期刊文献+
共找到1,678篇文章
< 1 2 84 >
每页显示 20 50 100
A novel optical burst switching architecture for high speed networks 被引量:2
1
作者 Amit Kumar Garg R.S.Kaler 《Chinese Optics Letters》 SCIE EI CAS CSCD 2008年第11期807-811,共5页
A novel optical burst switching (OBS) high speed network architecture has been proposed. To verify its feasibility and evaluate its performance, just-enough-time (JET) signaling has been considered as a high perfo... A novel optical burst switching (OBS) high speed network architecture has been proposed. To verify its feasibility and evaluate its performance, just-enough-time (JET) signaling has been considered as a high performance protocol. In the proposed architecture, to avoid burst losses, firstly, a short-prior- confirmation-packet (SPCP) is sent over the control channel that simulates the events that the actual packet will experience. Once SPCP detects a drop at any of the intermediate nodes, the actual packet is not sent but the process repeats. In order to increase network utilization, cost effectiveness and to overcome some limitations of conventional OBS, inherent codes (e.g., orthogonal optical codes (OOC)), which are codified only in intensity, has been used. Through simulations, it shows that a decrease in burst loss probability, cost effectiveness and a gain in processing time are obtained when optical label processing is used as compared with electronic processing. 展开更多
关键词 NODE OBS A novel optical burst switching architecture for high speed networks LENGTH high
原文传递
Key technologies of earthquake early warning system for China’s high-speed railway
2
作者 Geming Zhang Lin Yang Wenxiang Jiang 《Railway Sciences》 2024年第2期239-262,共24页
Purpose–The purpose of this study is to introduce the top-level design ideas and the overall architecture of earthquake early-warning system for high speed railways in China,which is based on P-wave earthquake early-... Purpose–The purpose of this study is to introduce the top-level design ideas and the overall architecture of earthquake early-warning system for high speed railways in China,which is based on P-wave earthquake early-warning and multiple ways of rapid treatment.Design/methodology/approach–The paper describes the key technologies that are involved in the development of the system,such as P-wave identification and earthquake early-warning,multi-source seismic information fusion and earthquake emergency treatment technologies.The paper also presents the test results of the system,which show that it has complete functions and its major performance indicators meet the design requirements.Findings–The study demonstrates that the high speed railways earthquake early-warning system serves as an important technical tool for high speed railways to cope with the threat of earthquake to the operation safety.The key technical indicators of the system have excellent performance:The first report time of the P-wave is less than three seconds.From the first arrival of P-wave to the beginning of train braking,the total delay of onboard emergency treatment is 3.63 seconds under 95%probability.The average total delay for power failures triggered by substations is 3.3 seconds.Originality/value–The paper provides a valuable reference for the research and development of earthquake early-warning system for high speed railways in other countries and regions.It also contributes to the earthquake prevention and disaster reduction efforts. 展开更多
关键词 Earthquake early-warning high speed railway China earthquake networks center(CENC) Earthquake emergency treatment
下载PDF
Extraction Fuzzy Linguistic Rules from Neural Networks for Maximizing Tool Life in High-speed Milling Process 被引量:2
3
作者 SHEN Zhigang HE Ning LI Liang 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2009年第3期341-346,共6页
