates in China. In its service area, the distribution of energy resources and the development of economy are extremely unbalanced, so long-distance and bulk power transmission are needed; besides, the geography and climate conditions are serious, rains, fogs, lightning and typhoon as well as high temperature are common all the year round. Facing these challenges, the power grid enhanced stability control, improved the equipment and strengthen the network structure. In the future, the power grid plans to optimize the disposition of power sources and build digitalized power system.展开更多
GaN (gallium nitride) buck-rectifier has been proposed to realize high power density ISOP (input series and output parallel)-IPOS (input parallel and output series) converter-based dc distribution system. The ul...GaN (gallium nitride) buck-rectifier has been proposed to realize high power density ISOP (input series and output parallel)-IPOS (input parallel and output series) converter-based dc distribution system. The ultra-low loss bi-directional switch can be developed by the GaN power device because of the low on-resistance, the high-speed switching behavior and its own device structure. The buck-rectifier using the GaN bi-directional switches has the potential to achieve higher power density than the commonly utilized boost-rectifier. Availability of the GaN-HEMT (high electron mobility transistor) for the buck rectifier has been verified taking the theoretical limit of the on-resistance and the switching loss energy into account. Design consideration for a high power density buck-rectifier has been also conducted and the application effect of the GaN bidirectional switches has been evaluated quantitatively. The ISOP-IPOS converter-based dc (direct current) distribution system takes full advantage of the buck-rectifier and the rectifier using GaN devices contributes to realizing higher power density dc distribution system.展开更多
The increasing flexibility of active distribution systems(ADSs)coupled with the high penetration of renewable distributed generators(RDGs)leads to the increase of the complexity.It is of practical significance to achi...The increasing flexibility of active distribution systems(ADSs)coupled with the high penetration of renewable distributed generators(RDGs)leads to the increase of the complexity.It is of practical significance to achieve the largest amount of RDG penetration in ADSs and maintain the optimal operation.This study establishes an alternating current(AC)/direct current(DC)hybrid ADS model that considers the dynamic thermal rating,soft open point,and distribution network reconfiguration(DNR).Moreover,it transforms the optimal dispatching into a second-order cone programming problem.Considering the different control time scales of dispatchable resources,the following two-stage dispatching framework is proposed.d dispatch uses hourly input data with the goal(1)The day-ahea of minimizing the grid loss and RDG dropout.It obtains the optimal 24-hour schedule to determine the dispatching plans for DNR and the energy storage system.(2)The intraday dispatch uses 15-min input data for 1-hour rolling-plan dispatch but only executes the first 15 min of dispatching.To eliminate error between the actual operation and dispatching plan,the first 15 min is divided into three 5-min step-by-step executions.The goal of each step is to trace the tie-line power of the intraday rolling-plan dispatch to the greatest extent at the minimum cost.The measured data are used as feedback input for the rolling-plan dispatch after each step is executed.A case study shows that the comprehensive cooperative ADS model can release the line capacity,reduce losses,and improve the penetration rate of RDGs.Further,the two-stage dispatching framework can handle source-load fluctuations and enhance system stability.展开更多
In a hybrid AC/DC medium voltage distribution network, distributed generations(DGs), energy storage systems(ESSs), and the voltage source converters(VSCs)between AC and DC lines, have the ability to regulate node volt...In a hybrid AC/DC medium voltage distribution network, distributed generations(DGs), energy storage systems(ESSs), and the voltage source converters(VSCs)between AC and DC lines, have the ability to regulate node voltages in real-time. However, the voltage regulation abilities of above devices are limited by their ratings. And the voltage regulation efficiencies of these devices are also different. Besides, due to high r/x ratio, node voltages are influenced by both real and reactive power. In order to achieve the coordinated voltage regulation in a hybrid AC/DC distribution network, a priority-based real-time control strategy is proposed based on the voltage control effect of real and reactive power adjustment. The equivalence of real and reactive power adjustment on voltage control is considered in control area partition optimization, in which regulation efficiency and capability are taken as objectives.In order to accommodate more DGs, the coordination of controllable devices is achieved according to voltage sensitivities. Simulations studies are performed to verify the proposed method.展开更多