In metal cutting industry it is a common practice to search for optimal combination of cutting parameters in order to maximize the tool life for a fixed minimum value of material removal rate(MRR). After the advent ... In metal cutting industry it is a common practice to search for optimal combination of cutting parameters in order to maximize the tool life for a fixed minimum value of material removal rate(MRR). After the advent of high-speed milling(HSM) pro cess, lots of experimental and theoretical researches have been done for this purpose which mainly emphasized on the optimization of the cutting parameters. It is highly beneficial to convert raw data into a comprehensive knowledge-based expert system using fuzzy logic as the reasoning mechanism. In this paper an attempt has been presented for the extraction of the rules from fuzzy neural network(FNN) so as to have the most effective knowledge-base for given set of data. Experiments were conducted to determine the best values of cutting speeds that can maximize tool life for different combinations of input parameters. A fuzzy neural network was constructed based on the fuzzification of input parameters and the cutting speed. After training process, raw rule sets were extracted and a rule pruning approach was proposed to obtain concise linguistic rules. The estimation process with fuzzy inference showed that the optimized combination of fuzzy rules provided the estimation error of only 6.34 m/min as compared to 314 m/min of that of randomized combination of rule s. 展开更多
关键词 high-speed milling rule extraction neural network fuzzy logic
下载PDF
A Real-Time TCP Stream Reassembly Mechanism in High-Speed Network 被引量:3
4
作者 熊兵 陈晓苏 陈宁 《Journal of Southwest Jiaotong University(English Edition)》 2009年第3期185-191,共7页
With the continual growth of the variety and complexity of network crime means, the traditional packet feature matching cannot detect all kinds of intrusion behaviors completely. It is urgent to reassemble network str... With the continual growth of the variety and complexity of network crime means, the traditional packet feature matching cannot detect all kinds of intrusion behaviors completely. It is urgent to reassemble network stream to perform packet processing at a semantic level above the network layer. This paper presents an efficient TCP stream reassembly mechanism for real-time processing of high-speed network traffic. By analyzing the characteristics of network stream in high-speed network and TCP connection establishment process, several polices for designing the reassembly mechanism are built. Then, the reassembly implementation is elaborated in accordance with the policies. Finally, the reassembly mechanism is compared with the traditional reassembly mechanism by the network traffic captured in a typical gigabit gateway. Experiment results illustrate that the reassembly mechanism is efficient and can satisfy the real-time property requirement of traffic analysis system in high-speed network. 展开更多
关键词 TCP stream reassembly high-speed network Real-time property Reassembly policy
下载PDF
A Genetic Based Fuzzy Q-Learning Flow Controller for High-Speed Networks 被引量:2
5
作者 Xin LI Yuanwei JING +1 位作者 Nan JIANG Siying ZHANG 《International Journal of Communications, Network and System Sciences》 2009年第1期84-89,共6页
For the congestion problems in high-speed networks, a genetic based fuzzy Q-learning flow controller is proposed. Because of the uncertainties and highly time-varying, it is not easy to accurately obtain the complete ... For the congestion problems in high-speed networks, a genetic based fuzzy Q-learning flow controller is proposed. Because of the uncertainties and highly time-varying, it is not easy to accurately obtain the complete information for high-speed networks. In this case, the Q-learning, which is independent of mathematic model, and prior-knowledge, has good performance. The fuzzy inference is introduced in order to facilitate generalization in large state space, and the genetic operators are used to obtain the consequent parts of fuzzy rules. Simulation results show that the proposed controller can learn to take the best action to regulate source flow with the features of high throughput and low packet loss ratio, and can avoid the occurrence of congestion effectively. 展开更多
关键词 high-speed network Flow Control FUZZY Q-LEARNING GENETIC OPERATOR
下载PDF
PREDICTION OF FLOW STRESS OF HIGH-SPEED STEEL DURING HOT DEFORMATION BY USING BP ARTIFICIAL NEURAL NETWORK 被引量:2
6
作者 J. T. Liu H.B. Chang +1 位作者 R.H. Wu T. Y. Hsu(Xu Zuyao) and X.R. Ruan( 1)Department of Plasticity Technology, Shanghai Jiao Tong University, Shanghai 200030, China 2)School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200030, 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2000年第1期394-400,共7页
The hot deformation behavior of TI (18W-4Cr-1V) high-speed steel was investigated by means of continuous compression tests performed on Gleeble 1500 thermomechan- ical simulator in a wide range of tempemtures (950℃... The hot deformation behavior of TI (18W-4Cr-1V) high-speed steel was investigated by means of continuous compression tests performed on Gleeble 1500 thermomechan- ical simulator in a wide range of tempemtures (950℃-1150℃) with strain rotes of 0.001s-1-10s-1 and true strains of 0-0. 7. The flow stress at the above hot defor- mation conditions is predicted by using BP artificial neural network. The architecture of network includes there are three input parameters:strain rate,temperature T and true strain , and just one output parameter, the flow stress ,2 hidden layers are adopted, the first hidden layer includes 9 neurons and second 10 negroes. It has been verified that BP artificial neural network with 3-9-10-1 architecture can predict flow stress of high-speed steel during hot deformation very well. Compared with the prediction method of flow stress by using Zaped-Holloman parumeter and hyperbolic sine stress function, the prediction method by using BP artificial neurul network has higher efficiency and accuracy. 展开更多
关键词 T1 high-speed steel flow stress prediction of flow stress back propagation (BP) artificial neural network (ANN)
下载PDF
Cascading Delays for the High-Speed Rail Network Under Different Emergencies:A Double Layer Network Approach
7
作者 Xingtang Wu Mingkun Yang +3 位作者 Wenbo Lian Min Zhou Hongwei Wang Hairong Dong 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2023年第10期2014-2025,共12页
High-speed rail(HSR) has formed a networked operational scale in China. Any internal or external disturbance may deviate trains’ operation from the planned schedules, resulting in primary delays or even cascading del... High-speed rail(HSR) has formed a networked operational scale in China. Any internal or external disturbance may deviate trains’ operation from the planned schedules, resulting in primary delays or even cascading delays on a network scale. Studying the delay propagation mechanism could help to improve the timetable resilience in the planning stage and realize cooperative rescheduling for dispatchers. To quickly and effectively predict the spatial-temporal range of cascading delays, this paper proposes a max-plus algebra based delay propagation model considering trains’ operation strategy and the systems’ constraints. A double-layer network based breadth-first search algorithm based on the constraint network and the timetable network is further proposed to solve the delay propagation process for different kinds of emergencies. The proposed model could deal with the delay propagation problem when emergencies occur in sections or stations and is suitable for static emergencies and dynamic emergencies. Case studies show that the proposed algorithm can significantly improve the computational efficiency of the large-scale HSR network. Moreover, the real operational data of China HSR is adopted to verify the proposed model, and the results show that the cascading delays can be timely and accurately inferred, and the delay propagation characteristics under three kinds of emergencies are unfolded. 展开更多
关键词 Delay propagation double layer network high speed rail network max-plus algebra
下载PDF
Sensitivity analysis of distributed parameter elements in high-speed circuit networks
8
作者 Lei DOU Zhiquan WANG 《控制理论与应用(英文版)》 EI 2007年第1期53-56,共4页