The two main challenges of medium voltage direct current(MVDC)distribution network are the flexible control of power flow(PF)and fault protection.In this paper,the power flow controller(PFC)is introduced to regulate t...The two main challenges of medium voltage direct current(MVDC)distribution network are the flexible control of power flow(PF)and fault protection.In this paper,the power flow controller(PFC)is introduced to regulate the PF and inhibit the fault current during the DC fault.The coordination strategy of series-parallel PFC(SP-PFC)and hybrid DC circuit breaker(DCCB)is proposed.By regulating the polarity and magnitude of SP-PFC output voltage during the fault,the rising speed of fault current can be suppressed so as to reduce the breaking current of hybrid DCCB.The access mode of SP-PFC to the MVDC distribution network and its topology are analyzed,and the coordination strategy between SP-PFC and hybrid DCCB is investigated.Moreover,the emergency control and bypass control strategies of SP-PFC are developed.On this basis,the mathematical model of SP-PFC in different fault stages is derived.With the equivalent model of SP-PFC,the fault current of the MVDC distribution network can be calculated accurately.A simulation model of the MVDC distribution network containing SP-PFC is established in MATLAB/Simulink.The fault current calculation result is compared with the simulation result,and the effectiveness of the proposed coordination strategy is verified.展开更多
The concept of a flexible power electronics substation(FPES)was first applied in the Zhangbei DC distribution network demonstration project.As a multi-port power electronics transformer(PET)with different AC and DC vo...The concept of a flexible power electronics substation(FPES)was first applied in the Zhangbei DC distribution network demonstration project.As a multi-port power electronics transformer(PET)with different AC and DC voltage levels,the FPES has adopted a novel topology integrating modular multilevel converter(MMC)and four-winding medium frequency transformer(FWMFT)based multiport DC-DC converter,which can significantly reduce capacitance in each sub-module(SM)of a MMC and also save space and cost.In this paper,in order to accelerate speed of electromagnetic transient(EMT)simulations of FPES based hybrid AC/DC distribution systems,an averaged-value model(AVM)is proposed for efficient and accurate representation of FPES.Assume that all SM capacitor voltages are perfectly balanced in the MMC,then the MMC behavior can be modeled using controlled voltage sources based on modulation voltages from control systems.In terms of the averaged current transfer characteristics among the windings of the FWMFT,we consider that all multiport DC-DC converters are controlled with the same dynamics,a lumped averaged model using controlled current and voltage sources has been developed for these four-port DC-DC converters connected to the upper or lower arms of the MMC.The presented FPES AVM model has been tested and validated by comparison with a detailed IGBT-based EMT model.Results show that the AVM is significantly more efficient while maintaining its accuracy in an EMT simulation.展开更多
The upscaling requirements of energy transition highlight the urgent need for ramping up renewables and boosting system efficiencies.However,the stochastic nature of excessive renewable energy resources has challenged...The upscaling requirements of energy transition highlight the urgent need for ramping up renewables and boosting system efficiencies.However,the stochastic nature of excessive renewable energy resources has challenged stable and efficient operation of the power system.Battery energy storage systems(BESSs)have been identified as critical to mitigate random fluctuations,unnecessary green energy curtailment and load shedding with rapid response and flexible connection.On the other hand,an AC/DC hybrid distribution system can offer merged benefits in both AC and DC subsystems without additional losses during AC/DC power conversion.Therefore,configuring BESSs on an AC/DC distribution system is wellpositioned to meet challenges brought by carbon reductions in an efficient way.A bi-level optimization model of BESS capacity allocation for AC/DC hybrid distribution systems,considering the flexibility of voltage source converters(VSCs)and power conversion systems(PCSs),has been established in this paper to address the techno-economic issues that hindered wide implementation.The large-scale nonlinear programming problem has been solved utilizing a genetic algorithm combined with second-order cone programming.Rationality and effectiveness of the model have been verified by setting different scenarios through case studies.Simulation results have demonstrated the coordinated operation of BESS and AC/DC hybrid systems can effectively suppress voltage fluctuations and improve the cost-benefit of BESSs from a life cycle angle.展开更多
基金supported by National Key Research and Development Program of China (2016YFB0900500,2017YFB0903100)the State Grid Science and Technology Project (SGRI-DL-F1-51-011)
文摘The AC/DC hybrid distribution network is one of the trends in distribution network development, which poses great challenges to the traditional distribution transformer. In this paper, a new topology suitable for AC/DC hybrid distribution network is put forward according to the demands of power grid, with advantages of accepting DG and DC loads, while clearing DC fault by blocking the clamping double sub-module(CDSM) of input stage. Then, this paper shows the typical structure of AC/DC distribution network that is hand in hand. Based on the new topology, this paper designs the control and modulation strategies of each stage, where the outer loop controller of input stage is emphasized for its twocontrol mode. At last, the rationality of new topology and the validity of control strategies are verified by the steady and dynamic state simulation. At the same time, the simulation results highlight the role of PET in energy regulation.