This paper presents an analysis method, based on MacCormack's technique, for the evaluation of the time domain sensitivity of distributed parameter elements in high-speed circuit networks. Sensitivities can be calcul... This paper presents an analysis method, based on MacCormack's technique, for the evaluation of the time domain sensitivity of distributed parameter elements in high-speed circuit networks. Sensitivities can be calculated from electrical and physical parameters of the distributed parameter elements. The proposed method is a direct numerical method of time-space discretization and does not require complicated mathematical deductive process. Therefore, it is very convenient to program this method. It can be applied to sensitivity analysis of general transmission lines in linear or nonlinear circuit networks. The proposed method is second-order-accurate. Numerical experiment is presented to demonstrate its accuracy and efficiency. 展开更多
关键词 Sensitivity analysis Distributed parameter Multiconductor transmission fines high-speed circuit networks MacCormack method
下载PDF
Analysis of Dual-Core Type City and Its Hinterland Contact Pattern under the Background of High-Speed Rail Networking—Urban Agglomeration in Zhejiang Province as an Example
9
作者 Xiaohong Ren 《Journal of Transportation Technologies》 2016年第4期207-217,共12页
Under the background of high-speed rail networking, this paper uses the passenger trains, the type and direction of the railway via Hang Yong and its extension road line, to construct adsorption and dependency index a... Under the background of high-speed rail networking, this paper uses the passenger trains, the type and direction of the railway via Hang Yong and its extension road line, to construct adsorption and dependency index among cities, depict the contact pattern between the Hang Yong dual-core and its hinterland, measure the “net effect” that two center cities (Hangzhou, Ningbo) have on their hinterland, and estimate population agglomeration potential and future possible population flows of Zhejiang Province and the main sample cities. The result shows that, compared with Ningbo, Hangzhou has stronger radiation force to the vast majority of sample cities, and the sample cities affected more by Ningbo mainly concentrates in Ningbo-Taizhou-Wenzhou along;in addition, the sample cities such as Hangzhou, Ningbo and so on show better population agglomeration, then the population “scramble” phenomenon between cities has begun to appear. 展开更多
关键词 high-speed Rail networking Contact Pattern Measurement
下载PDF
Challenges of the Performance Standards of the International Finance Corporation in Financing the African Integrated High-Speed Railway Network and the Way Forward: The Case of Standard Gauge Railway in Tanzania
10
作者 Emmanuele Elifadhili Mchome Uwezo Wilbard Nzoya 《Journal of Transportation Technologies》 2023年第4期772-788,共17页
Financing of the African Integrated High-Speed Railway Network (AIHSRN) through Standard Gauge Railway (SGR) Projects is very expensive. As a result, most of the African countries seek financial supports from the Inte... Financing of the African Integrated High-Speed Railway Network (AIHSRN) through Standard Gauge Railway (SGR) Projects is very expensive. As a result, most of the African countries seek financial supports from the International Financial Institutions (IFIs). However, conditions provided by the IFIs through the Performance Standards (PS) of the International Financial Corporation (IFC) increase cost of the projects and thus, it becomes a burden to most of the African countries. This study aimed to explore the causes of IFC-PS through the SGR Projects that escalate costs and how to address them. The Tanzania SGR Lot 1 Project that covered 205 km from Dar es Salaam to Morogoro was selected as a case study. The methods used for data collection involved literature review, focus group discussions and interviews. The results and findings show a gap between the IFC-PS and the National Laws and Regulations that escalates costs of the projects if funds from the IFIs were to be secured. To bridge the gap, it is recommended that the African countries should engage into negotiations with the IFIs to agree to waive IFC-PS conditions that escalate costs provided they are adequately covered in the national laws and regulations;engagement of locally established national and regional financial institutions;and the responsible government institutions in the African countries should sit together for assessment and review of the IFC-PS against the national laws and regulations. 展开更多
关键词 African Integrated high-speed Railway network International Financial Institutions Standard Gauge Railway Performance Standards
下载PDF
Study on Factors Affecting the Structure of High Speed Steel Ingot Produced by ESR 被引量:1
11
作者 Li Zhengbang Che Xiangqian 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 1996年第1期1-4,共4页
The influence of the metal pool depth and the local solidification time on the structure of high speed steel ingot produced by electroslag remelting (ESR) process has been studied by measuring the dendritic arm spacin... The influence of the metal pool depth and the local solidification time on the structure of high speed steel ingot produced by electroslag remelting (ESR) process has been studied by measuring the dendritic arm spacing and the size of the carbides. It is shown that the metal pool depth is a factor that influences the uniformity of the ESR ingot structure and not only the dendritic arm spacing, but also the size of the carbides can be influenced by the local solidification time in the solidification process of the ingot. The relationship between the melting rate during ESR process and the local solidification time has been studied. It is shown that there is an optimum melting rate at which the local solidification time is minimum as a result of the combination of the influence of the melt rate on the width of the local mushy zone and on the local solidification rate. The influence of the inoculants on the solidification structure of high speed steel produced by ESR has been studied and it is shown that the size of the grain can be significantly reduced by inoculation process. 展开更多
关键词 high speed steel electroslag remelting carbide network ledeburite size INOCULANT
下载PDF
High-Performance Network Communications for CSCW
12
作者 宋军 顾冠群 《Journal of Southeast University(English Edition)》 EI CAS 1996年第2期7-12,共6页
Computer supported cooperative work as a new multi disciplinary research area, brings a lot of new challenges for the computer technologies. Having analyzed the CSCW applications by using the groupware space time mat... Computer supported cooperative work as a new multi disciplinary research area, brings a lot of new challenges for the computer technologies. Having analyzed the CSCW applications by using the groupware space time matrix, we conclude that the communicatio 展开更多
关键词 CSCW high speed network MULTIMEDIA high performance COMMUNICATIONS platform
下载PDF
ANALYSIS OF THE TRANSMISSION PROPERTIES OF TAPERED MUTLICONDUCTOR INTERCONNECTING BUSES IN HIGH-SPEED INTEGRATED CIRCUITS
13
作者 王秉中 《Journal of Electronics(China)》 1994年第1期22-27,共6页
Analysis approach and formulas for the transmission properties of uniform multicon-ductor interconnecting buses in high-speed integrated circuits are presented in this article. And further, by using a network approach... Analysis approach and formulas for the transmission properties of uniform multicon-ductor interconnecting buses in high-speed integrated circuits are presented in this article. And further, by using a network approach, a tapered bus system can be analyzed as a set of cascaded uniform buses with slightly different strip widths. Obtained results are in good agreement with the experimental data. 展开更多
关键词 high speed integrated circuit INTERCONNECTION TRANSMISSION LINES network SCATTERING PARAMETER
下载PDF
Resource Allocation in D2D-Aided High-Speed Railway Wireless Communication Systems: A Matching Theory Approach
14
作者 Meilin Gao Bo Ai +3 位作者 Yong Niu Zhewei Zhang YanqingXu Dapeng Li 《China Communications》 SCIE CSCD 2017年第12期87-99,共13页