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
文摘Distributed photovoltaic(PV)is one of the important power sources for building a new power system with new energy as the main body.The rapid development of distributed PV has brought new challenges to the operation of distribution networks.In order to improve the absorption ability of large-scale distributed PV access to the distribution network,the AC/DC hybrid distribution network is constructed based on flexible interconnection technology,and a coordinated scheduling strategy model of hydrogen energy storage(HS)and distributed PV is established.Firstly,the mathematical model of distributed PV and HS system is established,and a comprehensive energy storage system combining seasonal hydrogen energy storage(SHS)and battery(BT)is proposed.Then,a flexible interconnected distribution network scheduling optimization model is established to minimize the total active power loss,voltage deviation and system operating cost.Finally,simulation analysis is carried out on the improved IEEE33 node,the NSGA-II algorithm is used to solve specific examples,and the optimal scheduling results of the comprehensive economy and power quality of the distribution network are obtained.Compared with the method that does not consider HS and flexible interconnection technology,the network loss and voltage deviation of this method are lower,and the total system cost can be reduced by 3.55%,which verifies the effectiveness of the proposed method.
文摘In this work,an Artificial Neural Network(ANN)based technique is suggested for classifying the faults which occur in hybrid power distribution systems.Power,which is generated by the solar and wind energy-based hybrid system,is given to the grid at the Point of Common Coupling(PCC).A boost converter along with perturb and observe(P&O)algorithm is utilized in this system to obtain a constant link voltage.In contrast,the link voltage of the wind energy conversion system(WECS)is retained with the assistance of a Proportional Integral(PI)controller.The grid synchronization is tainted with the assis-tance of the d-q theory.For the analysis of faults like islanding,line-ground,and line-line fault,the ANN is utilized.The voltage signal is observed at the PCC,and the Discrete Wavelet Transform(DWT)is employed to obtain different features.Based on the collected features,the ANN classifies the faults in an effi-cient manner.The simulation is done in MATLAB and the results are also validated through the hardware implementation.Detailed fault analysis is carried out and the results are compared with the existing techniques.Finally,the Total harmonic distortion(THD)is lessened by 4.3%by using the proposed methodology.
文摘China Southern Power Grid is a unique EHV AC/DC hybrid transmission network that operates in China. In its service area, the distribution of energy resources and the development of economy are extremely unbalanced, so long-distance and bulk power transmission are needed; besides, the geography and climate conditions are serious, rains, fogs, lightning and typhoon as well as high temperature are common all the year round. Facing these challenges, the power grid enhanced stability control, improved the equipment and strengthen the network structure. In the future, the power grid plans to optimize the disposition of power sources and build digitalized power system.
文摘GaN (gallium nitride) buck-rectifier has been proposed to realize high power density ISOP (input series and output parallel)-IPOS (input parallel and output series) converter-based dc distribution system. The ultra-low loss bi-directional switch can be developed by the GaN power device because of the low on-resistance, the high-speed switching behavior and its own device structure. The buck-rectifier using the GaN bi-directional switches has the potential to achieve higher power density than the commonly utilized boost-rectifier. Availability of the GaN-HEMT (high electron mobility transistor) for the buck rectifier has been verified taking the theoretical limit of the on-resistance and the switching loss energy into account. Design consideration for a high power density buck-rectifier has been also conducted and the application effect of the GaN bidirectional switches has been evaluated quantitatively. The ISOP-IPOS converter-based dc (direct current) distribution system takes full advantage of the buck-rectifier and the rectifier using GaN devices contributes to realizing higher power density dc distribution system.
基金supported by Universiti Sains Malaysia through Research University Team(RUTeam)Grant Scheme(No.1001/PELECT/8580011)。
文摘The increasing flexibility of active distribution systems(ADSs)coupled with the high penetration of renewable distributed generators(RDGs)leads to the increase of the complexity.It is of practical significance to achieve the largest amount of RDG penetration in ADSs and maintain the optimal operation.This study establishes an alternating current(AC)/direct current(DC)hybrid ADS model that considers the dynamic thermal rating,soft open point,and distribution network reconfiguration(DNR).Moreover,it transforms the optimal dispatching into a second-order cone programming problem.Considering the different control time scales of dispatchable resources,the following two-stage dispatching framework is proposed.d dispatch uses hourly input data with the goal(1)The day-ahea of minimizing the grid loss and RDG dropout.It obtains the optimal 24-hour schedule to determine the dispatching plans for DNR and the energy storage system.(2)The intraday dispatch uses 15-min input data for 1-hour rolling-plan dispatch but only executes the first 15 min of dispatching.To eliminate error between the actual operation and dispatching plan,the first 15 min is divided into three 5-min step-by-step executions.The goal of each step is to trace the tie-line power of the intraday rolling-plan dispatch to the greatest extent at the minimum cost.The measured data are used as feedback input for the rolling-plan dispatch after each step is executed.A case study shows that the comprehensive cooperative ADS model can release the line capacity,reduce losses,and improve the penetration rate of RDGs.Further,the two-stage dispatching framework can handle source-load fluctuations and enhance system stability.