With the rapid deployment of high speed railway(HSR) worldwide,both safety operation and comfort experience can be desired to evolve into a future era of intelligent transportation system.To eliminate boredom and prov... With the rapid deployment of high speed railway(HSR) worldwide,both safety operation and comfort experience can be desired to evolve into a future era of intelligent transportation system.To eliminate boredom and provide entertainment for passengers,an intranet for internal communications among passengers named as onboard social network system(SNS) is needed.In this paper,the latest progress in HSR network architectures and technology building blocks are discussed to enable the implementation of the SNS.Meanwhile,based on the device-to-device(D2 D) communication technology for proximal information interaction,SNS can be efficiently facilitated.A dynamic resource allocation algorithm is proposed to maximize the total utility of the onboard SNS,which is solved with the matching theory method.Simulation results verify the convergence and efficiency of the proposed algorithm. 展开更多
关键词 D2D high speed RAILWAY match-ing theory resource ALLOCATION social networksystem
下载PDF
Medium-term forecast of daily passenger volume of high speed railway based on DLP-WNNMedium-term forecast of dailypassenger volume of high speedrailway based on DLP-WNN
15
作者 Tangjian Wei Xingqi Yang +1 位作者 Guangming Xu Feng Shi 《Railway Sciences》 2023年第1期121-139,共19页
Purpose – This paper aims to propose a medium-term forecast model for the daily passenger volume of HighSpeed Railway (HSR) systems to predict the daily the Origin-Destination (OD) daily volume formultiple consecutiv... Purpose – This paper aims to propose a medium-term forecast model for the daily passenger volume of HighSpeed Railway (HSR) systems to predict the daily the Origin-Destination (OD) daily volume formultiple consecutivedays (e.g. 120 days).Design/methodology/approach – By analyzing the characteristics of the historical data on daily passengervolume of HSR systems, the date and holiday labels were designed with determined value ranges.In accordance to the autoregressive characteristics of the daily passenger volume of HSR, the Double LayerParallel Wavelet Neural Network (DLP-WNN) model suitable for the medium-term (about 120 d) forecast of thedaily passenger volume of HSR was established. The DLP-WNN model obtains the daily forecast result byweighed summation of the daily output values of the two subnets. Subnet 1 reflects the overall trend of dailypassenger volumes in the recent period, and subnet 2 the daily fluctuation of the daily passenger volume toensure the accuracy of medium-term forecast.Findings – According to the example application, in which the DLP-WNN modelwas used for the medium-termforecast of the daily passenger volumes for 120 days for typical O-D pairs at 4 different distances, the averageabsolute percentage error is 7%-12%, obviously lower than the results measured by the Back Propagation (BP)neural network, the ELM (extreme learning machine), the ELMAN neural network, the GRNN (generalizedregression neural network) and the VMD-GA-BP. The DLP-WNN model was verified to be suitable for themedium-term forecast of the daily passenger volume of HSR.Originality/value – This study proposed a Double Layer Parallel structure forecast model for medium-termdaily passenger volume (about 120 days) of HSR systems by using the date and holiday labels and WaveletNeural Network. The predict results are important input data for supporting the line planning, scheduling andother decisions in operation and management in HSR systems. 展开更多
关键词 high speed railway Passenger flow forecast Daily passenger volume Medium-term forecast Wavelet neural network
下载PDF
基于Copula-network的相依部件系统可靠性计算 被引量:2
16
作者 李莉洁 贾利民 +1 位作者 王艳辉 秦勇 《中国安全科学学报》 CAS CSCD 北大核心 2016年第6期63-68,共6页
为解决传统系统可靠性的理论计算结果与实际不符合的问题,开展部件关联的系统可靠性网络化表征与计算研究。通过分析系统部件间的作用关系,以部件为节点,部件间作用关系为边,运用网络模型表征部件关联的复杂系统,重点研究利用部件的服... 为解决传统系统可靠性的理论计算结果与实际不符合的问题,开展部件关联的系统可靠性网络化表征与计算研究。通过分析系统部件间的作用关系,以部件为节点,部件间作用关系为边,运用网络模型表征部件关联的复杂系统,重点研究利用部件的服役行为信息,实现部件关联系统的可靠性分析。基于此,将多元Copula函数引入系统可靠性的计算中,建立基于Copula理论的可靠性网络模型及其数学表达;根据节点输入和输出情况差异,分情况计算部件关联系统可靠性;以高速列车转向架系统为背景,应用所建立方法并验证其有效性。结果表明,用基于Copula理论的部件关联系统可靠性网络化表征与计算方法,可对高速列车转向架系统可靠性进行有效分析与估计,为用网络评估复杂机电系统可靠性提供一种新方法。 展开更多
关键词 系统可靠性 COPULA函数 部件关联 网络模型 高速列车
下载PDF
Evacuated tube transport technologies (ET3)^(tm):a maximum value global transportation network for passengers and cargo 被引量:27
17
作者 Daryl OSTER Masayuki KUMADA Yaoping ZHANG 《Journal of Modern Transportation》 2011年第1期42-50,共9页
Evacuated Tube Transport Technologies (ET3) offers the potential for more than an order of magnitude improvement in transportation efficiency, speed, cost, and effectiveness. An ET3 network may be optimized to susta... Evacuated Tube Transport Technologies (ET3) offers the potential for more than an order of magnitude improvement in transportation efficiency, speed, cost, and effectiveness. An ET3 network may be optimized to sustainably displace most global transportation by car, ship, truck, train, and jet aircraft. To do this, ET3 standards should adhere to certain key principals: maximum value through efficiency, reliability, and simplicity; equal consideration for passenger and cargo loads; optimum size; high speed/high frequency operation; demand oriented; random accessibility; scalability; high granularity; automated control; full speed passive switching; open standards of implementation; and maximum use of existing capacities, materials, and processes. 展开更多
关键词 evacuated tube transport energy-savings high speed CARGO PASSENGER optimization GLOBAL network
下载PDF
Theory Analysis of the Handover Challenge in Express Train Access Networks (ETAN) 被引量:1
18
作者 HU Guoqing HUANG Anpeng +2 位作者 HE Ruisi AI Bo CHEN Zhangyuan 《China Communications》 SCIE CSCD 2014年第7期92-98,共7页
To handle the handover challenge in Express Train Access Networks(ETAN).mobility fading effects in high speed railway environments should be addressed first.Based on the investigation of fading effects in this paper,w... To handle the handover challenge in Express Train Access Networks(ETAN).mobility fading effects in high speed railway environments should be addressed first.Based on the investigation of fading effects in this paper,we obtain two theoretical bounds:HOTiming upper bound and HO-Margin lower bound,which are helpful guidelines to study the handover challenge today and in the future.Then,we apply them to analyze performance of conventional handover technologies and our proposal in ETAN.This follow-up theory analyses and simulation experiment results demonstrate that the proposed handover solution can minimize handover time up to 4ms(which is the fastest one so far),and reduce HO-Margin to 0.16 dB at a train speed of 350km/h. 展开更多
关键词 express train access network handover (HO) high speed railways HO-timing upper bound HO-margin lower bound
下载PDF
智慧高速铁路运行控制系统发展趋势综述 被引量:2
19
作者 余祖俊 唐涛 +2 位作者 李开成 宿帅 朱力强 《铁道学报》 EI CAS CSCD 北大核心 2024年第1期1-12,共12页
在保障安全的前提下,高速铁路运行控制系统进一步结合现代感知、控制、通信以及人工智能技术实现智慧化,是未来高速铁路发展的前沿方向。分析目前高速铁路运营中仍存在异物侵限造成安全事故、突发事件导致列车延误、运力与运量不匹配等... 在保障安全的前提下,高速铁路运行控制系统进一步结合现代感知、控制、通信以及人工智能技术实现智慧化,是未来高速铁路发展的前沿方向。分析目前高速铁路运营中仍存在异物侵限造成安全事故、突发事件导致列车延误、运力与运量不匹配等问题,提出高速铁路运行控制系统的智能化、智慧化是解决上述问题的重要手段,是保持和提升我国高速铁路技术整体竞争力的核心组成部分。新时期的智慧高速铁路运行控制系统以实现列车(群)全天候全无人自主追踪运行控制为目标,主要包括移动闭塞、列车运行净空感知、列车状态智能监测、列车自主追踪、智能调度指挥、车-地动态自组网通信等关键技术。结合新一代使能技术,研究高速铁路运行控制智能技术的应用及其发展趋势,对我国智慧高速铁路的发展具有参考价值。 展开更多
关键词 智慧高速铁路 运行控制 平稳追踪控制 智能感知 车-地自组网
下载PDF
空铁综合运输网络结构特征实证分析 被引量:1
20
作者 王飞 伍加伟 黄宝军 《科学技术与工程》 北大核心 2024年第7期2901-2908,共8页
为探究中国空铁综合运输网络结构特性,以城市为节点,若城市间有航班或高铁则连边,以航班数量和高铁数量为权重,分别建立了3个加权网络:高铁子网络、航空子网络和空铁综合运输网络。首先,通过均值关联、三角中介中心度、加权谐波中心度... 为探究中国空铁综合运输网络结构特性,以城市为节点,若城市间有航班或高铁则连边,以航班数量和高铁数量为权重,分别建立了3个加权网络:高铁子网络、航空子网络和空铁综合运输网络。首先,通过均值关联、三角中介中心度、加权谐波中心度指标对比研究了不同网络的关键节点;其次,通过聚类系数和平均最短路径长度研究了三个网络的小世界特性;再次,通过Newman算法研究了三个网络的社团结构;最后,通过加权网络效率为指标,研究了三个网络的鲁棒性。研究结果表明,北上广深是三个网络的三种不同加权中心度的排名都很靠前,是共有的最为关键的节点。三个网络都具有小世界特性,但只有高铁子网络的模块度值大于0.3,存在明显的社团结构,并被划分为了10个社团。空铁综合运输网络具有更好的加权网络效率,约为0.32,为三个网络中最高,节点失效时的加权效率变化最小,鲁棒性最强。可见空铁综合运输网络集成了高铁网络、航空网络的互补优势,网络结构特征优于单一运输网络。 展开更多
关键词 综合运输 空铁综合运输加权网络 节点中心度 网络社团结构 网络鲁棒性
下载PDF
上一页 1 2 84 下一页 到第
使用帮助 返回顶部