文摘In a hybrid AC/DC medium voltage distribution network, distributed generations(DGs), energy storage systems(ESSs), and the voltage source converters(VSCs)between AC and DC lines, have the ability to regulate node voltages in real-time. However, the voltage regulation abilities of above devices are limited by their ratings. And the voltage regulation efficiencies of these devices are also different. Besides, due to high r/x ratio, node voltages are influenced by both real and reactive power. In order to achieve the coordinated voltage regulation in a hybrid AC/DC distribution network, a priority-based real-time control strategy is proposed based on the voltage control effect of real and reactive power adjustment. The equivalence of real and reactive power adjustment on voltage control is considered in control area partition optimization, in which regulation efficiency and capability are taken as objectives.In order to accommodate more DGs, the coordination of controllable devices is achieved according to voltage sensitivities. Simulations studies are performed to verify the proposed method.
基金supported by the National Key Research and Development Program of China(No.2018YFB0904600)the National Natural Science Foundation of China(No.52077017)。
文摘The two main challenges of medium voltage direct current(MVDC)distribution network are the flexible control of power flow(PF)and fault protection.In this paper,the power flow controller(PFC)is introduced to regulate the PF and inhibit the fault current during the DC fault.The coordination strategy of series-parallel PFC(SP-PFC)and hybrid DC circuit breaker(DCCB)is proposed.By regulating the polarity and magnitude of SP-PFC output voltage during the fault,the rising speed of fault current can be suppressed so as to reduce the breaking current of hybrid DCCB.The access mode of SP-PFC to the MVDC distribution network and its topology are analyzed,and the coordination strategy between SP-PFC and hybrid DCCB is investigated.Moreover,the emergency control and bypass control strategies of SP-PFC are developed.On this basis,the mathematical model of SP-PFC in different fault stages is derived.With the equivalent model of SP-PFC,the fault current of the MVDC distribution network can be calculated accurately.A simulation model of the MVDC distribution network containing SP-PFC is established in MATLAB/Simulink.The fault current calculation result is compared with the simulation result,and the effectiveness of the proposed coordination strategy is verified.
基金This work was supported in part by the National Nature Science Foundation of China(51977142)。
文摘The concept of a flexible power electronics substation(FPES)was first applied in the Zhangbei DC distribution network demonstration project.As a multi-port power electronics transformer(PET)with different AC and DC voltage levels,the FPES has adopted a novel topology integrating modular multilevel converter(MMC)and four-winding medium frequency transformer(FWMFT)based multiport DC-DC converter,which can significantly reduce capacitance in each sub-module(SM)of a MMC and also save space and cost.In this paper,in order to accelerate speed of electromagnetic transient(EMT)simulations of FPES based hybrid AC/DC distribution systems,an averaged-value model(AVM)is proposed for efficient and accurate representation of FPES.Assume that all SM capacitor voltages are perfectly balanced in the MMC,then the MMC behavior can be modeled using controlled voltage sources based on modulation voltages from control systems.In terms of the averaged current transfer characteristics among the windings of the FWMFT,we consider that all multiport DC-DC converters are controlled with the same dynamics,a lumped averaged model using controlled current and voltage sources has been developed for these four-port DC-DC converters connected to the upper or lower arms of the MMC.The presented FPES AVM model has been tested and validated by comparison with a detailed IGBT-based EMT model.Results show that the AVM is significantly more efficient while maintaining its accuracy in an EMT simulation.
基金supported in part by the National Natural Science Foundation of China(No.51777134)in part by a joint project of NSFC of China and EPSRC of UK(No.52061635103 and EP/T021969/1).
文摘The upscaling requirements of energy transition highlight the urgent need for ramping up renewables and boosting system efficiencies.However,the stochastic nature of excessive renewable energy resources has challenged stable and efficient operation of the power system.Battery energy storage systems(BESSs)have been identified as critical to mitigate random fluctuations,unnecessary green energy curtailment and load shedding with rapid response and flexible connection.On the other hand,an AC/DC hybrid distribution system can offer merged benefits in both AC and DC subsystems without additional losses during AC/DC power conversion.Therefore,configuring BESSs on an AC/DC distribution system is wellpositioned to meet challenges brought by carbon reductions in an efficient way.A bi-level optimization model of BESS capacity allocation for AC/DC hybrid distribution systems,considering the flexibility of voltage source converters(VSCs)and power conversion systems(PCSs),has been established in this paper to address the techno-economic issues that hindered wide implementation.The large-scale nonlinear programming problem has been solved utilizing a genetic algorithm combined with second-order cone programming.Rationality and effectiveness of the model have been verified by setting different scenarios through case studies.Simulation results have demonstrated the coordinated operation of BESS and AC/DC hybrid systems can effectively suppress voltage fluctuations and improve the cost-benefit of BESSs from a life cycle angle.